Monthly Operating Rept for Nov 1992 for Re Ginna Nuclear Power Plant.W/921210 Ltr
ML17309A503
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/30/1992
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9212150032
Download: ML17309A503 (7)


Text

'Ci

~l stsilllll"'ite)~tz" ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N.Y. 14649.0001 ROBERTC MECREDY TELEPHONE Vice President AREA CODE 71B 546 2700 Cinna Nuclear Producrion GZNNA STATION December 10, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for November, 1992 Operating Status Xnformation R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1992.

Very truly yours, Robert C. Mecred RCM/

Attachments cc:, Mr. Thomas T. Martin NRC (1)

ap OPERATING DATA REPORT DOCKET NO. 50-244 DATE Dec r 10 1992 COHPLETED BY Robert E. Dodge TELEPHONE 315 524.4446 ext. 396 OPERATING STATUS

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes: The unit operated at approx.
2. Reporting Period: November 1992 97/. reactor power level for
3. Licensed Thermal Power (MWt): 1520 the report period except for 4~ Nameplate Rating (Gross HWe): 490 events outlined on page 4.
5. Design Electrical Rating (Net HWe): 470
6. Haximm Dependable Capacity (Gross HWe): 490
7. Maxinun Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Hcnth Yr.-to-Date Cmulat 1 ve

11. Hours In Report Period 720 8 040 202 146.45
12. Nunber of Hours Reactor Was Critical 720 6 889.71 160 220.67 13 ~ Reactor Reserve Shutdown Hours 1 687.55 14 ~ Hours Generator On-Line 720 6 793.75 157 499.13
15. Unit Reserve Shutdown Hours 8.5
  • 16 ~ Gross Thermal Energy Generated (HWN) 1 045 291 9 723 083 222 937 596
17. Gross Electrical Energy Generated (HWN) 356 190 3 291 724 73 621 331
18. Net Electrical Energy Generated (HWN) 338 563 3 125 312 69 877 859
19. Unit Service Factor 100% 84.50% 78.07/.
20. Unit Availability Factor 100/, 84.50% 78.07%

21 ~ Unit Capacity Factor (Using HDC Net) 100.05/, 82.71% 74.89%

22. Unit Capacity Factor (Using DER Net) 100.05% 82.71% 74.89%

23., Unit Forced Outage Rate 0/ 2.25% 5.89%

24. Shutdowns Scheduled Over Next 6 Honths (Type, Date and Duraticn of Each):

'f Refueli and Haintenance - Harch 19 1993 45 da 25 Shut Down At End Of Report Period, Estimated Date of Startup:

26 'nits In Test Status (Prior to Comnerciai Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

<<CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975

<<*CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969

t AVERAGE DAILY UNIT POWER LEVEL t

DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE December 0 1992 COMPLETED BY o ert E. Dodge TELEPHONE 1 315 524-4446 ext. 396 MONTH November 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

17. 480 2 ~ 480 18. 481 3 ~ 481 19. 481 4 481 20. 481

'80

~

5 ~ 481 21. 481 6 ~ 481 22. 481 7 ~ 421 23 481 482

'4.

8 ~ 481 9 ~ 481 25. 481

10. 481 26 ~ 481 481 27 481
12. 481

'8.

481 13 481 29. 258

'4 481 30. 431

'5.

481 31.

16 481 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

00(:KET NO. SO 244 liNlTNAMl'.R.E- 6INNA NUCLEAtc POWER PLAN'K UNIT SHUTDOWN AND POWER REDUCTIONS

(:OMPLI'.TED BY Robert E l)odge 9>> PfiON'f, Bi>-524-4446 ext. 396 Ginna Station Pl CY cn>>0 0 4 4 0 Licensee Em O IC) 4 0 Cause L Corrective Ho. Date 4 0 0

4 0>>> cc4O Event o 0 VI 4 0 4 0 0 Action to

>T

~

0 0 v) c Report 0 lA 0 E Prevent Recurrence 0

O Cl 92-08 11-29-92 7. 67 A Gasket failure on 2B MSR 2nd pass drain LCV-3334B to feedwater heater 5B,replaced gasket.

1 3 F: Forced Reason: Method: Exhibic G - Instructions S: Scheduled A-Equipment Failure (Explain) 14lanual for Preparation of Data B-Maintenance. or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Aucomacic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction'peracor 4-Other (Explain) O161)

Training 8c License Examinacion F-Administrative

&Operational Error (Explain)

RKV. 445 4949 Hither (Explain) Exhibit I - Same Source

~w H

'I

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Decem r 10 1992 COMPLETED BY Robert E. Dodge TELEPHONE 1 315 524-4446 ext. 396 MONTH November 1992 The reactor power level averaged 974 for the majority of the report, with the following exception:

On November 29, 1992 power level was reduced to 32% to repair a gasket on MSR 2B steam drain line to feedwater heater 5B.