Submits Status Rept of Licensee Actions on TMI Bulletins. Reactor Presently Shutdown for Repairs to Feedwater Line Cracks.Scheduled to Restart This Week
ML17317B399
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/28/1979
From: Wigginton D
Office of Nuclear Reactor Regulation
To: Gammill W
Office of Nuclear Reactor Regulation
References
NUDOCS 7908030327
Download: ML17317B399 (7)


Text

Docket No. 50-3 JUN 2 8 879 NOTE TO:

W. Gammill, Acting Assistant Director, Operating Reactor

Projects, DOR THRU:

FROt1:

A. Schwencer, Chief, Operating Reactors Branch ¹1,.DOR D. Wigginton. Project tlanager, Operating Reactors Branch ¹1, DOR

SUBJECT:

D.

C.

COOK UNIT 2 - LICENSING ACTIONS FOR RESTART Cook 2 has been down to repair cracks in the feedwater lines.

While it is down, we have taken the opportunity to clear up several actions and to.be sure we have adequate responses on the TflI incident so that no licensing action would prevent or delay startup.

The following is the status of these actions:

1)

Amendment 29 and ll to Cook 1 and 2 License issued June 21, 1979.

Cook had converted the 1 out of 3 to 2 out of 3 low pressurizer pressure logic for safety injection.

Pressurizer level bistabler had already been tripped as a result of THI 2.

2)

ISE Bulletin 79 Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts.

This is an I8E responsibility.

Cook 1

has been completed.

With an 80/ sampling, Cook 2 has less than a

5X failure rate which is within criteria.

Region III has indicated that responses to this bulletin are ok.

3)

IKE Bulletin 79-04 Velan Valves This an I8E responsibility.

From a cursory look last week, Region III indicated the response was adequate.

906080-3~1 CFFICC~

OURNAMCW OATC~

NRC PORM 318 (9-76) NRCM 0240

  • VC. OOVCRNMCNT FRINTINO OFFICCI

~ ~ 1 ~

~ T ~ ~

1 ~ T

C I

'r

~" OA~~

0

W. Gammill w20 4)

IKE Bulletin 79-.06A Three.Nile IsRarid Incident The BOE committeereviewed the Cook responses late last week.

Additional information was requested on Friday, June 22.

The utility responses were reviewe'd by Steve Varga on Saturday and further clarified by telephone.

On June 25th, the utility documented these responses in a letter to. Region III. I have been informed by Steve Varga, that the r'esponses are adequate for restart but must be supplemented by the utility for a completeness review later.

5)

I5E Bulletin 79)07 Seismic Stress Analysis of Safety Related Piping Based on Cook's initial response and additional infor-mation submitted ai on request, we issued a letter to the utility on June 22.

1979 transmitting our SER which concludes we find their reanalysis acceptable.

6)

Feedviater Line Cracks This problem was discovered at -Cook 2 and later confirmed on Cook l.

ISE has maintained the respon-sibility for=the review.

The review has included examinatiqg of the cracked material,,review of the modified design of the replacement

elbows, and in-strumentation of the affected area to b"-'ter determine

'the cause of the cracks.

EB/DOR and ISE agree with the above program and the return to power.

Based on.the above actions, there does not appear to be any licensing action that should delay the expected Cook Unit 2 return to power this week and Cook Unit 1 next week.

Distribution d.ddt T.C j J. Heltemes'RC PDR'.

Russell Buchanan L ocal PDR 3). Eisenhut TERA ORB Reading '.'igginton NRR Reading A. Schwencer B. Grimes C. Parrish cc:

Steve Varga S.

Varga, D. G. EisenhutV.

Noonan Noonan C.

Tramme11'.

Russell D. Wigginton, Project Manager-Operating Reactors Branch Pl Division of Operating Reactors OtdIdICC3H SURNAME~

~ ~

OAtII3H ramm

.........E.-Qarda

. J. Helte (XE)..

es

........DO. :.

1......

DW

'ton ;

'"'.06' '9"'"'..

DO B.l..........

c AS hwencer

-'."06/~g/79-'"--

NRC PORM 318 (976) NRCM 0240 Q V,S, OOVRRHMRHt I'RIHtIHO OIdIdICRI I ~ 7 ~

fO ~

'IO ~

47 t

f

'H I,

8 ~

~p,R REC(g PO Cy oO h

0

~~

I

+~

~O

++*<<+

Docket No. 50-316 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 June 28, 1979 NOTE TQ:

W. Gammill, Acting Assistant Director, Operating Reactor

Projects, DOR THRU:

A. Schwencer, Chief,.Operating Reactors Branch 81, DOR FROM:

D. Wigginton, Project Manager, Operating Reactors Branch 81, DOR

SUBJECT:

D.

C.

COOK UNIT 2 - LICENSING ACTIONS FOR RESTART Cook 2 has been down to repair cracks in the feedwater lines.

While it is down, we have taken the opportunity to clear up.several actions and to be sure we have adequate responses on the TMI incident so that no licensing action would prevent or delay startup.

The following is the status of these actions:

1)

Amendment 29 and ll to Cook 1

and 2 License issued June 21, 1979.

Cook had converted the 1 out of 3 to 2 out of 3 low pressurizer pressure logic for safety injection.

Pressurizer level bistables had already been tripped as a result of TMI 2.

2)

I8E Bulletin 79 Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts.

This is an I8E responsibility.

Cook 1

has been completed.

With an 805 sampling, Cook 2 has less than a

5%%d failure rate which is within criteria.

Region III has indicated that'esponses to this bulletin are ok.

3) 18E Bulletin 79-04 Velan Yalves This an 18E responsibility.

From a cursory look last week, Region III indicated the response was adequate.

c W. Gammill g)

C 4

6)

I8E Bulletin 79-06A Three Nile Island.Incident I

The BOE committeereviewed the Cook responses late last week.

Additional information was requested on Friday, June 22.

The utility responses were reviewed by Steve Varga on Saturday and further clarified by telephone.

On June 25th, the utility documented these responses in a letter to Region III.

I have been informed by Steve Yarga, that 'the responses are adequate for restart=but must'e supplemented by the utility.for a completeness review later.

I8E Bulletin 79-,07 Seismic Stress Analysis of Safety Related Piping Based on Cook's initial response and additional infor-mation submitted at our request, we issued a letter to the utility on'June 22, 1979 transmitting our SER which concludes we find their reanalysis acceptable.

Feedwater Line Cracks This problem was discovered at Cook 2 and later confir'med on Cook l.

I8E 'has maintained'he respon-sibility for the review.

The review has included examination of the cracked material, review of the modified design of the replacement

elbows, and in-strumentation of the affected area to better;determine the cause of the cracks.

EB/DOR and I&E agree with the above program and the return to power.

Based on the above actions, there does not appear to be any 1'icensing action that should delay the expected Cook Unit 2 return to power this week and Cook Unit 1 next week.

CC:

Steve Yarga D.

G; Eisenhut V. Noonan W. Russell.

C. Trammell E. Jordan (IE)

Heltemes D. Wigginto oject Nanager Operating Reactors Branch 81 Division of Operating Reactors