Forwards Westinghouse Rept Entitled, Recommended Info for Inclusion in Section 15.6.4 of FSAR for Re Ginna Nuclear Plant. Rept Summarizes ECCS Evaluation,Including Effects of Upper Plenum Injection,Per NRC 850212 Request
ML17309A500
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/05/1992
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML17262B084 List:
References
NUDOCS 9211180048
Download: ML17309A500 (2)


Text

/// 'SS

/I///

///

//////SS

/

////////

/////////////

ROCHESTER GAS AND ELECTRIC CORPORATION o

ROBERT C MECREOY Vice Prerldent Cinna Nudear Production

/

$1+le 89 EAST AVENUE, ROCHESTER N. Y. 14649-0001 tELEPHONE AitEACODE 71t$ 546.2700 November 5, 1992 U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Allen R. Johnson Project Directorate I-3 Washington, D.C.

20555

Subject:

ECCS Evaluation Including the Effects of Upper Plenum Injection R.E.

Ginna Nuclear Power Plant Docket No. 50-244 Ref. (a):

(b):

NRC letter from J.

A. Zwolinski to R.

W. Kober (RG&E),

Subject:

"Development of an Acceptable ECCS Evaluation Model Which Includes the Effects of"Upper Plenum Injec-tion," dated 2/12/85.

NS-NRC-91-3582, "WCAP-10924-P, Revision 2,

Volume 2;

"Westinghouse Large Break LOCA Best Estimate Methodology:

Application to Two-Loop PWRs Equipped with Upper Plenum Injection,"

Addendum 3,

"Upper Plenum Injection Model Improvement

[Proprietary],

Letter from S., R.

Tritch (Westinghouse) to L. Sapp (NRC),'ated April 19, 1991.

Dear Mr. Johnson:

Reference (a) requested Rochester Gas-and-Electric (RG&E) to submit an ECCS evaluation that included the effects of Upper Plenum Injection (UPI).

The evaluation has been completed using Reference (b) methodology.

The attached report summarizes the evaluation and will be used to update section 15.6.4.2 of the Ginna UFSAR.

It is requested that this evaluation become the analysis of record with the startup of Cycle 23,. currently scheduled for May 3, 1993.

In order to use the methodology of reference (b), exemptions from two specific sections of 10CFR50 Appendix K are necessary because of the hardware configuration of upper plenum injection.

Those exemption requests are being submitted under separate cover.

Ver ruly yours, 13004'P

~

92iii80048 92ii05 PDR ADOCK 05000244 P

PDR gr/4 p//~peP4iug Robert C.

Mec edy

xc:

Mr. Allen R. Zohnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector