ML17317B411

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-034/03L-0 & 79-035/03L-0
Date released: 05/31/2018 Download: ML17317B411


LER 79-035/03L-0 on 790705:while Cleanup of Demineralized Water Sys Was in Process,Rcs Passed from Operational Mode 5 to Mode 4 & Isolation Valves Closed.Caused by Breakdown of Communication Between Cleanup Crew & Reactor Operator
ML17317B413
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/1979
From: Lease R
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B413 (2)
LER 79-034/03L-0 on 790705:during Plant Tour,Two Ice Condenser Intermediate Deck Doors Were Found Frozen Shut. Cause Not Determined.No Further Action Planned.Formerly Numbered Incorrectly as LER 79-034/03L-0
ML17317B412
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/1979
From: Michael Brown
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B412 (1)
Forwards LERs 79-034/03L-0 & 79-035/03L-0
ML17317B410
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B410 (1)