ML17292B408

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/98-10 on 980601-05 & Notice of Violation.Violation Identified Re Failure to Follow Program Procedure
ML17292B408
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/18/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17292B409 List:
References
50-397-98-10, NUDOCS 9806220339
Download: ML17292B408 (7)


See also: IR 05000397/1998010

Text

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 760114064

June

18,

1998

Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Oflicer

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352%968

SUBJECT: NRC INSPECTION REPORT 50-397/98-10 AND NOTICE OF VIOLATION

Dear Mr. Parrish:

From June 1-5, 1998, a radiation protection inspection, which focused on as low as is

reasonably achievable (ALARA)activities, was conducted at your Washington Nuclear Project-2

reactor facility. The enclosed report presents the scope and results ofthat inspection.

The inspection Identified one violation of NRC requirements.

The violation involved the failure to

followALARAprogram procedures.

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances

~

~

~

~

surrounding this violation are described in detail in the enclosed report. Please note that you are

required to respond to this letter and should followthe instructions specified in the enclosed

Notice when preparing your response.

The NRC willuse your response,

in part, to determine

whether further enforcement action is necessary to ensure compliance with regulatory

requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure(s), and your response willbe placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you.

Sincerely,

Blaine Murray, Chief

Plant Support Branch

Division of Reactor Safety

Docket No.:

50-397

License No.:

NPF-21

9806220339

9806i8

PDR

ADQCK 050003'P7

8

PDR

Washington Public Power

Supply System

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-397/98-10

cc w/enclosures:

Chairman

Energy Facility Site Evaluation Council

P.O. Box 43172

Olympia, Washington

98504-3172

Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. D. W. Coleman (Mail Drop PE20)

Manager, Regulatory Affairs

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Albert E. Mouncer (Mail Drop 396)

Chief Counsel

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Perry D. Robinson, Esq.

Winston 8 Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

Washington Public Power Supply System

-3-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE06)

bcc distrib. by RIV:

Regional Administrator

DRS Director

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

DRS Action Item File (98-G-99)(Goines)

Resident Inspector

DRS Deputy Director

DRS-PSB

MIS System

RIV File

DOCU

N

Toreceiv

cop

NAM: R:h WN2(WN810RP.MPS

d

ment, indicate lnbox:"C" = Cop

withoutenclosures

"E" = Copy with enclosures

"N"= No cop

RIV:PSB

E

MShanno

06($98

C:DRPiE

HWon

06/ /

C:DRS'IPSB

BM rray

06/

8

OFFICIAL RECORD COPY

Washington Public Power Supply System

-3-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE06)

bcc distrib. by RIV:

Regional Administrator

DRS Director

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

DRS Action Item File (98-G-99)(Goines)

Resident Inspector

DRS Deputy Director

DRS-PSB

MIS System

RIV File

DOCU

N

To receiv

cop

NAM: R:5 WN2iWN810RP.MPS

d

ment. Indicate in box: "C" = Cop

without enctosures

"E" = Copy with enciosures "N"= No cop

RIV:PSB"

E

MShanno

06gSie8

C:DRP'tE

HWon

06/ /

C:DRStiPSB

BM rray

06/

8

OFFICIAL RECORD COPY

1g