Text
SEP-88-l 994 89: 45 FROI'I RCiEE EI IG I I IEER I I ICi Post-it
. Nolo 7671 l~ le CoJnoph Phono 4 ROCHEST'ER GAS AIVDEl 49 CAST TO Ontoj/ g~
From Co.
Phono 0 yg ~ ~7 Fox rr 938>58~2259 P.88i N. Y.
14649-0001 vcnr.'2 ':o 546 27oo GXNNA STATXON July 7, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for June, l994 Operating Status Xnformation R.
E. Ginna Nuclear Power Plant Docket No.
50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of June, 1994.
Very truly yours, Plant Manager JAW:tjn Attachments c:
Mr. Thomas T. Martin NRC
{1) 9407ll0290 '940630 I;,1 PDR IIIIDQCK 05000244 R
SEP-08-1994 89: 45 FROI)
RGB,E El IG IIIEER ING 49 EAST TO OPERATlNG DATA REPORT DOCKET NO.EO 244 DATE: July 7. 1554 COMPLETED 8Y:
Ronald O. Ploof TELEPHON l315) 524-4446 Ext.67 OPERATING S A
- 1. Unit N A.E. GfNNA NUCLEAR POWER PLANT Notaa:
- 2. Reporting Period Juno. 1994 3.
IJcensad Thermal Power (MWtl:
1520 4.
Nameplato Rating (Gross MWa):
490 5.
Oasign Bactric Bating (Net MWe):
470 6.
Maximum Oapandab(e Capacity (Gro 490 7.
Maximum Oopondabla Capacity (Net 470 0.
If Changes Occur in Capacity Rating ()toms Number 3 Through 7) Since Lost Report. Give Reason:
9.
Power Lovel to Wlgch Restricted, Il Any (Nat MWc):
- 10. Aeason For Aastrlctlons, If Any:
This Month iy Yr:to.Oata Cumulative '
- f. Hours in Reportod Ponod
- 12. Number of hours Reactor Wos Critical 13.
Aaactor Reserve Shutdown Hours 14.
Hours Generator On.line
- 15. Unit Reserve Shutdown Hours 16.
Gross Thermal Energy Generated (MWH) 17.
Gross FJoctricsl Energy Generated (MWH) 18.
Nat Flactrical Energy Generatod (MWH) 19.
Unit Scrvico Factor (%)
20.
Unit Availability Factor (%)
- 21. Unit Capacity Factor (using MOC Nat) (%)
- 22. Unit Capacity Factor (using OER Natl (%)
23 Unit Forced Outage Bate ()(')
720.0 601.0 0.0 657 r O.O 960449 324886 300040 91.3 91.3 91.3 91.3 4343.0 3'I 71.1 0.0 3107. 9 0.0 4466760 1516191 1439967 71.6 71.6 70.5 70.5 3.3 21559).0 171697.6 1608.0
'60059.9 0.5
'39422701 79199550 75175340 70.3 78.3 75.3 56 24.
Shutdown Scheduled Over Next 6 Months (Type. Date and Ouration of Each):
- 25. If Shutdown At End of Aapoit Panod. Estimate Oate of Startup:
26, Units in Test Status (Prior to Commercial Operation)."
Forcast Acliiavcd INITIALCRIT(CALITY INITIALELECTAICITY COMMEACIALOPEflATION
'UMULATIVETOTALCOMMENCING JANUARY 1. 1975 CUMULATIVETOTALCOMMENCING NOVEM0EA 0. 1969
SEP-88-1994 89: 46 FR0t'I RCi8,E 9 /Ci I I IEER I I IG 49 EAST TO 93eisl4Z2S9 P.ee AVERAGE DAXI,Y UNXT POWER LEVEL MONTH t'une 1994 DOCKET NO: 50-244 UNIT: R. B. Ginna i clear Power Plane.
DATE: 3'ul 7
1994 COMPLETED BY:
Ronald Ploof TELEPHONE:
315 524-444 Ext.
673 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 480 17.
480 2.
480 480 3.
480 19.
480 480 20.
480 480 480 480 22.
480 7.
480 8.
480 24.
480 480 480 10.
26.
480 480 480 28.
480 13.
270 29.
-5.9 "3.1 30.
480 479 86 XNSTRUCTXONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
UHIT 5HUTDOWH AHD POWER REDUCTIOH5 REPORT MONTH D()( kl T NO 50 244 lINITNAIII R.E. (sINNA NUCIEp,l ll.a TI ~Jul',
199a
(:Dhll Ll;"I'I:DitY Ronald ploo f aI:Li:PIIONI: 315 524-4446 t.
PER PIANT 6 I 3 I
8 Ql 0rx I-c 0
~
0 o X C0 00 cc 0
c u u
~
o 4'c 0Vl C
0 Ci Licensee Event Report lt Em al 0
VI 0 0 IA 0c xr0 O
Cause g Correctrve Action to prevent Recurrence 94-07 6/13/94 F
62.5 A
94-008 BQ MO Refer to LER C94-008.
m m
lrt m
Pj F:
Forced St Scheduled r1tv alSS at SS Reason:
A.Equipraent Failure (Explain)
B.hta intena nce or Te s t C-Rcfuc(ing D.Regulatory Restriction E-Operator Training tlat License Examination F -hdminis tra tive G-Operational Errot (Explain)
H-Other (Fxplain) 3 htethod:
1.hlanua I 2-hlanval Scram.
3-Automatic Scram.
I.Other (Ex pla in)
Exhibit (i - Instructions (or Preparation o( Data I.ntry Sheets Ior Lic<<nscc l;vent R<<port (Ll(R) I'il<<(NIIRI('
(IIGI )
lixhibit I - hamc Sour<<<<
a5
(-.S Cl I
crt tat t I
~5
SEP-88-1994 89:47 PRO(l RGSE EllGlllEERlllG 49 EAST TO 93815842259 P.885 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Pla DATE: J l 7
l994 COMPLETED BY:
Ronald Ploof TELEPHONE:
3iS 524-4446 Ext.
673 MONTH June 1994 During the month of June the average power was 97-..
On June 13, the unit was taken off-line in accordance with Technical'pecification 3.3 due to an inoperable Safety Injection Pump Motor.
The unit was placed back on-line on June I6.
TOTAL P.885