Forwards LER 79-046/03L-0
Date released: 05/31/2018 Download: ML17318A326


LER 79-046/03L-0:on 790905,during Full Length Control Rod Operability Test,Urgent Failure Alarm from Power Cabinet 2AC Was Received on Rod Control.Cause Could Not Be Found.Power Supply Reset & Operability Test Satisfactorily Completed