ML17318A341

From kanterella
Jump to navigation Jump to search
Confirms 791012 Verbal Rept Re Removal of Emergency Power from Unit 2 Turbine Driven Auxiliary Feed Pump While Unit 1 Motor Driven Auxiliary Feed Pump Was Out of Svc for Maint. Followup Rept Will Be Submitted by 791031
ML17318A341
Person / Time
Site: Cook 
Issue date: 10/17/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 7910220359
Download: ML17318A341 (3)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (BIDS)

ACCESSION NBR 0 79102? 0359 DOC ~ DATE: 79/10/17 NOTARIZED:

NO FACIL:50 316 Donald C,

Cook Nuclear Power Pl anti Unit 2r Indiana 8

AUTH ~ NAME, AUTHOR AFF ILIATION SHALLERRD.VS Indiana 8 Michigan Power Co ~

REC IP ~ NAPIE, REC IP IENT AFFILIATION KEPPLERRJ,G

~

Region 3~ Chicagor Office of the Director

SUBJECT:

Copfirms 791012 ver bal r.ept r e. r emoval of emergency power from Unit 2 turbine dr iven auxiliary feed pump white Unit 1

motor driven auxiliary, feed pump was out of svc for maint, Fol l owup r ept wi l l be submi t ted by 791031, DISTRIBUTION CODE:

MOOTS COPIES RECEIVED:LTRj ENCL g SIZE:

TITLE; LER (Backf i t)

DOCKET 05000316 NOTES ~ DB'A/2) <<9'cjS ALr rr7A72 'v' v-E

~

~

eeeeee r<<oMeewweeei<<Meee ee e<<e<<ee ee eeeeeeee0 weeMee eeaMweeeeMeeMeeMMMwMweeeeeeweeMMeeMwMMee RECIPIENT ID CODE/NAME COPIES RECIPIENT COPIES LTTR ENCL ID CODE'/NAME'TTR ENCL INTERNA-REG FY NSIC 1

1 2

1 1

02 NRC PDR MPA S

HANAUER EXTERNAL: 03 LPDR 1

1 0/

Q TOTAr NUMRFR OF COPTFS RFAUIRFO:

I.TTR W

FNCL

DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 October 17, 1979 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316

Dear Mr. Keppler:

This is to confirm our verbal report to NRC Region III Inspector, R.E. Masse, at 1010 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.84305e-4 months <br /> on October 17, 1979.

At that time we reported that emergency power was removed from the Unit 2 Turbine Driven Auxiliary Feed Pump concurrently with the Unit 1 Motor Driven Auxiliary Feed Pump being out of service for routine maintenance.

This left only the Unit 2 Motor Driven Auxiliary Feed Pump operable with emergency power for a time period of two hours and forty-five minutes.

All normal auxiliary power supplies were available during this time period.

A followup report will be submitted by October 31,

1979, as required by Technical Specification Section 6.9.1.8.

Sincerely, D.V. Shaller Plant Manager

/bab cc:

J.E.

Dolan R.W. Jurgensen R.F. Kroeger R. Kilburn R.J. Vollen BPI R.E.

Masse RO:III R.C. Callen MPSC P.W. Steketee, Esq.

R. Walsh, Esq.

G. Charnoff, Esq.

J.M. Hennigan G. Olson PNSRC J.F. Stietzel E.L. Townley Dir., IE (40 copies)

~Dir., MIPC (4-copies) q rszo23o 359