Summary of October 19, 2017, Closed Meeting with Pacific Gas and Electric Company the Proposed Change to the Security Classification of the Intake Structure for Diablo Canyon Power Plant (CAC No. MG0255; EPID L-2017-LRM-0019)
ML17310A130
Person / Time
Site: Diablo Canyon  
(DPR-080, DPR-082)
Issue date: 11/30/2017
From: Balwant Singal
Plant Licensing Branch IV
To:
Singal B, 301-415-3016
References
CAC MG0255, EPID L-2017-LRM-0019
Download: ML17310A130 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 30, 2017 LICENSEE:

Pacific Gas and Electric Company FACILITY:

Diablo Canyon Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF OCTOBER 19, 2017, CLOSED MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY REGARDING THE PROPOSED CHANGE TO THE SECURITY CLASSIFICATION OF THE INTAKE STRUCTURE FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 (CAC NO. MG0255; EPID L-2017-LRM-0019)

On October 19, 2017, a closed meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Pacific Gas and Electric Company (PG&E, the licensee). The purpose of the meeting was to discuss the proposed change to the security classification of the intake structure for Diablo Canyon Power Plant, Units 1 and 2. The revised protective strategy will be evaluated under Title 10 of the Code of Federal Regulations (10 CFR)

Sections 50.59, 50.54(p), 50.54(q), and 50.90. The meeting notice and agenda are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17283A089. Enclosed is a list of attendees.

The licensee provided a brief description of the following:

An overview and description of the existing protected areas of the plant and the proposed change. The licensee also described the impact of the change on the plant's licensing bases, security plans, and emergency plan and the process being used in support of development and evaluation of regulatory changes.

The licensee described the current state of the intake structure, the key technical basis in support of the proposed change, defensive strategy impacts, compensatory measures to be incorporated after the change, and the process to be followed while evaluating the change.

The licensee indicated that the proposed change will be evaluated against the emergency plan for resulting changes to emergency action levels, environmental sampling, and protection of onsite staff.

The licensee indicated that PG&E plans to implement the revised intake area classifications sometime in 2018 if NRC staff approval is not required, or in 2019 if a license amendment request is required in support of the change.

The licensee's presentation slides are in ADAMS at Accession No. ML17319A072 (not publicly available, security-related information).

The NRG staff suggested that the licensee address the following technical issues while performing the evaluation of the proposed change:

1. Describe the reason for PG&E's decision to implement the proposed change, including benefits to be gained and the areas of concern to be addressed.
2. Provide a brief description of the plant changes, including plant modifications, since the original intake structure security classification was established in support of the proposed change.
3. The licensee to consider NUREG/CR-7145, "Nuclear Power Plant Security Assessment Guide," issued April 2013 (ADAMS Accession No. ML13122A181), while evaluating the change.
4. The compensatory measures resulting from the change be described in the security plan.
5. The licensee to ensure that impact of the proposed change and resulting actions on the safety of the plant is also addressed while evaluating the impact on the security plan.
6. Evaluation of the proposed change to be an integrated approach and all stakeholders like operations, maintenance, security organization should be part of the evaluation team.

No Public Meeting Feedback forms were received.

Please direct any inquiries to me at 301-415-3016 or via e-mail at Balwant.Singal@nrc.gov.

Docket No. 50-482

Enclosure:

List of Attendees cc: Listserv

. ) r-) a___ O ---\\ t S-)

~v~

-\\c:__ *...__

~

'-- a Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

LIST OF ATTENDEES OCTOBER 19, 2017, CLOSED MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY TO DISCUSS PROPOSED CHANGES TO THE SECURITY CLASSIFICATION OF THE INTAKE STRUCTURE FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 U.S. Nuclear Regulatory Commission Alison Rivera, Office of Nuclear Security and Incident Response (NSIR)

Doug Hyuck, NSIR Judy Petrucelli, NSIR John Frost, NSIR Everett Byre, NSIR Pete Prescott, NSIR Mario Fernandez, NSIR Latosha Greene, NSIR (Rotation)

Jim Larsen, Region IV Balwant K. Singal, Office of Nuclear Reactor Regulation (NRR)

Licensee Attendees Bob Zimkowski, Pacific Gas and Electric Company (PG&E)

Hossein Hamzehee, PG&E Jan Nimick, PG&E Jordan Tyman, PG&E Mark Mayer, PG&E

SUBJECT:

SUMMARY

OF OCTOBER 19, 2017, CLOSED MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY REGARDING THE PROPOSED CHANGE TO THE SECURITY CLASSIFICATION OF THE INTAKE STRUCTURE FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 (CAC NO. MG0255; EPID L-2017-LRM-0019) DATED NOVEMBER 30, 2017 DISTRIBUTION:

PUBLIC LPL4 R/F RidsACRS_MailCTR Resource RidsNrrDorl Resource RidsNrrDorlLpl4 Resource RidsNrrLAPBlechman Resource RidsNrrPMDiabloCanyon Resource RidsRgn4MailCenter Resource ARivera, NSIR EByre, NSIR JLarsen, RIV PPrescott, NSIR DHuyc'k, NSIR MFernandez, NSIR LGreene, NSIR JPetrucelli, NSIR JFrost, NSIR TWertz, NRR JBowen, EDO RIV ADAMS A ccess1on N os.: M eetinq N f ML17283A089 S 01ce ummary: ML17310A130 via e-ma1 OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NSIR/DSO/SOSB/BC*

NAME BSingal PBlechman DHuyck DATE 11/20/2017 11/06/2017 11/16/2017 OFFICE NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME RPascarelli BSingal DATE 11/29/2017 11/30/2017 OFFICIAL RECORD COPY