ML17292B058
ML17292B058 | |
Person / Time | |
---|---|
Site: | Columbia ![]() |
Issue date: | 09/18/1997 |
From: | Colburn T NRC (Affiliation Not Assigned) |
To: | |
Shared Package | |
ML17292B059 | List: |
References | |
NUDOCS 9709290184 | |
Download: ML17292B058 (8) | |
Text
~P,R REGS (4+4, PO I
0, rw 0'
Ol O
+
gO
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 NUCLEAR PROJECT NO.
2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
152 License No.
NPF-21 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application f'r amendment by the Washington Public Power Supply System (licensee) dated August 14, 1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application. the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common
'defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of'acility Operating License No.
NPF-21 is hereby amended to read as follows:
9709290184 9709i8 PDR ADQCK 05000397 P
t l'
J (2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 152 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This amendment is effective as of its date of issuance to be implemented within 30 days of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Timothy G. Colburn.
Senior Project Hanager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:"
September 18, 1997
P M
j
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.
152 TO FACILITY OPERATING LICENSE NO.
NPF-21 DOCKET NO. 50-397 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.
The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
REMOVE 5.0-11 5.0-12 INSERT 5.0-11 5.0-12
Ji It i
jt,'
t
Programs and Manuals 5.5
\\
5.5.
Programs and Manuals (continued) 5.5.6 serv ce Test o ram This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 pumps and valves.*
Testing Frequencies specified fn Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as follows:
ASHE Boiler and Pressure Vessel Code and applicable Addenda terminology for inservice testing act vities Required Frequencies for performing inservice testin act vit'es Weekly Monthly quarterly or every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years At least once per 7 days At least once per 31 days At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days At least once per 731 days b.
The provisions of SR 3.0.2 are applicable to the above required Frequencies for performing inservice testing activities; c,
The provisions of SR 3.0.3 are applicable to inservice testing activities; and d.
Nothing in the ASHE Boiler and Pressure Vessel Code shall be construed to supersede the requirements of any TS.
5.5.7 e tilat o F lte estin P
o a
V P
The VFTP shall establish the required testing of Engineered Safety Feature (ESF) filter ventilation systems.
contin ed
- The Inservice Testing Program requirement for full stroke exercise testing at each refueling outage for TIP-V-6 shall not be required for,the refueling outage conducted in the Spring, 1997.
This exception shall expire upon reaching MODE 4 for a plant shutdown of sufficient duration to allow TIP-V-6
=
- testing, or May 15, 1998, whichever occurs first.
WNP-2 5.0-11 Amendment No. 449,152
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.7 Ventilat on Filter est'o ram V
{continued)
Tests described in Specification 5.5.7.a and 5.5.7.b shall be performed once per 24 months; after each complete or partial replacement of the HEPA filter train or charcoal adsorber filter; after any structural maintenance on the system housing;
- and, following significant painting, fire, or chemical release in any ventilation zone communicating with the system while it is in operation.
Tests described in Specification 5.5.7.c shall be performed once per 24 months; after 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of system operation; after any structural maintenance on the system housing; and, following significant painting, fire, or'hemical release in any ventilation zone communicating with the system while it is in operation.
Tests described in Specification 5.5.7.d and 5.5.7.e shall be performed once per 24 months.
Flowrate {cfm)
The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the VFTP test Frequencies.
a.
Demonstrate for each of the ESF systems that an inplace test of the high efficiency particulate air (HEPA) filters shows a penetration and system bypass
< 0.05% when tested in accordance with Regulatory Guide 1.52, Revision 2, and ASHE N510-1989 at the system flowrate specified below:
ESF Ventilation System SGT System CREF System 4012 to 4902 900 to 1100 b.
Demonstrate for each of the ESF systems that an inplace test of the charcoal adsorber shows a penetration and system bypass
< 0.05% when tested in accordance with Regulatory Guide 1.52, Revision 2, and ASME N510-1989 at the system flowrate specified below:
ESF Ventilation System SGT System CREF System Flowrate {cfm) 4012 to 4902 900 to 1100 continued WNP-2 5.0;12 Amendment No. 449.'152