ML17317B406

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-024/03L-0 & 79-025/03L-0
Date released: 05/31/2018 Download: ML17317B406


LER 79-025/03L-0 on 790702:safety Valve Was Lifted on Steam Generator 3,which Brought Reactor to sub-critical Condition. Operation of Safety Valve Was within Allowed Setpoints.Gag Removed & High Power Trips Reset
ML17317B408
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/1979
From: Murphy C
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B408 (1)
LER 79-024/03L-0 on 790702:south Boric Acid Storage Tank & Boron Injection Tank Were Out of Spec While Unit Was in Hot Standby.Caused by Normal Fluctuation.Boric Acid Was Transferred to Tank
ML17317B407
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/1979
From: Murphy C
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B407 (1)
Forwards LERs 79-024/03L-0 & 79-025/03L-0
ML17317B405
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B405 (1)