ML17318A475

From kanterella
Jump to navigation Jump to search
Forwards LER 79-038/01T-0
Date released: 05/31/2018 Download: ML17318A475


LER 79-038/01T-0:on 791114,boron Injection Flow Path Was Inadvertantly Made Inoperable to Perform Surveillance Testing.Caused by Charging Line Being Out of Svc for Sys Mod.Fuel Element Altered
ML17318A476
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 11/28/1979
From: Chadwell H
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17318A476 (2)
Forwards LER 79-038/01T-0
ML17318A474
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 11/28/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17318A474 (6)