ML17317A967

From kanterella
Jump to navigation Jump to search
Forwards 1978 Annual Operating Rept
ML17317A967
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/01/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17317A968 List:
References
NUDOCS 7903070361
Download: ML17317A967 (4)


Text

ACCESS ION NBA FACIL:

aV 3

AU i

~i't SHALLERgD ~ VS RFCTP

~ NAME KEPPLERiJ

~ G ~

REGULATO INFORMATION DISTRIBUTION TEM (RIDS)

7903070361 OOC

~ DATE: 79/03/01 NO t'AR IZED:

NO DOCKET ¹ DONALD C.

COOK NUCLEAR POWER PLANT( UNIT 1

p INDIANA 5 05000315 ONAI D C.

COOK NUCLEAR POINTER PLANT UNIT 2 INDIANA 6 0S000316 AUTHOR AFF ILIATION INDIANA A,MICHIGAN PO'i'(ER CO ~

RECIPIENT AFFILIATION REGION 3n CHICAGO'FFICE OF THE DIRECTOR

SUBJECT:

FORWARDS "1978 ANNUAL OPERATING REPT'

(~~~a-g

~(5 DISTRIBUTION CODE:

AOOBS COPIES RECEIVED:LTR I

ENCL J SIZE:

Q+'~

TITLE: ANNUAL> SEMI-aNNUAL 8 MONTHLY OPERATING REPORTS (OL STAG No)ES.~+~@c p i C. ~~ L RECIPIENT ID CODE/NAME ACTION:

05 BC Qg.g~ t INTERNAL:

0 1

16 0 IR DOR 16 ENGR BR 20 PLANT SYS BR 22 CORE PERF BR EXTERNAL: 03 LPDR 24 NATL LAB Q6 C-26 ACRS COPIES LTTR ENCL 6

1 1

2 2

1" 1

1 1

1 1

1 1

2 2

1 1

15 15 REC IPIENT IO CODE/NAME 02 NRC PDR

'u MPA 17 AD SYS/PROJ 19 REAC SAFT BR 21 EEB 23 EFFL TR SYS 04 NSIC 2S BROOKHAVEN COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 40 ENCL 40

(.y.

ygg, IIVD!AIBA8 IWICHIGA/YPOPOVER CONPAIIIY DONALD C. COOK NUCLEAR PLANT P.O. Box 458. Bridgman, Michigan 49106 March 1, 1979 Mr. J.

G. Keppler, Regional Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region III 800 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Donald C.

Cook Nuclear Plant Docket Number 50-315 5 50-316 DPR Nos.

58 and 74 Two copies of the 1978 Annual Operating Report for the Donald C.

Cook Nuclear Plant are being transmitted to you under this cover letter.

The information contained in this report has been prepared pursuant to the requirements of Appendix A of the Donald C.

Cook Nuclear Plant Technical Specifications, and the requirements of 10 CFR 50.59.

Additional copies of this report have been transmitted to the 0'ffice of Inspection and Enforcement and Office of Management Information and Program Control of the USNRC as is specified in Regulatory Guide 10.1.

Sincerely yours, D.

V. Shaller Plant Manager DVS:pk cc:

See Page 2

Attachment s <aacork 9'l 905ik V,SQUQ

Mr. J.

G. Keppler Annual Operating Report - 1978 March 1, 1978 Page 2

cc:

G. Charnoff R.

C. Callen P.

W. Steketee R. Walsh R. J.

Vol 1 en J.

E.

Dolan R.

W. Jurgensen Director, Office of Inspection 5 Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 (40 copies)

U.S. Nuclear Regulatory Comnission Washin gton, D.C.

20555 (2 copi es )

~

I "0

n

\\