ML17292B629

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/99-02 on 990207-0320.Three Violations Noted & Being Treated as Noncited Violations, Consistent with App C of NRC Enforcement Policy
ML17292B629
Person / Time
Site: Columbia 
Issue date: 04/09/1999
From: Laura Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17292B630 List:
References
50-397-99-02, 50-397-99-2, NUDOCS 9904150072
Download: ML17292B629 (7)


See also: IR 05000397/1999002

Text

i

nOc

~O

+g*e<

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Iv

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011-8064

APR -9 l999

Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Officer

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

SUBJECT:

NRC INSPECTION REPORT NO. 50-397/99-02

Dear Mr. Parrish:

This refers to the inspection conducted on February 7 through March 20, 1999, at the

Washington Nuclear Project-2 (WNP-2) facility. The enclosed report presents the results of this

inspection.

During the inspection period, your conduct of activities was generally characterized by

safety-conscious operations, sound engineering and maintenance practices, and careful

radiological work controls.

Based on the results of this inspection, the NRC has determined that three violations of NRC

requirements occurred.

These violations are being treated as noncited violations (NCVs),

consistent with Appendix C of the NRC Enforcement Policy. These NCVs are described in the

subject inspection report.

If you contest the violation or severity level of these NCVs, you

should provide a response withIn 30 days of the date of this inspection report, with the basis for

your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington, DC 20555-0001, with a copy to the Regional Administrator, Region IV, and the

Director, Office of Enforcement, United States Nuclear Regulatory Commission,

Washington, DC 20555-0001, and to the resident inspector at the facilitythat is the subject of

this report.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you.

Sincerely,

Linda J. Smith, Chief

Project Branch E

Division of Reactor Projects

Docket No.:

50-397

License No.:

NPF-21

9904150072

990409

PDR

ADOCK 05000397

8

PDR

Washington Public Power Supply System

-2-

Enclosure:

NRC Inspection Report No.

50-397/99-02

cc w/enclosure:

Chairman

Energy Facility Site Evaluation Council

P.O. Box 43172

Olympia, Washington

98504.-3172

'I

Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Greg O. Smith (Mail Drop 927M)

Vice President, Generation

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. D. W. Coleman (Mail Drop PE20)

Manager, Regulatory Affairs

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Albert E. Mouncer (Mail Drop 396)

Chief Counsel

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

lt

Washington Public Power Supply System

-3-

Perry D. Robinson, Esq.

Winston 8 Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

Bob Nichols

Executive Policy Division

Office of the Governor

P.O. Box 43113

Olympia, WA 98504-3113

Washington Public Power Supply System

-4-

APR -9 I999

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot.(FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

DRS Director

Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: Ri WN2iWN902RP.BAS

To receive co

of document, indicate inborn "C =Co

without enclosures

"E" =Co

with enclosures

N" = Noco

RIV:ASRI

BASmalldrid e

>

RIV:RI

JES

ets

PE:DRP/E

JFMelfi

C:DRP/E

LJSMITH I

03/24/99

JES

ets

m

JFMelfi

LJSMITH

04/'f/99

03/24/99

.- L.C5

04

/9

OFFICIAL RECORD COPY