Forwards Ginna Nuclear Power Station Inservice Insp Rept for Third Interval (1990 - 1999).
ML17309A463
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/09/1991
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML17262A584 List:
References
NUDOCS 9108150066
Download: ML17309A463 (6)


Text

c v ACCELERATED D TRJBUTION DEMONS TION SYSTEM

'4 ~

1,1 c.

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9108150066 DOC.DATE: 91/08/09 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Uqit 1, ochester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R. Project Directorate I-3

SUBJECT:

Forwards "Ginna Nuclear Power Station Inservice Insp Rept for Third Interval (1990 1999)."

DISTRIBUTION CODE: AO47D TITLE: OR COPIES RECEIVED:LTR l ENCL Submittal: Inservice Inspection/Testing/Relief from ASMEL.SIZE'+Code~+

S NOTES:License Exp date in accordance with 3.0CFR2,2.109(9/19/72) . 05000244

/

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 1 0 PD1-3 PD 1 1 D JOHNSON,A 2 2 INTERNAL: AEOD/DSP/TPAB 1 1 NRR/DET/ECMB 9H 1 1 D

NRR/DET/EMEB 7E 1 1 NUDOCS-ABSTRACT 1 1 OC/2'EM~ 1 0 OGC/HDS 1 1 0 S BG~~ 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: EG&G BROWN,B 1 1 EG&G RANSOME,C 1 1 NRC PDR 1 1 NSIC 1 1 D

S D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH CONTACT THE DOCUMENT CONTROL DESK ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL 13

gi iZZSZSZ ZiZZZ!re 0 ~ War 0 I4 ~

rite zjrjzi ztzzinr zzEIE zurich ROCHESTER GAS AND ELECTRIC CORPORATION 0 eg EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C MECREDY TELEPHONE Yice President ArtEACOOET t 6 546-2700 Cinna Hudeer Production August 9, 1991 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Allen R. Johnson Project Directorate I-3 Washington, D.C. 20555

Subject:

Transmittal of Inservice Inspection Report for the Third Interval (1990-1999)

R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Johnson:

Enclosed is a copy of the 1991 Ginna Station Annual Inservice Inspection Summary Report, required 90 days following startup from the refueling outage. This material. is being submitted as required by the Ginna Quality Assurance Manual.

Very truly yours, Robert C. Mecredy MECi180 Attachment xc: Mr. Allen R. Johnson (Mail Stop 14D1) w/Attachment Project Directorate I-3 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission w/o Attachment Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector w/o Attachment 9i08i50066 9i0809 PDR Q

,ADOCK

~ .','1 'se>,

05000244 k PDR

$ o9/ /Pi

0 I

'I I

~ ."

III ~

\

II ~

~< 'iII

'A u4

ROCHESTER GAS AND ELECTRIC CORPORATION 89 EAST AVENUEI ROCHESTER I NY 1 4 64 9 NUCLEAR REGULATORY COMMISSION INSERVICE INSPECTION REPORT FOR THE THIRD INTERVAL (1990 - 1999)

FIRST PERIODS SECOND OUTAGE 1991 R.ED GINNA NUCLEAR POWER STATION REVISION 0 JULY 19, 1991 a

.9108150066,

1 k ~ ~

lp e