ML17292B563

From kanterella
Jump to navigation Jump to search

Confirms That Changes Presented in Rev 28 to Oqa Program Description for Plant,Unit 2,appear Consistent with Guidelines for non-reduction in Prior Commitments,Per
ML17292B563
Person / Time
Site: Columbia 
Issue date: 02/18/1999
From: Poslusny C
NRC (Affiliation Not Assigned)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
TAC-MA3979, NUDOCS 9902230093
Download: ML17292B563 (3)


Text

Febr uary 18, 1999 Mr. J. V. Parrish Chief Executive Officer Washington Public Power Supply System P.O. Box 968 (Mail Drop 1023)

Richland, Washington 99352-0968

SUBJECT:

REVISION 28 TO OPERATIONALQUALITYASSURANCE PROGRAM DESCRIPTION FOR THE WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS) NUCLEAR PROJECT NO. 2 (WNP-2) (TAC NO. MA3979)

Dear Mr. Parrish:

By letter dated October 23, 1998, WPPSS submitted Revision 28 to the Operational Quality Assurance Program Description (OQAPD) for WNP-2, as a non-reduction in prior commitments.

The staff reviewed OQAPD changes presented in the above revision and confirmed that the changes described appear consistent with our guidelines for non-reductions in commitments.

The changes primarily involved restructuring the Quality Services Group into functional areas and adding a second supervisor.

Appendix I, Qualification Requirements was also changed to show two Quality Services Supervisors.

The Manager, Quality position was not affected by this change other than this position now has more than one Supervisor, Quality reporting to the Manager, Quality. A more detailed review is not planned unless inspection or other review activities indicate that it is warranted.

Docket No. 50-397 cc: See next page e

E ACRS, TWFN OGC LSmith, Region IV KBrockman, Region IV

,,'Correia Sincerely, Original Signed By Chester Poslusny, Seriior Project Manager Project Directorate IV-2 Division of Licensing Project Management

'ffice of Nuclear Reactor Regulation I

DISTRIBUTION:

Docket File PUBLIC PDIV-2 Reading JZwolinski

,WBateman J Gushing, EPeyton DOCUMENT NAME: QA281.LET 1~ Igi Q OFC PDIV-NAME CPoslusn DATE 2/ 4/99 PDIV-2/LA EPe~on 2/1999 OFFICIAL RECORD COPY 9902230093

'3i'P02iS PDR ADOCK 05000397 P

PDR

Mr. J. V. Parrish February 18, 1999 Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352-0968 Mr. Albert E. Mouncer (Mail Drop 1396)

Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Ms. Deborah J. Ross, Chairman Energy Facility Site Evaluation Council P. O. Box 43172 Olympia, Washington 98504-3172 Mr. D. W. Coleman (Mail Drop PE20)

Regulatory Affairs Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul lnserra (Mail Drop PE20)

Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners

'.O.

Box69

Prosser, Washington 99350%190 Mr. Scott Boynton, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, Washington 99352%968 Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO Washington Public Power Supply System P. O..Box 968 Richland, Washington 99352 Perry D. Robinson, Esq.

Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502

0