ML17292B564
| ML17292B564 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/17/1999 |
| From: | Collins S NRC (Affiliation Not Assigned) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| TAC-MA4528, NUDOCS 9902230364 | |
| Download: ML17292B564 (8) | |
Text
gy,S AE00
+4
~o Cy
~ifl C
O
~G
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205554001 February 17, 1999 Mr. J. V. Parrish Chief Executive Officer Washington Public Power Supply System P. O. Box 968 (Mail Drop 1023)
Richland, Washington 99352-0968
SUBJECT:
REQUEST FOR CHANGE TO CONFIRMATORYORDER REGARDING THERMO-LAG FIRE 330-1 BARRIERS FOR WNP-2 (TAC NO. MA4528)
Dear Mr. Parrish:
This is to acknowledge your letter dated December 28, 1998, and as amended on February 4, 1999, that requested a change to the March 25, 1998, Confirmatory Order Modifying License for WNP-2. The Confirmatory Order included information which reflected that the final implementation of Thermo-Lag 330-1 fire barrier corrective actions at WNP-2 would be completed during the Spring 1999 maintenance and refueling outage.
You requested that the Confirmatory Order be revised to reflect completion of corrective actions during a Fall 1999 maintenance and refueling outage.
The staff understands that the reason for the change is a delay in the R-14 maintenance and refueling outage due to your planned transition of the plant from a 12-month to a 24-month fuel cycle during 1999. Also in discussions with your staff we learned that during the spring, there may be a fuel savings dispatch outage to support the transition to the longer fuel cycle.
- Further, as stated in your letter, this delay in completion of the corrective actions will not affect the overall work package close-out which remains scheduled for December 1999, as required by the Confirmatory Order.
We appreciate that you have provided us with this updated information and conclude that your request should be granted since it does not affect the ultimate ordered completion date.
Based on the information provided in your letter, and the fact that ifthere is a Spring 1999 outage, it will be for fuel savings and not for maintenance and refueling, I relax the Confirmatory Order such that the completion for implementation of Thermo-Lag 330-1 fire barrier corrective actions at WNP-2 may be changed from the Spring 1999 to the Fall 1999 maintenance and refueling outage.
7 99022303b4 9902i7 PDR ADOCK 05000 P
0
Mr. J. V. Parrish February 17, 1999 Ifyou have any questions concerning this letter, please contact the NRC Project Manager, Chet Poslusny, (301-415-1341).
Sincerely, Original Signed By Docket No. 50-397 cc: See next page a
ue s, Director Office of Nuclear Reactor Regulation n
DOCUMENT NAME: YELTICK3
- See Previous Concurrence Sheet OFC NAME DATE PDIV-2 CPo sn 2/
/99 P DIV-2/LA Epee'/8/99 PDI -2/
WB 4 OGC" JGoldber 1/14/99 NRR/SPLB*
TMarsh 1/14/99 OFC NAME DRPW A D*
ADP*
EAdensam BBo er
/
1/14/99 DATE 1/ 15/99 OFFICIAL RECORD COPY SCollins 2/ 4+ /99
I 1
J I
Mr. J. V. Parrish
'I CC:
Mr. Greg O. Smith (Mail Drop 927M)
Vice Preside'nt, Generation Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352-0968 Mr. Albert E. Mouncer (Mail Drop 1396)
Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Ms. Deborah J. Ross, Chairman Energy. Facility Site Evaluation Council P. O. Box 43172 Olympia, Washington 98504-3172 Mr. D. W. Coleman (Mail Drop PE20)
Regulatory Affairs Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul Inserra (Mail Drop PE20)
Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O. Box 69 Prosser, Washington 99350-0190 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, Washington 99352-0968 February 17, 1999 Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352 Perry D. Robinson, Esq.
Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005-3502
0
~f C
DISTRI UTION for letter to Mr. J. V. Fiardah dated Febroar 17 1999 Docket PUBLIC PDIV-2 Reading SCollins/RZimmerman BBoger EAdensam WBateman CPoslusny EPeyton JLieberman
. SECY OGC ACRS DLange, EDO JKilcrease, Region IV LHurley, Region IV KBrockman, Region IV LSmith, RegionlV GHill (2)
SWest
I
/