Text
RECIP ~ NAME
, RECIPIENT AFFILIATION KEPPLER J ~ G ~
REGION 3
CHICAGO OFFICE OF THE DIRECTOR
SUBJECT:
ON 790226 UNIT 1
CD DIESEL WAS INOPERABLE 5
1 AB DIESEL, STARTED ~ FIELD NOT ESTABLISHED FOR 1
AB DIESEL'AUSING LATTER TO BE DECLARED INOPERABLE FOR SEVEN MINUTEST DISTRIBUTION CODE:
A002S COPIES RECEIVED:LTR Q ENCL ~
SIZE:
TITLE: INCIDENT REPORTS 3 <<~s
~lL ws~L 4
RECIPIENT COPIES RECIPIENT ID CODE/NAMP LTTR ENCL ID CODE/NAME 05 BC ORB+i COPIES LTTR ENCL ACTION:
REGULATOR INFORMATION DISTRIBUTION'TEM (RIDS) e,,,
DOCKET 0
FACIL:50" 315 DONALD C ~
COOK NUCLEAR POWER PLANTi UNIT 1i INDIANA 5 05000315 AUTH BYNAME AUTHOR AFFILIATION SHALLEReD ~ VS INDIANA 5 MICHIGAN POWER CO ~
0 gINTERNAL:
1 REG I
09 ISE'4 TA/EDO 16 EEB 18 PLANT SYS BR 20 AO ~LANT SYS 22 REAC SAFT BR 24 KREGER 26 AD/SITE ANAL 28 ACDENT ANLYS E
JORDAN/ IE EXTERNAL: 03 LPDR 29 ACRS 1
2 1
1 1
1 I
1 1
1 1
1 16 02 NRC'DR 11 MPA 15 NOVAK/KNIEL 17 AD FOR ENGR 19 ISC SYS BR 21 AD SYS/PROJ 23 ENGR BR 25 PWR SYS BR 27 OPERA L IC BR 29 AUX SYS BR 04 NSIC 0')AR 5 >97S
~ TOTAL NUMBER OF COPIES REQUIRED e LTTR 46 ENCL K
0
~'o
'rhsn yg)~
IllfDIAIVA & NICHIGAIIIPO tlYEB CONPAIIIY DONALD C. COOK NUCLZAR PLANT P.O. Box 458, Bridgman, Michigan 49106 February 27, 1979 Mr; J.G'; Keppler; Regional Director" Office of Inspection and Enforcement United States Nuclear. Regul.atory Commission Region III 799 Roosevelt Road Glen El lyn, IL 60137
Dear Mr. Keppler:
Operating License DPR-58 Docket No. 50-315 This is to confirm our verbal report to NRC Region III Inspector, Mr. K.R. Baker, at 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> on February 26, 1979.
At that time we reported that the Unit 1
CD Diesel was inoperable and the 1 AB Diesel was started to meet a surveillance requirement.
The 1
AB Diesel field was not established causing 1 AB Diesel to be declared inoperable for seven (7) minutes.
(Technical Specification 3.8. 1. 1)
A followup report will be submitted by March 10,
- 1979, as required by Technical Specification Section 6.9. 1.8.
Sincerely, D.V. Shaller Plant Manager
/bab cc:
J.E.
Dolan R.W. Jurgensen R.F.
Kroeger R.
Ki 1 burn R.J. Vollen BPI K.R. Baker RO:III R.C. Callen MPSC P.W. Steketee, Esq G. Charnoff, Esq.
R. Walsh, Esq.
G. Olson 790302035't J.M. Hennigan PNSRC J.F. Stietzel
-Di r IE-(40-copies)
Dir., MIPC (4 copies)
~Et'ULATpnvOpcKET,o>
'C ~
-r
po~Z ~
I REGULATOF.
j:NFORMATION DISTRIBUTION STEM DOCKET NBR: 050-315 Cook 1
RECIPIENT:
- Benton, H.R.
ORIGINATOR: Tillin hast J.
DOC DATE:
ACCESSION NBR:
COPIES RECEIVED:
COMPANY:
IN S MI Pwr LTR
'1 ENCL
SUBJECT:
SIZE:
1+132 Forwards 2 copies of Startup Test Rept for C cle 3 of sub facil 0 I STRI BUT ION CODE t AO27 DISTRIBUTION TITLEt REACTOR STARTUP TEST RPT NOTARIZED NAHE BR NRC POR I
R E
,'IPC HANAUER PLANT SYSTEMS BR EEB REACTnp SAFETY BR CORE PERFORHANCE BR LPDR TERA NSIC I ACRS it/2 ENCL W/F.NC L 8/ENCL i'/2 ENCL v/ENCL W/ENCL i'/ENCL
~/ENCL
>/z, ENCL H/ENCL 4/ENCL
~/ENCL W/ENCL N/ENCL FOR ACTION e
ORBg.l BC TOTAL NUHBE 8 OF COPIES REQUIRED t LTR ENCL t7 17 ltd' f978 NOTES-Repro ltrs I
6 E '3 cys all material.