|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
MONTHYEARML17222A7821989-04-27027 April 1989 Expresses Concerns for Ecological well-being of Hutchinson Island Due to Increased Nuclear Waste & Potentially Disastrous Emergency Evacuation of Island.Nrc Consideration Directed Toward This Matter Requested ML17222A4331988-06-27027 June 1988 Opposes Util Request That Scheduled Hearing on Proposed Change to More Concentrated Storage Sys for Spent Nuclear Fuels Be Closed to Public & Requests That Hearing Be Open to Public ML20196J8081988-06-27027 June 1988 Opposes Licensee Request That Hearing on Company Proposed Change to More Concentrated Spent Nuclear Fuel Storage Sys Be Closed to Public ML17222A2441988-04-18018 April 1988 Expresses Several Concerns Re Plants.Only Conservative Changes in Procedures of Facilities at Plant That Would Surely Decrease Chances for Need of Evacuation Should Be Considered & Permitted ML20196B3541988-04-0101 April 1988 Requests Inclusion of Subj Ltr as Part of Hearing Proceedings on 880329.Termination Date for long-term Storage of Hazardous Nuclear Wastes on Nuclear Power Plant Sites Requested.Served on 880623 ML20236E0351987-09-30030 September 1987 Requests That Public Hearing Be Held Re Util Request to Double Amount of Radwaste to Be Stored Onsite ML20238B7731987-08-0707 August 1987 FOIA Request for Records Explaining Status of Listed LERs Omitted from List,Previously Received from Nrc,Of LERs Filed by Commercial Nuclear Power Plant Licensees for Operating Year 1986 ML17308A2361987-03-19019 March 1987 Requests NRC Response to Questions Re Emergency Evacuation Problems at Plant Due to Local & State Govt Reluctance to Solve Problems.Newspaper Articles Highlighting Problems Encl ML20211N0341986-12-10010 December 1986 Forwards Request for Hearing to Ensure That NRC Fulfills Responsibility Re Health & Safety of All Citizens When Major Engineering Change Made.Listed Questions Re Transfer of Spent Fuel Rods Posed to Licensee.Related Correspondence ML20214D6291986-11-0606 November 1986 Requests Hearing Re Util Application for Authorization to Move Spent Fuel from Unit 1 to Unit 2.Served on 861121 ML17216A4491986-01-26026 January 1986 Informs That HR Denton 860106 Response to Author 851205 & 09 Ltrs Did Not Adequately Address Concerns on Safety of Facility.Summary Re Extension of 10 Yr Insp Interval Provided ML17216A3931985-12-0909 December 1985 Raises Concerns Re 1985 Decision to Postpone Safety Shutdown of Facility for Refurbishing After 10 Yrs of Operation & NRC Waiver of 1986 Shutdown.News Article Re Concerns Expressed in 851205 Ltr Encl ML17216A3961985-12-0505 December 1985 Raises Concern Re NRC Waiver of Safety Requirement for 10-yr Refurbishing & Partial Repairs at Facility.Findings of Fact, Hearings,Repts & List of Util Granted Safety Waivers Requested ML17215A5111984-06-0202 June 1984 Forwards Palm Beach Post 840602 Article Entitled, Error Costly at Reactor, Which Cites Criticisms of Util Re Removal of Thermal Heat Shield.Expresses Concern Re Reserve Capacity of Spent Fuel Pools at All Florida Nuclear Plants ML17266A5351981-12-14014 December 1981 Comments on Des for Facility ML20038B5071981-11-14014 November 1981 Opposes Nuclear Power in General & Licensing of Facility Specifically ML17212A9881981-11-0909 November 1981 Urges Against Licensing of Plants W/Unresolved Safety Items & Known Deficiencies.Grave Risks to Public Health & Safety Cited ML17212A9081981-09-11011 September 1981 Expresses Concern Re Red Tape Involved in Licensing Plants ML17212A2381981-06-15015 June 1981 Urges That Electricity Users Be Compensated for Conservation Efforts ML17209B2581981-06-12012 June 1981 Withdraws Petition to Intervene in Proceeding ML17212A2991981-05-22022 May 1981 Supports Facility Licensing ML17209B2451981-04-22022 April 1981 Opposes Facility Licensing ML17209A9481981-04-0606 April 1981 Supports M Mcdonald 810303 Request to Advance NRC Scheduled Completion Date of Facility.Schedule Advance Would Reduce Potential Increases in Electric Rates from Use of Other Fuels ML17209A9171981-03-24024 March 1981 Supports Licensing of Facility ML17266A2851980-04-16016 April 1980 Suppls 800326 Conference Request in Behalf of Fl Cities. Requests Info Re Ft Pierce Withdrawal from Proceeding.Fl Cities Should Be Allowed to Participate in Negotiations.Ee Menge 800401 Ltr to Rj Gardner & Certificate of Svc Encl ML19323B6291980-03-29029 March 1980 FOIA Request for Info Re Facilities Including Ros,Safety Violations,Nuclear Waste Transport,Decommissioning,Nuclear Waste Storage & Radiation Contamination ML20147E1681978-11-16016 November 1978 FOIA Request for Items on Streaming(Or Shielding) Re Subj Facils 1989-04-27
[Table view] |
Text
March 19, 1957 11ZC Jasmine Avenue Ft Pierce, Florida 33452 (30$ ) 461-0771 Adm. Lando VF. Ecch, Jr.
