VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261

  • ' October 30, 2017
  • ,

U.S. Nuclear Regulatory Commission Serial No.17-413 Attention: Document Control Desk NRNDEA RO Washington, DC 20555 Docket Nos.: 50-338/339 License Nos.: NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 IMPLEMENTATION OF LICENSE RENEWAL .COMMITMENTS By letter dated May 29, 2001 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML011500480), Virginia Electric and Power Company (Dominion Energy Virginia) submitted an application pursuant to Title 10 of the Code of Federal Regulations (CFR), Part 54 for renewal of Operating Licenses NPF-4 and NPF-7 for North Anna Power Station (NAPS), Units 1 and 2, respectively.

In accordance with 10 CFR 54.21 (d), an FSAR supplement was provided with the application for renewed operating licenses. Table 18-1 of the FSAR supplement for NAPS Units 1 and 2 contained twenty-nine commitments that were to be completed prior to the period of extended operation. The period of extended operation is the period of 20 years beyond the expiration date of each unit's original operating license.

For North Anna Unit 1, the period of extended operation is from April 2, 2018 to April 1, 2038 and for North Anna Unit 2, from August 22, 2020 to August 21, 2040. Completion of these commitments prior to the period of extended operation was also specified in Renewed Facility Operating License Conditions 2.F(1) for NAPS 1 and NAPS 2 issued on March 20, 2003 (ML030710581).

Specifically, Renewed Facility Operating License Condition 2.F(1) for NAPS 1 and NAPS 2 states, "The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21 (d), as revised on July 25, October 1, November 4, and December 2, 2002, describes certain future inspection activities be completed before the period of extended operation. The licensee shall complete these activities no later than April 1, 2018 (Unit 1) I August 21, 2020 (Unit 2), and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection."

Pursuant to Renewed Facility Operating License Condition 2.F(1) for NAPS 1 and NAPS 2, Dominion Energy Virginia is providing written notification that the twenty-nine commitments listed in Table 18-1 of the NAPS UFSAR have been completed and are ready for verification by NRC inspection.

Serial No.17-413 Docket Nos.: 50-338/339 Page 2 of 2 If you have any questions regarding this submittal, please contact Ms. Diane E. Aitken at (804) 273-2694.

Sincerely, Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Commitments made in this letter: None cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 Mr. James R. Hall NRC Senior Project Manager One White Flint North Mail Stop 0-8 81-A 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. J. E. Reasor, Jr.