Confirms 791219 Verbal Rept to Re Masse Re Nonconformance in Small Piping Sys.Analysis Indicated That 1-inch Pipe Between Primary Piping & Excess let-down Heat Exchanger Would Be Stressed Above Yield Limit in Event of Earthquake
ML17318A517
Person / Time
Site: Cook 
Issue date: 12/20/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-14, NUDOCS 7912270337
Download: ML17318A517 (3)


Text

REGULATOO INFORMATION OISTRISUTION%STEM (RIOS)

DOCKET OSi) 0O31e ACCESSION NBR: 7912270337 DOC ~ DATE ~ 79/12/20 NOTARIZED!

NO "FACIL:50 316 Donald C ~

Cook Nuclear Powei Planti Onit= 2i Indiana 8

AUTH ~ NAME AU'tHOR AFFILIATION SHALLKRiD,VS Ind)ana 8 Aichigan Power Co, REC Il ~ NAME RECIPIENT AFFILIATION KEF'PLERrJ ~ G ~

'Rag)on 3g Chicagoi Office of the Director 1

SUBJECT:

Confirms 791219 verbal rept to REI Masse re nonconformance in small piping aye Analysis indicated that

1. inch pipe between primary piping 8 excess,let down heat exchanger-would be sti essed above yield limit in event of earthquake, DISTRIBUTION CODE:

A002S COPIES RECEIVED ~ LTR g ENCL) LJ SIZE:

TITLE: InciBent Reports NOTES: @W~ 4 MQ CLE 'PJ.h=ha lC MBLCRQd -9 RtCIPII NT COPIES RECIPIENT COPIES IO CODE/NAME rTTR ENCL IO COOKiNAMK:

LTTR 'ENCL.

ACTION; 05 BC~

INTERNAL:

0 09 18K 14 TA/KDO 16 EEB 18 PLANT SYS BR 20 AD PLAAT, SYS 23 KNGA BR 25 PHR SYS BR 27 OPKRA LIC BR 29 AUX SYS BR HANAUERtS ~

STS GROUP LEADR EXTERNALA 03 LPOR.

29 ACRS 1

2 1iii 1

1 1

i i

1 16 02 NRC PDR 11 MPA 15 NOVAK/KNIKL',

i7 AD FOR ENGR 19 I8C'YS BA 22 RKAC 8AFT BR

?4 KREGER 26 AD/SITE ANAL 2S ACOENT AAL'9S E JORDAN/IE R

IRELAND

'MI~H STREE'T>>

00 NS IC.

ggy 1980 TOTAL NUMBER OF COPIES REQUIRKDA LTTR ~

ENCL

~ g~-e ll>

ll II 1

II A

il

~O Amer4oen

/~leeerka iNDIANA8 MICHIGANPOKER CDMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 December 20, 1979 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316

Dear Mr. Keppler:

This is to confirm our verbal report to NRC Region III Inspector, Mr. R.E. Masse, at 1620 hours0.0188 days <br />0.45 hours <br />0.00268 weeks <br />6.1641e-4 months <br /> on December 19, 1979.

At that time we reported that as part of the inspection and analysis process mandated by IE Bulletin 79-14, a significant non-conformance was identified in a small piping system of Unit 2'f the Cook Plant.

This significant non-conformance arose because of a discrepancy between the piping design analysis and the "as-built" condition.

The piping involved is a 1.0" diameter line, connected between the primary piping and the excess let-down heat exchanger.

Reanalysis indicated that the 1.0" diameter pipe would be stressed above the yield limit in the unlikely event that the Design Basis Earthquake occurs.

The piping system was reanalyzed with two additional restraints and all the stresses were found to be within the code allowable limit.

The modification is being imple-mented in the Unit.

A followup report will be submitted by January 2,

1980, as required by Technical Specification Section 6.9.1.8.

Sincerely, D.V. Shaller Plant Manager

/bab cc:

J.E.

Dolan R.S. Hunter R.W. Jurgensen R.F. Kroeger R. Kilburn R.E.

Masse RO:III R.C. Callen MPSC G. Charnoff, Esq.

G. Olson J.M. Hennigan PNSRC J.F. Stietzel E.L. Townley Dir., IE (40 copies)