Chairman U. S. Nuclear Regulatory Commission Washington, D.C. 20/$ 5
Dear Admiral Zech:
Thank you for attending the recent dedication of the operator training facility for St. Lucie I and II nuclear power plants. I understand it is a fine facility, and your taking the time to come down demonstrates an interest which encourages me to write to you.
I'm convinced that the evacuation-plan required by NRC for St. Lucie I and II and accepted as satisfactory by FEMA is a disaster waiting to happen and getting worse daily. Beginning with the FPkL Draft Environmental Statement which. projected zero population growth to the year 2000 on, Hutchinson Island, site of the plants, and continuing to FEMA's acceptance of an evacuation route which would pile eziting island residents from St. Lucie County and Martin County over two inadequate Martin County bridges onto a boxed- in, two lane scenic highway with no right of way for ezpansion, down to the present St. Lucie County policy of permitting high density residential growth on the island while not planning for a bridge for twenty years, the "plan" is a pitiful attempt to meet emergency planning requirements.
Phil Rodi, the St. Lucie County Emergency Management Director, whom you met at the dedication, has protested publicly over the lack of adequate roadways The highlighted adjectives in the enclosed article'from Christian Science Monitor of Feb. 27, 1957, are the loosely quantitative words we find so difficultto deal with in many rulings on the safety of nuclear power plants. And, yes, I'm sure St. Lucie I and II are among plants whose evacuation plans have been judged "successfully tested." However, a test which includes only the personnel who work at the plant, but not the people who live in a probable evacuation area, can hardly be termed an evacuation test.
70056 870429 PDR DOCK 050003~5 AD
~ . Si Since the local and state governments know> of these evacuation problems, but seem reluctant to face reality and solve them, I am miting to ask if your agency should help.
Sincerely, Betty Lou Wells enc.C.SMonitor article cc: Phil Rodi
O. yl e
s
~ r
~ ~
@fr d ~rag d t r s c
~
('.d'" i) sr s>>> n t S P o d O
~~ark ",tI 4
rrt +4'*!'d f'--i - 'xv'"'~
-rr tt'+~'~<
," Sg r ~
" + ' tr- >tt ga "eebrook nuclear plant, overlooking Hampton Beach resort In N.H., was completed In 1986 - but debate keeps It shut strongly oppose a proposed regu-C SIR Stat~ By Donald L. Rheem Staff ssrriter ot The Christia Soferce Mortitor lation that they claim would di-minish the rights of state and l+t OVCE A. pMII, "b Washington local governments to protect pub-ViSCUSLtEOH P ~ mission and states'are debating over emergency evacuation in a packed NRG hearing room earlier this week, NRC commis-sioners heard members of Con-gress and several governors lic health and safety.
The issue centers on a regula-tion passed soon after the Three Mile Island (TMI) nuclear power plant accident.
