ML17317A917
| ML17317A917 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 02/01/1979 |
| From: | Shaller D INDIANA MICHIGAN POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 7902080165 | |
| Download: ML17317A917 (4) | |
Text
ACCESS I.ON NBBs FAC ILt50-3.1 6 AUTH.NAME SHALLER,D.V.
RECI,P.NAME KEPPLEReJ.G
~
REGULATO Y INFORMATION DISTRIBUTION SYSTEM (RIDS) 7902080165 DOC. DATE! 79/02/0.1 NOTA IZED'()
DOCKET 8 Donald C.
Cook Nuclear Power Plant, Un.it 2,.Indiana 8,
05000316 AUTHOR AFFILIATION Indi.ana
- 8. Michigan Power Co.
RECIPIENT AFFILIATION Region 3,.Chicago, Office of the Director RECIPIENT ID 'CODE/NAME 05 BC CRg~/
ACTI.ON-SUBJECTS Confirms 790101 verbal rept "re wrong setpoint.on.turbine low fluid oi.l pressure:swi.,tches (LPS-090,091,092) from Jan 1978 to Aug 1978.Followup,rept will be submitted to NRC by 790213.
DISTBIBUTION CODE~
AO02S
. COPIES BECEIVEDiLTBI ENCL CI SIZE'ITLEi I NCI DENT REPORTS NOTES.: X
~
3'+S ~/
4R c227 COPIES RECIPIENT COPIES
.[.TTR ENCL ID CODE/NAME LTTR ENCL "4
INTERN 0
. 8E 14 TA/EDO 16 EEB 18 PLANT SYS BR 20 AD PLANT S YS 22 BEAC SAFT BR 24 KBEGER 26 AD/SITE ANAL 28.ACDENT ANLYS
.02 NRC PDR 11 MPA 15 NOVAK/KNIEL 17 AD FOR ENGR 19 I8C SYS BR 21 AD SYS/PROJ 23 ENGR BR 25 PAR SYS BB 27 OPERA LIC BR E JORDAN/IE
.1 3
.1 1
1
.1
.1 1
1 I
EXTERNALS 03 LPDR 29 ACBS sl
,16 1
04 NSIC TOTAL NUMBER OF COPI ES REQUI RED>
LTTR 45 FNCL
r A
A
~
~
a N
'0 0
0
~@loan yg)~
INDIANA& MICHIGAN PO PER CDMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 February 1,
1979 Nr. J.G.
- Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Nr. Keppler:
Operating License DPR-74 Docket No. 50-316 This is to confirm our verbal report to NRC Region III Inspector, Nr. K.R. Baker, at 1110 hours0.0128 days <br />0.308 hours <br />0.00184 weeks <br />4.22355e-4 months <br /> on February 1, 1979.
At that time we reported that Unit 2 Turbine Low Fluid Oil Pressure Switches (LPS-090,
- 091, 092) were set at the wrong setpoint from January 1978 to August 2, 1978.
(Technical Specification Table 2.2-1 Item 17)
A followup report will be submitted by February 13, 1979, as required by Technical Specification Section 6.9. 1.8.
Sincerely, D.V. Shaller Plant Hanager
/bab cc:
J.E, Dolan R.W. Jurgensen R.F.
Kroeger R. Kilburn R.J. Vollen BPI".R.
Baker RO:III R.C. Callen NPSC P..W. Steketee, Esq.
G. Charnoff, Esq.
R. Walsh, Esq.
G. Olson J.H.
Hennigan PNSRC J~. Stietzel
~Cir.,
IE (40 copies)
Dir., t1IPC (4 copies) 5 1979 79d Aafa/46
~0~
f li
'k