ML17292B547

From kanterella
Jump to navigation Jump to search
Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam at WPPSS Facility on 990407.Ltr Listing Candidates for Exam & Personnel Proctoring Exam Must Be Submitted by Authorized Representative by 990305
ML17292B547
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/02/1999
From: Pellet J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9902050136
Download: ML17292B547 (4)


Text

+y,R Rfg+

P l~

Cl Oz Op

~O UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION IV 611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 76011-8064 Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Officer Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968

SUBJECT:

GENERIC FUNDAMENTALSSECTION OF THE WRITTEN OPERATOR LICENSING EXAMINATION

Dear Mr. Parrish:

The NRC plans to administer a Generic Fundamentals Examination Section (GFES) of the written operator licensing examination at your facility on April7, 1999. The GFES willconsist of 100 questions.

The maximum time allowed to complete the examination is 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and the passing score will be 80 percent.

P In order to nominate candidates, an authorized representative from your facility must submit a letter listing the names of candidates for the examination to the appropriate NRC Regional Administrator and to the Chief, Operator Licensing and Human Performance Branch. The letter must be received both in the Region and at NRC Headquarters by March 5, 1999, in order to allow us to assign docket numbers to the candidates and to make preparations for shipping the examinations to you for administration.

The letter must certify that the candidates willhave completed their fundamentals training by the date of the examination and are enrolled in.your training program leading to an NRC operator or senior operator license.

The letter must also list the names of personnel you will be using to proctor the examination and the address to which the examinations should be sent. A sample registration letter is enclosed.

The address for the Operator Licensing and Human Performance Branch Chief is as follows:

Robert M. Gallo, Chief Operator Licensing and Human Performance Branch U.S. Nuclear Regulatory Commission Mail Stop OWFN 9 D24 Washington, DC 20555 9902050i36 990202 PDR ADQCK 05000397 V

PDR

Washington Public Power Supply System Approximately 2 weeks prior to the examination administration date, your designated facility contact will be sent a letter delineating examination particulars (i.e., proctor responsibilities, student I.D. numbers, etc.)

Docket No.:

50-397 License No.:

NPF-21

Enclosure:

As stated John L. Pellet, Chief, Operations Branch Division of Reactor Safety cc w/enclosure:

Bill Shaeffer, Manager Nuclear Training Washington Public Power Supply System P.O. Box 968, MD-1022 Richland, WA 99352-0968 cc w/o enclosure:

Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-3172 Mr. Rodney L. Webring (Mail Drop PE08)

Vice Presiderit, Operations Support/PIO Washington Public Power Supply System P.O'. Box 968 Richland, Washington 99352-0968 Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant G'eneral Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. D. W. Coleman (Mail Drop PE20)

Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968

Washington Public Power Supply System Mr. Albert E. Mouncer (Mail Drop 396)

Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Perry D. Robinson, Esq.

Winston 8 Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502

Washington Public Power Supply System bcc to DCB (IE42) bcc distribution by RIV:

DRP Branch Chief Resident Inspector C. Poslusny, NRR (OWFN 13-E-16)

RIV file L. Miller,TID E. W. Merschoff, RA L. A. Hurley, GFES file DOCUMENT NAME GFES1 To receive co of docu nt. indicate in box: "C" ~ Co y without enclosures "E" ~ Co with enclosures "N" ~ No co RIV:OB:LA LAHurle 02/

/99 N

C:OB JLPellet 02/

/99

/ /99 OFFICIAL RECORD COPY

/ /99