After TMI, many ofiicials and Ptltse see NONE pttge 6
~9A~ >><<>> i%~Q + ~>>',>> @
+
g A+M ~ ' "~
)p orial view of Seabrook: Massachusetts Qov..Oukakls (right), fighting plant startup, says emargency evacuation.is Iml q,,'on I *
- -, -.,".'.-:,-: Long bland and the.Seabrook plant in:- vanhhing ~int.." ""-' -
NUKE~'- -.=
s"..':-:..='-'KK
'.: -"New Hampshire"'are mostly.'ompleted; ' NRC'chairman Lando W; Red
.';=.'uttheir-Hcensihghasbeenheldupbythe', out that the cominission has not residents were surpris'ed. to.1earn,that@governors"refusal to,paiticipate in plan) 'whether" it wiH act on -
was no emergency. plan to',evac'uatej'9 ning;.;:~=,"'- '."',-'"'=-":.y,"~~-,' ".. change suggested by NRC staiF. ')
the'hee
~<
..'Ib remedy this'shortcoming;"-',; TheggCwouldHketo,changethe 1980I cisl"meeting was:simply anIoppc Congress passed legislation<'requiring'. rule, aHowing ne~ nuclear facilities'o'., for; the'coinmission'to hear the v emergency planning for ail'nuclear power- 'e'gin =ope'ration~'even; if-'ocal official" congressional,an'd state offIcials.
plants. Since any evacuation'pla'n,would ~,'refu'se, tocooperate.in-,'a>>utUity~ted;';In an inteinal'brieffng docume involve state and local equipment-'and~@NRC;appxovedplan:'.>>"j$ ,. pared b'y the NRC stafF, several po.
peisonnel,,Congress. made sure these offi-als would'be'involved'in.the
"',wi
.,!>>Govs:Ma>>rio'Cuomo plan itself. meeting"Ihesday that the.
... >> 0>> i >> ',4,,,
Govern'or, Cuoiiio test@ed at the NR>>C>ade to.r'esp'ond't'o,the"anticipatec
" "proposed nile, ttons t'o the ride c>>hange:;;".," '..
">>>>."-;ltd,'i
of-New York'and tutional. myonsibi1ity: of'tate gov~ emergency~ phiiinlng'"requirei8ent
~
'-ing F
'I.
Michael Dukalds of 'setts', have,-.,ments to,protect the health and safety'$fj l'.'coinfkhfi staN'.bg. NN'; gdp~
pftused to work..vri:VitiHties:in.develop-, theh'.Stixen's';" He called the NRC's pro - partici jate in such'-pl~,'so:tl
. In< the plans in the hopes of killing spe-~;posal ~hntiaHy dangerous 'l saying'-it no infnr'ir!emeijt.on, or>invasIon of ciffc power plant's.- The Shorehsm plant'redue6Yngcern for$iigcs'afety,to Qte,~>'Lap"-'ptk8gatldd",.'andli@~e'bH
'o'4 ~~ ~~ s . w~ ~ ~g '$. g g~, -.~ ." >" '"'a-",~oTh'e~pRO~~p5$ umes'";that'llob
'cials jAH'u'se'a" utiH&j's'ply'&~an, x emeigen~'thgminhdssion doeh1
'ject" utilltfes'to assume.poHce>> powi o The propose'd'chinge'would x tract from the. rights of.cithens'ani
'and-local-.governinenM to,a planning;. '."-I; f,
'urrent NRC rules>> stipulate,I,tha hear,'meqtency clear,"reactor'ca'nnot be issued a HcI operate'unless "there>> isi&sonibie ance that ad.@a%'gr'otective me can and mid be taken in tlie ever radiological, emergency.", The ru1<
ther'state that there must be'5R8s
.'5sxtc'e that they, can b' implexM n"
1 e
8 4 Since,"-
8 nRef StatN".SG -
drat of the ptopoeed mle chsnde;She NRC'cotoplslns that "in a few cases, state or local gee'in-ments have not dS'Hoped an erne'racy
~ plan of their ownW*eepenCbd 0'ith'the
'utHity in developing'6ne
'Since stite an'd 'local'45dhls ibid hake to ca'rry out'Inc'igency plans, their refusal to cooperate with utQlles throws enough doubt ott"QN aiqulheient,that protective nieasu'&as "willbe scen" m'to t the, Issohlg'tR the/hint'8'opethe.
