A endix A NOTICE OF VIOLATION American Electric Power Service Corporation Docket No. 50-315 Docket No. 50-316 Based on the inspection conducted from January ll-March 31, 1980, it appears that certain of your activities were in noncompliance with NRC requirements, as noted below.
Items 1 and 2 are infractions and apply to both units.
1.
Technical Specification 6.8'.1 requires implementation of procedures.
12-0HP-4021.018.004 "Draining or Adjusting Level in the Spent Fuel Pit" details the procedure for raising level in the SFP.
Contrary to the above, this procedure was not used for increasing level in the SFP between March 15, 1980 and March 17,
- 1980, when the pool was overfilled and cross-contamination of the demineralized water system occurred.
Amendment f32 to NRC Operating License Number DPR-58 and Amendment i/13 to DPR-74 require a minimum of 2000 ppm Boron concentration in the Spent Fuel Pit during changeout from old racks to new high density fuel storage racks.
Contrary to the above, on March 17, 1980, the SFP concentration was found to be less than 2000 ppm.(1954 ppm).