0 LS05-81-03-041 M1arch 17, 1981
/
I blillfhm B. Cottrell, Director National Safety Information Center Oak Ridge National Laborator'y Post Office Box Y Oak Ridge, Tenn.
37830
Dear Sir:
DISTRIBUTION:
~Deckets~>X@50-255 NRC PDRs 50-244, 50-255 LPDRs 50-244, 50-255 TERA (2)
NSIC GLainas NTRussell EMcKenna CBerlinger OELD OI&E (3)
'CRS (16)
SEPB Reading File S$,6 g~;
SUMECT:
REVIEW OF OPERATING EXPERIENCE FOR THE GINNA AND PALISADES PLANTS l<e have reviewed your report on the review of operating experience for the Ginna and Palisades plants as transmitted by your letter of December 31, 1980.
Based on this review, we request that the report be modified to incorporate the comments provided in the enclosure.
Also enclosed is a marked-up copy of the report, showing other changes.
Your response is requested in 30 days upon receipt of this letter.
Sincerely, ea ~<
0655a
Enclosure:
As stated cc w/enclosure:
G. T. Mays, ORNL/NSIC William T. Russell, Chief Systematic Evaluation Program Branch Division of Licensing
"<9>0 69 0FFic~I1't,. $ gPB gP. (PPB(SL
+URNAM<gEI4KZkp'dk CBerlingen DATEP P J(7/81 P / l7/8]
NRC FORM 318 80/80) NRCM 0240 DL.:. EPB/C HTRussell L
0/SA G
irras
+ /QSl a /<V'81
~ ~ ~ ~ i/ ~
(
~i ~ ~ ~ ~ o ~ ~ o OFFICIAL RECORD COPY 4 USGPO: 1980-329.824
I I
4 Ii"
~
P
'i Pl l
F A
II H
n IE
'4e ~
MAR 86 ]gg~
LS05-81-03-041 Miarch 17, 1981 Ittilliam B. Cottrell, Director National Safety Information Center Oak Ridge National Laboratory Post Office Box Y Oak Ridge, Tenn.
37830
Dear Sir:
DISTRIBUTION:
~Deckets ~D~50-255 NRC PDRs 50-244, 50-255 LPDRs 50-244>>
50-255 TERA (2)
NSIC GLainas WTRussell EMcKenna CBerlinger OELD OISE (3)
'CRS (16)
SEPB Reading File
SUBJECT:
REVIEW OF OPERATING EXPERIENCE FOR THE GIiNNA AND PALISADES PLANTS We have reviewed your report on the review of operating experience for the Ginna and Palisades plants as transmitted by your letter of December 31, 1980.
Based on this review, we request that the report be modified to incorporate the corments provided in the enclosure.
Also enclosed is a marked-up copy of the report, showing other changes.
Your response is requested in 30 days upon receipt of thi s letter.
Sincerely,
'.net >4
~ ~Q 5PL>>~~
ot'4'nclosure:
As stated cc w/enclosure:
G. T. Mays, ORNL/NSIC William T. Russell, Chief Systematic Evaluation Program Branch Division of Licensing g ggp, Sio4ox o gp'I5
"'>ig./l7/81
/
~ <C iCigiu o;8
<0 80i VRi M oZ I
-'""--~:DL,:SEPB........,,DL:SEP.B/,SL
': >>~e>>E>>'Eigkkh:dk Cgerlinger I '
7/81
~ / ~>81
+81
~p iMe( i
~w',pp&(
~
~
~ ~ W~
I DL: EPB/C L 8D/SA WTRussell GC 6irras
LS05-81-03-041 Ylarch 17, 1981 Milliam B. Cottrell, Director National Safety Information Center Oak Ridge National Laboratory Post Office Box Y Oak Ridge, Tenn.
