ENCLOSUPE 1
NOTICE OF VIOLATION Florida Power and Light Company St. Lucie Units 1
and 2
Docket Nos.
50-335 and 50-389 License Nos.
DPR-67 and NPF-16 During the Nuclear Regulatory Commission (NRC) inspection conducted on September 9 - October 13,
- 1986, a violation of NRC requi rements was identified
The violation'nvolved 10 CFR 50.59(b).
In accordance with the "General Statement of Policv and Procedure for NRC Enforcement Actions,"
Appendix C
( 1986),
the violation is listed below:
states in part, the licensee shall furnish to the appropriate NRC Regional 'Office with a copy.to the Director of Inspection and Enforcement, U.
S.
Nuclear Regulatory Commission, annually or at such shorter intervals as may be specified in the, license, a report containing a
brief description of such
- changes, tests and experiments, including a
summary of the safety evaluation of each.
Contrary to the
- above, the licensee's submittal of changes, tests and experiments failed to include a brief description and su+nary of the safety evaluations on 283 of 287 plant changes/modifications.
This is a Severity Level V violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, Florida Power and Light Company is hereby required to submit to this Office within 30 days of the date of the letter transmitting this Notice a written statement or explanation in reply including:
( 1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.
Where good cause is shown, consideration will be given to extending the response time.
FOP.
THE NUCLEAR REGULATORY COMMISSION vi d M. 4errel 1 i, Chi ef eactor Projects Branch 2
Division of Reactor Projects Dated at Atlanta, Georgia this 19 day of November 1986 8612030151 861119 PDR 4DOCK 05000335 G