ML17292B395

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/96-25 on 961209-13.No Violations Noted
ML17292B395
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/31/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17292B396 List:
References
50-397-96-25, NUDOCS 9805210389
Download: ML17292B395 (5)


See also: IR 05000397/1996025

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9805210389

DOC.DATE: 96/12/31

NOTARIZED: NO

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public

Powe

AUTH.NAME

AUTHOR AFFILIATION

GWYNN,T.P.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT: Forwards insp rept 50-397/96-25

on 961209-13.No violations

noted.

DOCKET

05000397

DISTRIBUTION CODE,

IE51T

COPIES

RECEIVED:LTR $ ENCL $

SZZE: 3 7

TITLE: Pile Dist for Region Document

(50 DKT):Region,

PDR,

LPDR, NSIC

NOTES:

'

RECIPIENT

ID CODE/NAME

POSLUSNY,C

INTERN

LE CENTE,

EXTERNAL: NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

RGN4

PILE 01

COPIES

LTTR ENCL

1

1

0

D

0

N

TI'".]9 OQS" / <Q]<)g'f

H~b L'.'C S~APJNFD

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATZON, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

FULL TEXT CONVERSION REQUIRED

TOTAL NUMBER OF COPIES

REQUIRED: LTTR

4

ENCL

4

~gS MCy~

Vp0

Cl

I

0

~O

+a*++

UNITEO STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PlAZAORIVE, SUITE 400

ARlINGTON,TEXAS 76011%064

DEC 3 j

l996

J. V. Parrish, Chief Executive Officer

Washington Public Power Supply System

3000 George Washington Way

P.O. Box 968, MD 1023

Richland, Washington

99352

SUBJECT'RC'INSPECTION REPORT 50-397/96-25

Dear Mr. Parrish:

An NRC inspection was conducted December 9-13, 1996, at your Washington Nuclear

Project-2 reactor facility. The enclosed report presents the scope and results of that

inspection.

'

The purpose of this inspection was primarily to evaluate the effectiveness of the licensed

operator requalification program.

The inspection used the annual licensed operator

requalification examinations to assess

licensed operator performance.

The inspection also

evaluated the operations training staff in the development, administration, and evaluation

of the biennial requalification examination.

Overall, we observed good licensed operator

performance with regard to communication, command and control, annunciator response,

procedure usage,

and self checking.

The operations training staff developed, administered,

and evaluated the requalification examinations professionally and accurately.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

A

omas P. G

ynn,director

Division of Reactor Safety

,

Docket No.: 50-397

License No.:

NPF-21

'.'

I'Ij

98052i0389 96i23i

PDR

ADQCK 05000397

8

PDR

Washington Public Power

Sypply System

-2-

Enclosure:

NRC Inspection Report

50-397/96-25

cc w/enclosure:

Frederick S. Adair, Chairman

Energy Facility Site Evaluation Council

P.O. Box 43172

Olympia, Washington

98504-3172

Mr. Paul R. Bemis (Mail Drop PE20)

Vice President, Nuclear Operations

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

"

Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. David A. Swank (Mail Drop PE20)

Manager, Regulatory Affairs

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Al E. Mouncer (Mail Drop 396)

Chief Counsel

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Ms. Lourdes C. Fernandez

(Mail Drop PE20)

Manager, Licensing

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Washington Public Power

Sypply System

Mr. Malcolm H. Phillips, Jr.,

Esq.'inston

8c Strawn

1400.L Street, N.W.

Washington, D.C. 20005-3502