ML17317B189

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-015/03L-0 & 79-016/03L-0
Date released: 05/31/2018 Download: ML17317B189


LER 79-016/03L-0 on 790412:failure of Interlock,Which Prevents Opening Both Containment 650 Ft Level Airlock Doors.Caused by Slack in Actuator Cables & Weak Spring.One Cable & Spring Replaced
ML17317B191
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/09/1979
From: Wizner D
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B191 (2)
LER 79-015/03L-0 on 790409:during Plant Startup,Small Crack & Pinhole Leak Found in Body of FMO-232,at Inlet Side of Valve Adjacent to Weld.Cause of Crack Not Determined. Radiographs of Area Reviewed
ML17317B190
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/09/1979
From: Wizner D
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B190 (2)
Forwards LERs 79-015/03L-0 & 79-016/03L-0
ML17317B188
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/09/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B188 (2)