On 790226,Unit 1 Cd Diesel Was Inoperable & 1 AB Diesel Started.Field Not Established for 1 AB Diesel,Causing It to Be Declared Inoperable for Seven Minutes
ML17317A955
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/27/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 7903020359
Download: ML17317A955 (5)


Text

RECIP ~ NAME

, RECIPIENT AFFILIATION KEPPLER J ~ G ~

REGION 3

CHICAGO OFFICE OF THE DIRECTOR

SUBJECT:

ON 790226 UNIT 1

CD DIESEL WAS INOPERABLE 5

1 AB DIESEL, STARTED ~ FIELD NOT ESTABLISHED FOR 1

AB DIESEL'AUSING LATTER TO BE DECLARED INOPERABLE FOR SEVEN MINUTEST DISTRIBUTION CODE:

A002S COPIES RECEIVED:LTR Q ENCL ~

SIZE:

TITLE: INCIDENT REPORTS 3 <<~s

~lL ws~L 4

RECIPIENT COPIES RECIPIENT ID CODE/NAMP LTTR ENCL ID CODE/NAME 05 BC ORB+i COPIES LTTR ENCL ACTION:

REGULATOR INFORMATION DISTRIBUTION'TEM (RIDS) e,,,

DOCKET 0

FACIL:50" 315 DONALD C ~

COOK NUCLEAR POWER PLANTi UNIT 1i INDIANA 5 05000315 AUTH BYNAME AUTHOR AFFILIATION SHALLEReD ~ VS INDIANA 5 MICHIGAN POWER CO ~

0 gINTERNAL:

1 REG I

09 ISE'4 TA/EDO 16 EEB 18 PLANT SYS BR 20 AO ~LANT SYS 22 REAC SAFT BR 24 KREGER 26 AD/SITE ANAL 28 ACDENT ANLYS E

JORDAN/ IE EXTERNAL: 03 LPDR 29 ACRS 1

2 1

1 1

1 I

1 1

1 1

1 16 02 NRC'DR 11 MPA 15 NOVAK/KNIEL 17 AD FOR ENGR 19 ISC SYS BR 21 AD SYS/PROJ 23 ENGR BR 25 PWR SYS BR 27 OPERA L IC BR 29 AUX SYS BR 04 NSIC 0')AR 5 >97S

~ TOTAL NUMBER OF COPIES REQUIRED e LTTR 46 ENCL K

0

~'o

'rhsn yg)~

IllfDIAIVA & NICHIGAIIIPO tlYEB CONPAIIIY DONALD C. COOK NUCLZAR PLANT P.O. Box 458, Bridgman, Michigan 49106 February 27, 1979 Mr; J.G'; Keppler; Regional Director" Office of Inspection and Enforcement United States Nuclear. Regul.atory Commission Region III 799 Roosevelt Road Glen El lyn, IL 60137

Dear Mr. Keppler:

Operating License DPR-58 Docket No. 50-315 This is to confirm our verbal report to NRC Region III Inspector, Mr. K.R. Baker, at 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> on February 26, 1979.

At that time we reported that the Unit 1

CD Diesel was inoperable and the 1 AB Diesel was started to meet a surveillance requirement.

The 1

AB Diesel field was not established causing 1 AB Diesel to be declared inoperable for seven (7) minutes.

(Technical Specification 3.8. 1. 1)

A followup report will be submitted by March 10,

1979, as required by Technical Specification Section 6.9. 1.8.

Sincerely, D.V. Shaller Plant Manager

/bab cc:

J.E.

Dolan R.W. Jurgensen R.F.

Kroeger R.

Ki 1 burn R.J. Vollen BPI K.R. Baker RO:III R.C. Callen MPSC P.W. Steketee, Esq G. Charnoff, Esq.

R. Walsh, Esq.

G. Olson 790302035't J.M. Hennigan PNSRC J.F. Stietzel

-Di r IE-(40-copies)

Dir., MIPC (4 copies)

~Et'ULATpnvOpcKET,o>

'C ~

-r

po~Z ~

I REGULATOF.

j:NFORMATION DISTRIBUTION STEM DOCKET NBR: 050-315 Cook 1

RECIPIENT:

Benton, H.R.

ORIGINATOR: Tillin hast J.

DOC DATE:

ACCESSION NBR:

COPIES RECEIVED:

COMPANY:

IN S MI Pwr LTR

'1 ENCL

SUBJECT:

SIZE:

1+132 Forwards 2 copies of Startup Test Rept for C cle 3 of sub facil 0 I STRI BUT ION CODE t AO27 DISTRIBUTION TITLEt REACTOR STARTUP TEST RPT NOTARIZED NAHE BR NRC POR I

R E

,'IPC HANAUER PLANT SYSTEMS BR EEB REACTnp SAFETY BR CORE PERFORHANCE BR LPDR TERA NSIC I ACRS it/2 ENCL W/F.NC L 8/ENCL i'/2 ENCL v/ENCL W/ENCL i'/ENCL

~/ENCL

>/z, ENCL H/ENCL 4/ENCL

~/ENCL W/ENCL N/ENCL FOR ACTION e

ORBg.l BC TOTAL NUHBE 8 OF COPIES REQUIRED t LTR ENCL t7 17 ltd' f978 NOTES-Repro ltrs I

6 E '3 cys all material.