Text
REBULA TORY INFAATION DISTRIBUTION SYSTEIRIBS)
ACCESSION NBR: 7911200358 DOC ~ DATE: 79/11/15 AOTAR IZED:
NO DOCKET FACIAL:50-315 Donald 0 ~
Cook Nuclear Power Plant~
Unit 1i Indiana 8
05000315 AOTHRNAME AUTHOR AFFILIATION SHALLEf4D,V~
Indiana 8
IUii'chig'an Power Co, RECAP ~ NAME RECIPIENT AFFILIATION KEPPL'ER'g J,G ~
Region 3R Cliicagog Office of the Director
SUBJECT:
Confirms 791115 telcon w/RE Masse re power interruptions Due to removal of breakerrpower interrupted from valves FMO-242 8
FMO-212 for 12 minutes
~ Turbine-driven auxiliary feedwater pum*p also inoperable, DISTRIBUTION CODE:
A002S COPIES RECEIVED:LTR l
ENCL TITLE: Incident Reports S I-ZE:~
RECIPIENT ID CODE/NaME ACTIONS 05 BC CYA.8 et= I INTERNALR 1
REG FIL 0
I" 14 TA/EDO ib EEB'8 PLANT SYS BR 20 AD PLANT SYS 23 ENGR BR 25 PAR SYS BR 27 OPERA LIC BR 29 AUX SYS BR HANAUERRS, TMI H STREET EXTERNAL: 03 LPDR 29 ACRS COPIES L'TTR ENC 1
2ii 1ii 1
1 1
1 1
1 16 1
RECIPIENT ID CODE/NAME 0?
NRC PDR 11 MPA 15 NOVAK/KNIEL i7 AD FOR "ENGH i9 I8C SYS BA 22 REAC SAFT BR 20 KRECEA 26 AD/SITE ANAL 28 ACDENT ANLYS E JORDAN/IE STS GROUP LEADR 04 NSIC COPIES LTTR ENCL W9 TOTAL NUMBER OF'OPIES REQUIRED o LTTR 48-ENCL
0 II
~ w
=
F
~
E Il
~ st~'
II I
W c'
p,
'll I '
M N
ge Ame~
r'leiea~
INDIANA MICHIGANPOKER CDMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, BIidgman, Michigan 49106 November 15, 1979 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315
Dear Mr. Keppler:
This is to confirm our verbal report to NRC Region III Inspector, Mr. R.E.'asse, at 1025 hours0.0119 days <br />0.285 hours <br />0.00169 weeks <br />3.900125e-4 months <br /> on November 15, 1979.
At that time we reported that due to the removal of a breaker, power was interrupted from two FMO valves (FMO-242 and 212) for a period of twelve (12) minutes.
During this period the Turbine Driven Auxiliary Feedwater Pump was also inoperable.
A followup report will be submitted by November 29,
- 1979, as required by Technical Specification Section 6.9.1.8.
Sincerely, D.V. Shaller Plant Manager
/bab cc:
J.E.
Dolan R.W. Jurgensen R.F. Kroeger R.W. Kilburn R.J. Vollen BPI'.E.
ifasse RO:III R.C. Callen MPSC P.W. Steketee, Esq.
R. Walsh, Esq.
G. Charnoff, Esq.
J.M. Hennigan G. Olson PNSRC J.F. Stietzel E.L. Townley Dir., IE (40 copies)
~Dir., MIPC (4 copies)
(