Text
Ydi INDIANA L MICHIGAN ELECTRIC COMPANY P. O. BOX 18 Bo WLIN G GR E EN STATION NEW YORK, N. Y. 10004 Donald C.
Cook Nuclear Plant Units 1 and 2
Docket Nos.
50-315 and 50-316 License Nos.
DPR-58 and DPR-74 August 4, 1980 AEP:NRC:00448 g+-
/gl
/
Mr. J.
G. Keppler, Regional Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Mr. Keppler:
This letter provides the required response to the notice of violation attached as Appendix A to Mr. R. F. Heishman's letter dated July 10, 1980 and received on July 15, 1980.
The corrective actions taken in response to the item in the notice, classified as an infraction, follow:
CORRECTIVE ACTIONS The review documents are issued as a single document with only one cover sheet.
All required individuals must sign to indicate review before the document is sent back to the Training Department.
These individuals may not all be available at the time of issue due to vacation, sickness, off-site simulator training, or other special assignments.
In this case, the document is allowed to remain as an open item.
The Shift Operating Engineer ultimately follows the matter up and insures that review is docu-mented.
The importance of such followup has been stressed to the Shift IV SOE.
In the present
- case, required reviews will be brought up to date by August 15, 1980.
Very tr ly yours, cc:
(Attached)
. Hunter Vice President 7 g@l 840985~ P7)
Mr'. J.
G. Keppler AEP:NRC'00448 cc:
R.
C. Callen G. Charnoff D. V. Shaller - Bridgman John E. Dolan R.
W. Jurgensen