Bc6eb'"
!"detttIL&d tibi:Intel'hdido'tthith-
~ end Iocet othihtls eetopnottnott iethtth&
~tnt."prov'id;in'.all.other')igectsof- '
, theMh~g@iNRA'i'~Geld 'op-
',-bra5on."'WhyfHQ'es'for ~eh@Q8e'-'
nN
".> Under Rhcy plan' 8~
iQng'~ 46i5dtt'In"4980, that IpuNc%5@Q~o6M,S
'he'uU&ty&CeveiopmmephSe al-lhe NSO" ',
the prxqeihdcMdge',OPS, h oplesed; Umj~.'u to'Qp,ggQ,~
~
-'lacnlvof 4nthe 'h'n';thkNeih5has 4nade e ~faith'and sustained" eifott cooperate Chit the plan~pen- 'et
,,sates for the lack of p
~en~
"oopies of the planaregiven to all mvelant and that t authorizes.
kauzding to one. industry source, the',
I?6K is expected to issue the new rule and:
"let the courts or Congress decide the is-
- sue. "We expect the issue to go all the way to the Supreme Court," he said
N 8C:.chief,':
lauds FPL over~lant By Peter Williams N~eh Mfriter
+ 87 The chairman of the Nuclear Rregulatory. Commission praised Florida Power Sc Light Co.'for its "
.operating record at the St.'Lucie I I,;nuclear power plant Tuesday P
'i< morning but cautioned. corporate officials not to relax their efforts z,toimproyesa'fety. " -
~
Lando W. Zech Jr. visited the <
, St. Lucie nuclear power plant on ",
South Hutchinson Island,to at- i tend the dedication of a $ 1B 1 mQlion training center. Later in g the morning he flew back to his home in Falls Church, Va.
'"I A:ommend FPL on this in- P
,vestment it,'s a wise inyest- 'j ment," Zecg said. ".This.(center) j
='s a commitment that the in-
-. dustry has'madel't is not an NRC program. "You should never forget that training is a direct contributor toward safety.
"We at the NRC are very aware .that St, Lucie has established records, for. both the U.S. and the world;" he said.
",You'e got avwonderful 1ecord )
and I'm proud of 'it ... but don't $
slack up."
The new training center is )ust north of the two nuclear gower plants.
"We would like to accept that challenge to remain on top," said Ken Harris, the site vice presi dent for FPL.
The 55;820.stluare-foot two-
' story training building will house classrooms and'a reactor control room simulator. Oker'he course of this year, FPI expects about I 600 people will attend<<classes at ",
the center.
The centeris owned byFPL, ',"
'but't's part of an industry'-wide I i, effort to Chile jkprove training 'pro-the FPL training," 'edures.
pfogram~at St. Lucie meets-NRC
>standakps; ~'ZL plant'.at Point 'has- in the past 'urkeys come1lndexflre. ~-
'lf J
t
.' ~ .
The idea of a training center it Turk~ Point and St. Lucie 'oth has baden in the works for about:
four years. The center at Turkey !
Point was dedicated on Monday.
"FPL started Iong before the i industry committed Itself," said <
Ken Strahm, the executive direc- !
tor for the National Academy for i Nuclear Training.
The ma)or part of the new center wIII be the simulator. It be an exact replica of the in-,
side of the control rooms of both St. t.ucie Unit 1 and Unit G.
Through the use of computers, it can duplicate about 15,000 dif-ferent situations that an operator
.. may face.
"When we get It')nstalied, you could blindfold someone and br-Ing them 'in'ere and you wouldn't know If you were in the real control room or the simulator," one company official l said.
The simulator itself is expected to cost between $ 8 mIIIIon and
$ )0 mIQion. It Is being built by Canadian Aviation Electronics Ltd. In Montreal. FPL expects delivery in August.
Vntil then,.FPL depends on a simulator in Windsor, Conn.
Students enrolled in the reactor operator program must travel I there to undergo the four weeks of simulator training they need to get a license. The same holds true for those who are already licens.
ed but must take some simulator training each year.
About four dosen FPL
! employees, industry officials,
~
public officials and represen.
tatives of the National Academy for Nuclear Tra)ning attended the ceremony. ".'.~ ~
"' chemistry technicians, instru The academy'n a~reditmg ment and control peqknnel, elec-
., agency for nuclear Industry. Of trical maintenance workers, the 10 categories of accredita- mechanical maintenance workers tion, FPL has completed work on and site technical staff and four of them. The four deal with managers.
non-licensed operators, reactor
. operators, senior reactor The number of people on the
~ operators and health physics training staff at St. Lucie has In.
technicians. creased from 37 in early 1984 to Sy the end of 1987, FPL of- 58 today. The number of students I
ficials said, they hope to be ac- trained annually has increased.
- credited in the other six areas- from 80 in )983 to a prpjected 800 e shif t . Cechgical. adviser's, this year.