Gune 23, 1999 Mr. J. V. Parrish Chief Executive Officer Washington Public Power Supply System P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT:
REQUEST FOR ADDITIONALINFORMATION(RAI) FOR THE WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECT NO. 2 (TAC NO. MA5307)
Dear Mr. Parrish:
The NRC staff has reviewed your amendment request regarding the pressure temperature limit curves dated April20, 1999. As a result of the review, the staff has determined that additional information is needed to complete the review. The information needed is detailed in the enclosure.
The enclosed request was discussed with Mr. Arbuckle of your staff on June 14, 1999. A mutually agreeable target date of September 2, 1999, was established for responding to the RAI. If circumstances result in the need to revise the target date, please call me at your earliest opportunity at (301) 415-1424.
Docket No. 50-397 Sincerely,
/s/
Jack Gushing, Project Manager, Section 2
, 'roject Directorate IV 8 Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation f
Enclosure:
Request for Additional,Information cc w/encl: See next page DISTRIBUTION
~Docket F~ils PUBLIC PDIV-2 Reading SRichards S Black OGC ACRS SSheng LSmith, RGN-IV o.receive.::a co o:.;t is.:: ocumen
-:.:in ica e...c.:.::.::in e:
ox:..:
NAME DATE J Gushing:rb EpeeyoC
/A-F9 C /Nl /99 OFFICE PDIV-2/PM C PDIV-2/LA C PDIV-2/SC SDe ek 4 /2L-/99 DOCUMENT NAME: G:FPDIV-2>WNP2>RAIA5307.wpd OFFICIAL RECORD COPY
.ic:5 9906280274 990623 PDR ADOCK 05000397 P
(4~$ L AE00
~o
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205'i54001 dune 23; 1999 Mr. J. V. Parrish Chief Executive Officer Washington Public Power Supply System P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT:
REQUEST FOR ADDITIONALINFORMATION(RAI) FOR THE WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECT NO. 2 (TAC NO. MA5307)
Dear Mr. Parrish:
The NRC staff has reviewed your amendment request regarding the pressure temperature limit curves dated April20, 1999. As a result of the review, the staff has determined that additional information is needed to complete the review. The information needed is detailed in the enclosure.
The enclosed request was discussed with Mr. Arbuckle of your staff on June 14, 1999. A mutually agreeable target date of September 2, 1999, was established for responding to the RAI. Ifcircumstances result in the need to revise the target date, please call me at your earliest opportunity at (301) 415-1424.
Sincerely, ack Gushing, Project Manager, Section 2 Project Directorate IV 8 Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosure:
Request for Additional Information ccw/encl: See next page
Nuclear Project No. 2 CC:
Mr. Greg O. Smith (Mail Drop 927M)
Vice President, Generation Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352-0968 Mr. Albert E. Mouncer (Mail Drop 1396)
Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Ms. Deborah J. Ross, Chairman Energy Facility Site Evaluation Council P. O. Box 43172 Olympia, Washington 98504-3172 Mr. D. W. Coleman (Mail Drop PE20)
Regulatory Affairs Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul Inserra (Mail Drop PE20)
Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O. Box 69 Prosser, Washington 99350-0190 Senior Resident Inspector
'.S.
Nuclear Regulatory Commission P.O. Box 69 Richland, Washington 99352-0968 Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Op'erations Support/PIO Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352 Perry D. Robinson, Esq.
Winston &Stre.vn 1400 L Street, N.VA Washington, DC 20005-3502 Mr. Bob Nichols Executive Policy Division Office of the Governor P.O. Box 43113 Olympia, Washington 98504-3113
~t'
RE UEST FOR ADDITIONALINFORMATION WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECT NO. 2 NP-2 DOCKET NO. 50-397 1.
Pressure Stress Intensit Calculation Please provide the equation for the pressure stress intensity calculation.
In addition, please provide an example'sing the 150'F, 158 psig point from Figure 3.4.11-3 of your submittal. Provide all parameters that appear in the pressure stress intensity equation.
2.
Thermal Stress Intensit Calculation IfASME Code Figure G-2214-2 was used for the thermal stress calculation, please provide
,the detailed information needed to use the figure. Ifan equation was used instead, please provide the equation'and Young's Modulus, the coefficient of thermal expansion, and Poission's ratio. For either approach, use the 150'F, 158 psig point from Figure 3.4.11-3 of your submittal as an example, and provide values for the thermal diffusivity, heatup or cooldown rate, and wall thickness.
3.
Fracture Tou hness E uation Identify the fracture toughness equation used in your calculation.