Confirms 790101 Verbal Rept Re Wrong Setpoint on Turbine Low Fluid Oil Pressure Switches (LPS-090,091,092) from Jan 1978 to Aug 1978.Followup Rept Will Be Submitted to NRC by 790213
ML17317A917
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/01/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 7902080165
Download: ML17317A917 (4)


Text

ACCESS I.ON NBBs FAC ILt50-3.1 6 AUTH.NAME SHALLER,D.V.

RECI,P.NAME KEPPLEReJ.G

~

REGULATO Y INFORMATION DISTRIBUTION SYSTEM (RIDS) 7902080165 DOC. DATE! 79/02/0.1 NOTA IZED'()

DOCKET 8 Donald C.

Cook Nuclear Power Plant, Un.it 2,.Indiana 8,

05000316 AUTHOR AFFILIATION Indi.ana

8. Michigan Power Co.

RECIPIENT AFFILIATION Region 3,.Chicago, Office of the Director RECIPIENT ID 'CODE/NAME 05 BC CRg~/

ACTI.ON-SUBJECTS Confirms 790101 verbal rept "re wrong setpoint.on.turbine low fluid oi.l pressure:swi.,tches (LPS-090,091,092) from Jan 1978 to Aug 1978.Followup,rept will be submitted to NRC by 790213.

DISTBIBUTION CODE~

AO02S

. COPIES BECEIVEDiLTBI ENCL CI SIZE'ITLEi I NCI DENT REPORTS NOTES.: X

~

3'+S ~/

4R c227 COPIES RECIPIENT COPIES

.[.TTR ENCL ID CODE/NAME LTTR ENCL "4

INTERN 0

. 8E 14 TA/EDO 16 EEB 18 PLANT SYS BR 20 AD PLANT S YS 22 BEAC SAFT BR 24 KBEGER 26 AD/SITE ANAL 28.ACDENT ANLYS

.02 NRC PDR 11 MPA 15 NOVAK/KNIEL 17 AD FOR ENGR 19 I8C SYS BR 21 AD SYS/PROJ 23 ENGR BR 25 PAR SYS BB 27 OPERA LIC BR E JORDAN/IE

.1 3

.1 1

1

.1

.1 1

1 I

EXTERNALS 03 LPDR 29 ACBS sl

,16 1

04 NSIC TOTAL NUMBER OF COPI ES REQUI RED>

LTTR 45 FNCL

r A

A

~

~

a N

'0 0

0

~@loan yg)~

INDIANA& MICHIGAN PO PER CDMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 February 1,

1979 Nr. J.G.

Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Nr. Keppler:

Operating License DPR-74 Docket No. 50-316 This is to confirm our verbal report to NRC Region III Inspector, Nr. K.R. Baker, at 1110 hours0.0128 days <br />0.308 hours <br />0.00184 weeks <br />4.22355e-4 months <br /> on February 1, 1979.

At that time we reported that Unit 2 Turbine Low Fluid Oil Pressure Switches (LPS-090,

091, 092) were set at the wrong setpoint from January 1978 to August 2, 1978.

(Technical Specification Table 2.2-1 Item 17)

A followup report will be submitted by February 13, 1979, as required by Technical Specification Section 6.9. 1.8.

Sincerely, D.V. Shaller Plant Hanager

/bab cc:

J.E, Dolan R.W. Jurgensen R.F.

Kroeger R. Kilburn R.J. Vollen BPI".R.

Baker RO:III R.C. Callen NPSC P..W. Steketee, Esq.

G. Charnoff, Esq.

R. Walsh, Esq.

G. Olson J.H.

Hennigan PNSRC J~. Stietzel

~Cir.,

IE (40 copies)

Dir., t1IPC (4 copies) 5 1979 79d Aafa/46

~0~

f li

'k