ML17308A270

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 860909-1013
ML17308A270
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/19/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To:
Shared Package
ML17308A269 List:
References
50-335-86-21, 50-389-86-20, NUDOCS 8612030151
Download: ML17308A270 (2)


Text

ENCLOSUPE 1

NOTICE OF VIOLATION Florida Power and Light Company St. Lucie Units 1

and 2

Docket Nos.

50-335 and 50-389 License Nos.

DPR-67 and NPF-16 During the Nuclear Regulatory Commission (NRC) inspection conducted on September 9 - October 13,

1986, a violation of NRC requi rements was identified

The violation'nvolved 10 CFR 50.59(b).

In accordance with the "General Statement of Policv and Procedure for NRC Enforcement Actions,"

10 CFR Part 2,

Appendix C

( 1986),

the violation is listed below:

10 CFR 50.59(b),

states in part, the licensee shall furnish to the appropriate NRC Regional 'Office with a copy.to the Director of Inspection and Enforcement, U.

S.

Nuclear Regulatory Commission, annually or at such shorter intervals as may be specified in the, license, a report containing a

brief description of such

changes, tests and experiments, including a

summary of the safety evaluation of each.

Contrary to the

above, the licensee's submittal of changes, tests and experiments failed to include a brief description and su+nary of the safety evaluations on 283 of 287 plant changes/modifications.

This is a Severity Level V violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Florida Power and Light Company is hereby required to submit to this Office within 30 days of the date of the letter transmitting this Notice a written statement or explanation in reply including:

( 1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.

Where good cause is shown, consideration will be given to extending the response time.

FOP.

THE NUCLEAR REGULATORY COMMISSION vi d M. 4errel 1 i, Chi ef eactor Projects Branch 2

Division of Reactor Projects Dated at Atlanta, Georgia this 19 day of November 1986 8612030151 861119 PDR 4DOCK 05000335 G

PDR