REGULA TOH Y ENFORllATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:7904120237 DOC,DATE: 79/04/05 NOTARIZED:
NO FAG IL'0 31 NALD C o COOK NUCI EAH POHEH PLAilTg UilIT 1
F INDIANA ff 0 316 'AL0 c ~
cooK NUcLEAR PowER PLANT llNIT 2 INDIANA 8 A
bl'A%
AUTHOH AFF1l TATIDN DOLA PJ'S INDIANA lf MICHIGAN POwER CO ~
HEC IP ~ idAtIE HECIP IENT AFF ILIATIUN KEPPLEHFJ
~ G ~
REGION 3
CHICAGO OFF ICE OF 1'HE O'IREC TOH
SUBJECT:
RESPONDS TO IE BULLETIN 78-12F 78-12A 6 78" 128 RE ATYPICAL WELD HA Tl II'EACTOR PRESSURE VESSELS
~ REQUESTS EXTENSION OF HESPONSE DATES DUE TO WESTINGHOUSE SUBt~11TAL SCHEDULE.
DOCKET 05000315(
050003161 OISTRISUT ION CUOE:
AOO IS COPIES RECEIVES:LTR J EiNCL iO SIZE T~
TITLE: GENERAL OISTRISUTIUN FOR AFTER ISSUANCE OF OPERATING LIC NOTES:~'F F "M~~
ALL ~AT&.
RFC IPIENT If) CODE/lAIAME ACTION:
05 BC IFl B A/
INTERNAL: 01 6
12 ISE 15 CORE PFRF BR 17 ENGR BR 19 PLANT SYS BH 21 EFLT TRT SYS EXTFRNAL: 03 l PPR 23 ACHS COPIES LTTR ENCL 1
16 1
HEC IP IENT ID CODE/NACRE 02 NHC POR 14 TA/EDO 16 AD SYS/PHOJ 18 REAC SFTY BR 20 EEB 22 BR INKiUlAlu 04 AS IC COPIES LTTR ENCL
~~R L3 1979 D
TOTAL NUllBEH OF COPIES HEQUIHED: LTTR 38 EIIlCL
INDIANA 5 MICHIGAN PDV/ER COMPANY P. O. BOX 18 BOWLING GREEN STATION NEW YORK, H. Y. 10004 April 5,1979 AEP:NRC:00097 Donald C.
Cook Nuclear Plant Units 1 and 2
Docket Nos. 50-315 and 50-316 License Nos.
DPR-58 and OPR-74 Mr. James G. Keppler, Director U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear i41r. Keppler:
Ref:
NRC-IE Bulletin No. 78-12,78-12A, 78-12B Atypical Meld Material in Reactor Pressure Vessels This is in response to the above referenced letter requesting information on the O. C.
Cook Nuclear Plant Reactor Vessel Meld material.
.Mestinghouse is currently collecting and compiling the necessary information from the reactor vessel fabricators.
Due to the volume of the information to be compiled, Westinghouse has informed AEP that the required information will be provided for the D.
C.
Cook Unit No.
1 by September 28, 1979 and for the D. C.
Cook Unit No.
2 by June 29, 1979.
Since the above dates exceed the response submittal time stated in IE Bulletin 78-12B,
- AEP, upon the advise of Westinghouse, hereby requests an extension to the response date as follov/s:
For D. C.
Cook Unit No.
1 October 31, 1979 For D. C.
Cook Unit No.
2 July 31, 1979 Very truly yours, JEO:clb ohn E. Dolan ice President V964x z Oa87!
Hr. James G. Keppler, Director April 5,1979 cc:
R.
C.
Ca 1 1 en
'. Charnoff R.
'leal sh P.
M. Steketee R. J. ~/ollen D. V. Shaller-8ridgman R.
W. Jurgensen