37830
Dear Sir:
DISTRIBUTION:
Qeckets gZRP50-255 NRC PDRs 50-244, 50-255 LPDRs 50-244, 50-255 TERA (2)
NSIC GLainas MTRussell EMcKenna CBerlinger OELD OIaE (3)
'CRS (16)
SEPB Reading File
SUBJECT:
REYIEM OF OPERATING EXPERIEHCE FOR THE GIHHA AND PALISADES PLANTS Me have reviewed your report on the review of operating experience for the Ginna and Palisades plants as transmitted by your letter of December 31, 1980.
Based on this review, we request that the report be modified to incorporate the coments provided in the enclosure.
Also enclosed is a marked-up copy of the report, showing other changes.
Your response is requested in 30 days upon recei pt of thi s 1 et ter.
Sincerely, Q S4~~~"'d%
06j<o Milliam T. Russell, Chief Systematic Evaluation Program Branch Division of Licensing
Enclosure:
As stated cc w/enclosure:
G. T. Hays, ORNL/NSIC P
='*E==)DL:SEPB...
.; DL 'SEP8/SL, DL:SEPB/C
'L )D/SA I >>R>>~-JEPiK/p4:dk I CBerlinger MTRussel 1
IGC hirras
'"-~'P./l,//Bl, 'S,/ l>/8l... ;"" / 8/Bl q /P/Bl
~-04o+
o 943' I
~
LS05-81-03-041 March 17, 1981
'rfilliam B. Cottrell, Director National Safety I nformation Center Oak Ridge National Laboratory Post Office Box Y Oak Ridge, Tenn.
37830
Dear Sir:
DISTRIBUTION:
~eckets Q~D~50-255 NRC PDRs 50-244, 50-255 LPDRs 50-244, 50-255 TERA (2)
NSIC GLainas WTRussell EMcKenna CBerlinger OELD OISE (3)
ACRS (16)
SEPB Reading File
SUBJECT:
REVIEN OF OPERATING EXPERIENCE FOR THE GINNA AND PALISADES PLANTS
!Ae have reviewed your report on the review of operating experience for the Ginna and Palisades plants as transmitted by your letter of December 31, 1980.
Based on this review, we request that the report be modified to incorporate the coaments provided in the enclosure.
Also enclosed is a marked-up copy of the report, showing other changes.
Your response is requested in 30 days upon receipt of this letter.
S incerely, y se<~~
QAQ
Enclosure:
As stated cc w/enclosure:
G. T. Mays, ORNL/NSIC William T. Russell, Chief Systematic Evaluation Program Branch Division of Licensing
- zPfpjp, s
~~ e
$40
/i ling
->gL:SEPB
, DL,'SEPB/SL OL:SEPB/C
='
D/SA n
.~ "'
" '." ""~'
0
<>><>"<>,EPtCKdnM: dk 'Ber 1 inger
>iTRussel 1
GC inas
-~ ~ /)//81
'< / ~>/81
/ i~/81 q /(+81
-~>64oz o gpss
LS05-81-03-041 March 17, 1981 William B. Cottrell, Director National Safety Information Center Oak Ridge National Laboratory Post Office Box Y Oak Ridge, Tenn.
37830
Dear Sir:
DISTRIBUTION:
Qeckets ~RKP50-255 NRC PDRs 50-244, 50-255 LPDRs 50-244, 50-255 TERA (2)
NSIC GLainas WTRussell EMcKenna CBerlinger OELD OI5E (3)
ACRS (16)
SEPB Reading File
SUBJECT:
REVIEW OF OPERATING EXPERIENCE FOR THE GINNA AND PALISADES PLANTS We have reviewed your report on the revie~ of operating experience for the Ginna and Palisades plants as transmitted by your letter of December 31, 1980.
Based on this review, we request that the report be modified to incorporate the corments provided in the enclosure.
Also enclosed is a marked-up copy of the report, showing other changes.
Your response is requested in 30 days upon receipt of this letter.
