SEP-88-l 994 89: 45 FROI'I RCiEE EI IG I I IEER I I ICi 49 CAST TO 938>58~2259 P.88i Post-it Nolo 7671 Onto j/ g~

l~ le From Co Jnoph Co.

Phono 4 Phono 0 Fox rr yg ~ ~7 ROCHEST'ER GAS AIVDEl N. Y. 14649-0001 vcnr.'2 ':o 546 27oo GXNNA STATXON July 7, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for June, l994 Operating Status Xnformation R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of June, 1994.

Very truly yours, Plant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC {1) 9407ll0290 '940630 I;,1 PDR IIIIDQCK 05000244 R PDR

SEP-08-1994 89: 45 FROI) RGB,E El IG II IEER ING 49 EAST TO OPERATlNG DATA REPORT DOCKET NO.EO 244 DATE: July 7. 1554 COMPLETED 8Y:

Ronald O. Ploof TELEPHON l315) 524-4446 Ext.67 OPERATING S A

1. Unit N A.E. GfNNA NUCLEAR POWER PLANT Notaa:
2. Reporting Period Juno. 1994
3. IJcensad Thermal Power (MWtl: 1520
4. Nameplato Rating (Gross MWa): 490
5. Oasign Bactric Bating (Net MWe): 470
6. Maximum Oapandab(e Capacity (Gro 490
7. Maximum Oopondabla Capacity (Net 470
0. If Changes Occur in Capacity Rating ()toms Number 3 Through 7) Since Lost Report. Give Reason:
9. Power Lovel to Wlgch Restricted, Il Any (Nat MWc):
10. Aeason For Aastrlctlons, If Any:

This Month iy Yr:to.Oata Cumulative '

f. Hours in Reportod Ponod 720.0 4343.0 21559).0
12. Number of hours Reactor Wos Critical 601.0 3'I 71.1 171697.6
13. Aaactor Reserve Shutdown Hours 0.0 0.0 1608.0
14. Hours Generator On. line 657 r 3107. 9 '60059.9
15. Unit Reserve Shutdown Hours O.O 0.0 0.5
16. Gross Thermal Energy Generated (MWH) 960449 4466760 '39422701
17. Gross FJoctricsl Energy Generated (MWH) 324886 1516191 79199550
18. Nat Flactrical Energy Generatod (MWH) 300040 1439967 75175340
19. Unit Scrvico Factor (%) 91.3 71.6 70.3
20. Unit Availability Factor (%) 91.3 71.6 78.3
21. Unit Capacity Factor (using MOC Nat) (%) 91.3 70.5 75.3
22. Unit Capacity Factor (using OER Natl (%) 91.3 70.5 23 Unit Forced Outage Bate ()(') 3.3 56
24. Shutdown Scheduled Over Next 6 Months (Type. Date and Ouration of Each):
25. If Shutdown At End of Aapoit Panod. Estimate Oate of Startup:

26, Units in Test Status (Prior to Commercial Operation)." Forcast Acliiavcd INITIALCRIT(CALITY INITIALELECTAICITY COMMEACIALOPEflATION

'UMULATIVETOTAL COMMENCING JANUARY 1. 1975 CUMULATIVETOTAL COMMENCING NOVEM0EA 0. 1969

SEP-88-1994 89: 46 FR0t'I RCi8,E 9 /Ci I I IEER I I IG 49 EAST TO 93eisl4Z2S9 P.ee AVERAGE DAXI,Y UNXT POWER LEVEL DOCKET NO: 50-244 UNIT: R. B. Ginna i clear Power Plane.

DATE: 3'ul 7 1994 COMPLETED BY:

Ronald Ploof TELEPHONE: 315 524-444 Ext. 673 MONTH t'une 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 480 17. 480

2. 480 480
3. 480 19. 480 480 20. 480 480 480 480 22. 480
7. 480
8. 480 24. 480 480 480
10. 26. 480 480 480
28. 480
13. 270 29.

-5.9 30. 480 "3.1 479 86 XNSTRUCTXONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

D()( kl T NO 50 244 lINITNAIII R.E. (sINNA NUCIEp,l PER PIANT ll.a TI ~Jul 199a UHIT 5HUTDOWH AHD POWER REDUCTIOH5

(:Dhll Ll;"I'I:D itY Ronald pl oo f I

REPORT MONTH aI:Li:PIIONI: 315 524-4446 t . 6 I3 8 Ql 0

c c u Licensee 0 IA Cause g Correctrve C

u Em c 0 0 ~ al 0 Action to rx 0 o 4'c Event VI 0 xr

~ 0 0 0 0 I- o X 0 0Vl C Report lt prevent Recurrence cc O

0 Ci 94-07 6/13/94 F 62.5 A 94-008 BQ MO Refer to LER C94-008. m m

lrt m

Pj a5

(-.S Cl I

3 crt F: Forced Reason: htethod: Exhibit (i - Instructions tat St Scheduled A.Equipraent Failure (Explain) 1 .hlanua I (or Preparation o( Data t I B.hta in tena nce or Te s t 2-hlanval Scram. I.ntry Sheets Ior Lic<<nscc ~

5 C-Rcfuc(ing 3-Automatic Scram. l;vent R<<port (Ll(R) I'il<<(NIIRI ('

D.Regulatory Restriction I .Other (Ex pla in) (II GI )

E-Operator Training tlat License Examination F -hdminis tra t ive G-Operational Errot (Explain)

H-Other (Fxplain) lixhibit I - hamc Sour<<<<

r1tv alSS at SS

SEP-88-1994 89:47 PRO(l RGSE EllGlllEERlllG 49 EAST TO 93815842259 P.885 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Pla COMPLETED BY:

DATE: J l 7 l994 Ronald Ploof TELEPHONE: 3iS 524-4446 Ext. 673 MONTH June 1994 During the month of June the average power was 97-.. On June 13, the unit was taken off-line in accordance with 3.3 due to an inoperable Safety Injection Pump Technical'pecification Motor. The unit was placed back on-line on June I6.

TOTAL P.885