Notice of Violation from Insp on 850128-31
ML17301A155
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/28/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17301A154 List:
References
50-335-85-04, 50-335-85-4, 50-389-85-04, 50-389-85-4, NUDOCS 8503200130
Download: ML17301A155 (1)


Text

ENCLOSURE 1

NOTICE OF VIOLATION Florida Power and Light Company St. Lucie Docket Nos. 50-335 and 50-389 License Nos.

DPR-67 and NPF-16 The following violation was identified during an inspection conducted on January 28-31, 1985.

The Severity Level was assigned in accordance with the NRC Enforcement Policy

( 10 CFR Part 2., Appendix C).

Technical Specification 6.8. 1.c. (Units 1 and 2) requires that procedures be implemented for surveillance and test activities of safety-related equipment.

Paragraphs 8.2.5.B and 8.2.8.A of Administrative Procedure

0010132, the applicable procedure for inservice testing (IST) of ASME pumps and valves, requires that entries be made in the control room "Pump and Valve Summary" book to indicate the current status of testing.

Contrary to the above, on January 30,

1985, procedure 0010132 had not been properly implemented in that entries indicating testing status had not been made for:

Unit 1

Charging pump 1B, July 1984; Unit 2 Hydrazine pump's 2A and 2B, April - June 1984; Unit 2 High Pressure Safety Injection (HPSI) pump 2A, January

- February 1984; and Unit 2 Low Pressure Safety Injection (LPSI) pump 2A, January - February 1984.

This is a Severity Level V violation (Supplement I).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including:

(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.

Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.