Responds to Unresolved Items in Insp Rept 50-244/94-17. Corrective Actions:Util Raised Sensitivity of QA Personnel to Matl Protection Concerns by Holding Training on ANSI N45.2.2-1972 Requirements
ML17309A561
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/15/1994
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 9411220310
Download: ML17309A561 (3)


Text

PR.IC)R.I TY I (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ESSION NBR:9411220310 DOC.DATE: 94/11/15 NOTARIZED: NO DOCKET g

FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R;C'.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

-JOHNSON,A.R.

Project Directorate I-3 P

SUBJECT:

Responds to unresolved items in insp rept 50-244/94-17.

Corrective actions:util raised sensitivity of QA personnel to matl protection concerns by holding training on ANSI N45.2.2-1972 requirements.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR

(

ENCL D

SIZE:

2-TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

R 05000244 RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/DEIB AEOD/S PD/RRAB DEDRO NRR/DORS/OEAB NRR/PMAS/IRCB-E OE DIR RGN1 FILE 01 EXTERNAL LITCO BRYCE IJ H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME JOHNSON,A AEOD/SPD/RAB

~CD~C~

NRR/DRCH/HHFB NUDOCS-ABSTRACT OGC/HDS3 NOAC COPIES LTTR ENCL D

U iNOTE TOALL RIDS RECIPIEYTS:

PLEASE HELP US TO REDUCE KVASTE!CONTACTTHE DOCU.'iIEYTCONTROL DESK, ROOIiI PI-37 (EXT. 504-2083 ) TO ELI iIINATE YOI'R NAME F RO~I DISTRI8UTIOYLISTS I'OR DOCL'IiIEi'I'SYOU DOi "I'LFE Di TAL NUMBER OF COPIES REQUIRED'TTR 18 ENCL PS

PlfSE IIfnliliT

/g f8(jg(S////ldflÃd 5

ROCHESTER GAS AND ELECTRIC CORPORATION ROBERT C MECREDY Vice P565ident Cinns Nuclear Production 5

. i~A)@+~

89 EAST AVENUE ROCHESTER N V.. 14649 0001 ki4 TELEPHONE AREACODE 756 546 2700 November 15, 1994 U. S. Nuclear Regulatory Commission Document Control Desk Attn:

Allen R. Johnson (Mail Stop 14D1)

PWR Project Directorate I-3 Washington, D.C.

20555406

Subject:

Response

to Unresolved Item 50-244/94-17-03 Quality Assurance Audit Letter from E.M. Kelly (NRC) to R.C. Mecredy (RG&E),

Subject, Ginna Procurement Inspection 94-17, dated July 15, 1994.

Dear Mr. Johnson:

The purpose of this letter is to describe the follow-up actions RGEE has performed subsequent to NRC Inspection 50-244/94-17, Letter from E.M. Kelly (NRC) to R.C. Mecredy (RG&E),'ubject Ginna Procurement Inspection 94-17, dated July 15,

1994, and specifically to unresolved item 94-17-03.

The principal concerns of the unresolved item included identified weaknesses in the depth and effectiveness of our QA audit of the inventory. control and protective area, and also weaknesses in the audit's performance based assessment criteria.

-Upon further review, we determined that our audit guidance for inventory control and protection activities did indeed warrant improvement, and that checklist questions could be developed" in greater detail to allow a more comprehensive performance based approach.

We determined that three key actions were required to enhance the effectiveness of audits in this area.

These are:

1.

Raise the sensitivity of the QA personnel to material protection concerns by holding training on ANSI N45.2.2-1972 requirements.

2.

Improve the scope of the checklist questions in this area to assure a more performance based assessment of a range of material types.

3.

Improve the depth of the checklist question to assure that all aspects of control and protection identified in ANSI N45.2.2-1972 are addressed, such as desiccants, material

cleaning, etc.

Page 1 of 2

'941 1220310 941 1 15 PDR ADDCK 05000244 Q

PDR

These areas for improvement have been promptly addressed as follows-.

1.

The Training was completed on August 25, 1994.

2.

The checklist questions were upgraded by October 24, 1994 and were used in a QA Surveillance, SQUA-1994-0027-NAB, of the corrective action for the NRC Violation 94-17-01.

We are confident that the issues identified in the NRC Inspection report have been appropriately addressed, and are prepared to, discuss our follow-up actions with your staff; if desired.

Please do not hesitate to contact us if you have any further questions or concerns.

Ver ruly yo s,

Robert C.

M cre xc:

U.

S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C.

20555 Ginna NRC Senior Resident Inspector Page 2 of 2