September 11, 2017, Summary of Meeting with Entergy Operations, Inc. to Discuss a Proposed New Technical Specification Traveler for River Bend Station (CAC No. MG0159; EPID L-2017-LRM-0036)
ML17303A599
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/07/2017
From: Lisa Regner
Plant Licensing Branch IV
To:
Regner, L M, 301-415-1906
References
CAC MG0159, EPID L-2017-LRM-0036
Download: ML17303A599 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 7, 2017 LICENSEE:

Entergy Operations, Inc.

FACILITY:

River Bend Station, Unit 1

SUBJECT:

SUMMARY

OF SEPTEMBER 11, 2017, MEETING WITH ENTERGY OPERATIONS, INC. TO DISCUSS A PROPOSED NEW TECHNICAL SPECIFICATION TRAVELER FOR RIVER BEND STATION (CAC NO. MG0159; EPID L-2017-LRM-0036)

On September 11, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Operations, Inc. (Entergy, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The meeting notice and agenda, dated August 31, 2017, are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17250A083. The purpose of the meeting was to discuss a proposed license amendment request to change technical specifications (TSs) for River Bend Station, Unit 1 (RBS). The TS changes would follow Technical Specifications Task Force {TSTF) Traveler TSTF 542, Revision 2, "Reactor Pressure Vessel Water Inventory Control." A list of meeting attendees is enclosed.

The licensee presented the information in the draft handout found in ADAMS at Accession No. ML17249A250. The recommended changes to the improved Standard TSs are found in the NRG staff's Final Model Safety Evaluation tor TSTF-542, Revision 2, in ADAMS at Accession No. ML16343B065, and are based on the improved Standard TSs in NUREG-1433, "Standard Technical Specifications-General Electric Plants BWR [Boiling Water Reactor]/4 Plants." RBS TSs are based on NUREG 1434, "Standard Technical Specifications-General Electric BWR/6 Plants" (ADAMS Accession No. ML12104A195), and are not directly applicable; however, the licensee stated that these variations would not affect the applicability of TSTF-542 or the NRG staff's safety evaluation.

The licensee discussed both the proposed 6 administrative changes and 12 technical changes to account for the differences from the approved TSTF-542. The licensee stated its intent to submit the amendment request by the end of the month. This was subsequently revised to the end of October 2017. The licensee intended to implement the change during its spring 2019 refueling outage.

The NRG staff recommended that Entergy conduct a detailed review to ensure it would submit a high quality submittal of the TS changes, since many of the questions that the NRG staff have asked during its reviews of this TSTF for other plants are related to quality control. The NRG staff also recommended that Entergy review the questions generated for the Clinton Power Station, Unit No. 1 (Clinton) to inform its submittal, since RBS and Clinton are similar in design.

Members of the public were not in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1906 o e-mail at Lisa.Regner@nrc.gov.

Docket No. 50-458

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv 1sa M. Regner, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

LIST OF ATTENDEES SEPTEMBER 11, 2017, MEETING WITH ENTERGY OPERATIONS, INC.

REGARDING PROPOSED LICENSE AMENDMENT TO ADOPT TECHNICAL SPECIFICATIONS TASK FORCE (TSTF)-542 FOR RIVER BEND STATION, UNIT 1 DOCKET NO. 50-458 NAME ORGANIZATION Lisa Regner U.S. Nuclear Regulatory Commission (NRC)

Larry Wheeler NRG Dan Warner NRG Diana Woodyatt NRG Jeff Sowa NRG Russ Haskell NRG Marvin Chase Entergy Operations, Inc.

Danny Williamson Entergy Operations, Inc.

Patrick Price Entergy Operations, Inc.

John Giddens Entergy Nuclear Brian Mann EXCEL Services Corporation Bill Victor EXCEL Services Corporation Enclosure

SUBJECT:

SUMMARY

OF SEPTEMBER 11, 2017, MEETING WITH ENTERGY OPERATIONS, INC. TO DISCUSS A PROPOSED NEW TECHNICAL SPECIFICATION TRAVELER FOR RIVER BEND STATION (CAC NO. MG0159:

EPID L-2017-LRM-0036) DATED NOVEMBER 7, 2017 DISTRIBUTION:

PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsNrrDeEicb Resource RidsNrrDorllpl4 Resource RidsNrrDssSrxb Resource RidsNrrDssStsb Resource RidsNrrPMRiverBend Resource RidsNrrLAPBlechman Resource RidsRgn4MailCenter Resource DWarner, NRR LWheeler, NRR ADAMS Accession No* ML17303A599 OFFICE NRRIDORULPL4/PM NRR/DORLILPL4/LA NRR/DE/EICB/BC NAME LRegner PBlechman MWaters DATE 10130/17 10131117 11/03/17 OFFICE NRR/OSS/STSB/BC NRR/DORULPL4/BC NRRIDORLILPL4/PM NAME VCusumano RPascarelli LRegner DATE 11103117 11/07/17 11/07117 OFFICIAL AGENCY RECORD DWoodyatt, NRR JSowa, NRR RHaskell, NRR

TWertz, JBowen, EDO, RIV NRR/DSSISRXB/BC EOesterle 11/03/17