Sincerely, g$ s>Pa~~
QAEB
Enclosure:
As stated cc w/enclosure:
G. T. Hays, ORNL/NSIC William T. Russell, Chief Systematic Evaluation Program Branch Division of Licensing
~~ N p
L )$%6P
-"-'DL:SEPB, DL'SEPB/SL
<<<*<<)Ef@K)n4:dk 'CBerl inger
-'m /l7/81
~ / ~>/81 DL:SEPB/C BL/(D/SA WTRusse1 1
GCI.hines
/
~ /81 5 /A(81
R QQ Wp0rP
%r
- <.,jjI(lw- ~
~gv
<<w*<<+
LS05-01-03-041 UNITED STATES NUCLEAR REGULATORY COMI'/~ISSION WASHINGTON, O. C. 20555 March 17, 1981 William B. Cottrell, Director National Safety InforIIation Center Oak Ridge lIational Laboratory Post Office Box Y Oak Ridge, Tenn.
37830
Dear Sir:
SUBJECT:
REYIEW OF OPERATING EXPERIENCE FOR THE GINNA AND PALISADES PLANTS We have reviewed your report on the review of operating experience for the Ginna and PaIisades plants as transmitted by your letter of December 31, 1980.
Based on this review, we request that the report be modified to incorporate the coII;ents provided in the enclosure.
Also enclosed is a marked-up copy of the report, showing other changes.
Your response is requested in 30 days upon receipt of this letter
~
Sincerely,
Enclosure:
As stated
~$g'd g i> i./~~~M William T. Russell, Chief Systematic Evaluation Program Branch Division of Licensing cc w/enclosure:
G. T. Mays, ORNL/NSIC 51040' qg~
, ~
+
~@ 8g~lO+<&Q ENCLOSURE SEP COMMENTS ON REYIEM OF OPERATINGEXPERIENCE FOR THE GINNA AND PALISADES PLANTS General 1 ~
There are distinct differences between Section 4 (Ginna) and Section 5
(Palisades).
The two sections need to be more consistent in terminology, review objectives and criteria.
2.
The criteria used to identify degradation in plant safety (i.e., significant events as defined in Section 5.5.1) in the Palisades Section are not adequately presented for Ginna.
3.- Terminology:
- Use design basis ev'ents (DBE) rather than DBA, SRP event
- Don't abbreviate
- hours, days in the text.
Section 1
pg.
1 Mhy were comments included on reportable event tables for Ginna, but not for Palisades?
Section 2
pg.
2-1
- Explain "series publications."
Section 4
pg. 4-4
- It appears that shutdowns with no ascertainable causes could be significant.
pg. 4 Section 4.5 - Was there any change in the AEC/NRC reporting requirements for Ginna which would have resulted in the significant increase in reports per year.
pg. 4 Section 4.5.2.1 - Could the number of operator errors reported after 1975 be correlated with any changes in reporting requirements2 pgo 4-32 5 4-50 Lack of effort in investigating - An obvious deficiency here also is attributed to inconsistent NRC requirements
- the problem is not uniquely exclusive.
Either delete comment or expand on known deficiency in area of NRC reporting requirements.
pg. 4 Mhat is the basis for statement "Staggered Tests are not necessary"'?
Section 5
~~
0'%g.
5-1
- The review criteria for this section seem to be different from those stated on pg. 3-1.
Why?
pg.
5-1
- (see also pg. 5-16) 6 5-2 The discussion of core rating and electrical rating is confusing, since pages 5-1 and 5-2 do not mention the subsequent increase in power rating (Pg 5-16) pg.
5-1
-,State the basis for such comparatives as "abnormally high number",
5 5-44 "excessive failures."
Mording changes marked in report (attached) on the following pages:
1-3 1-7 3-1 3-11 4-1 4-8 4-13 4-20 4-23 4-29 4-30 4-32 4-34 4-43 4 44 4-46 4-50 4-51 4-53 5-1 5
5-16 5-17 5-18 5-32 5-40 6-1