UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&0001 dune 5,
1997 Hr. J.
V. Parrish Chief Executive Officer a
Washington Public Power Supply System P.O.
Box 968 (Hail Drop 1023)
- Richland, Washington 99352-0968
SUBJECT:
INSERVICE INSPECTION PROGRAM RELIEF REQUEST FOR REACTOR PRESSURE VESSEL ALTERNATIVE EXAM FOR THE WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)
NUCLEAR PROJECT NO.
2 (WNP-2)
Dear Hr. Parrish:
By letter dated December 15,
- 1995, WPPSS submitted a proposed alternative examination for the reactor pressure vessel in accordance with 10 CFR 50.55a(g)(6)(ii)(A) and requested that the proposed alternative be accepted as the revised relief request 2-ISI-001 for the first 10-year inspecti"on interval.
The Commission's regulations, specifically, 10 CFR 50.55a, require that inservice inspection of certain ASHE Code Class 1, 2, and 3 components be performed in accordance with Section XI of the ASHE Boiler and Pressure Vessel Code applicable Edition and Addenda, except where specific written relief has been requested by the licensee and granted by the Commission pursuant to paragraphs (a)(3)(i), (a)(3)(ii), or (g)(6)(i) of 10 CFR 50.55a.
.A conference call was held with WPPSS apd our contractor, the Idaho National Engineering and Environmental Laboratory (INEEL) on March 11, 1997, to clarify the December 15,
- 1995, request related to reliefs other than an alternative to the 10 CFR 50.55a(g)(6)(ii)(A) augmented reactor pressure vessel examination.
WPPSS clarified that its submittal also included a number of American Society for Mechanical Engineers (ASHE) Boiler and Pressure Vessel
- Code,Section XI, Examination Category B-A, Item B1.21 and B1.22 welds.
Since 10 CFR 50.55a (g)(6)(ii) only addresses those welds specifically categorized as reactor pressure vessel (RPV) shell welds (Item 81.10),
the Item B1.21 and'1.22 welds are outside the scope of the augmented RPV examination.
WPPSS proposed to submit requests for relief for the 81.21 and B1.22 welds under 10 CFR 50.55a (g)(5)(iv) which will be evaluated separately.
NmtC II'IIILKCEIRR CSPV 1
970bi20028 970b05 PDR ADCICK 0500039'7 P
h,
(
Mr. J.
V. Parrish June 5,
1997 The staff has reviewed the WPPSS request and,determined that the proposed alternative augmented reactor pressure vessel examination is authorized pursuant to 10 CFR 50.55a(a)(3)(i ) and 10 CFR 50.55a(g)(6) (ii ) (A) in that the proposed alternative provides an acceptable level of quality and safety.
The basis for the staff's conclusions are contained in the enclosed safety evaluation.
If you have any questions, please contact me at (301) 415-1372 or Timothy G. Colburn at (301) 415-1341.
Sincerely, Original Signed By Docket No. 50-397
Enclosure:
Safety Evaluation cc w/encl:
See next page William H. Bateman, Director Project -Directorate IV-2 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation DISTRIBUTION:
Docket File PUBLIC*
PDIV-2 R/F JRoe EGA1 WBateman TColburn EPeyton ACRS OGC TMcLellan
- KPerkins, RIV/WCFO
- PGwynn, RIV
- HWong, RIV/WCFO MBiamonte GHill (2)
DOCUMENT NAME:
REL94322.WNP OFC PDIV-2 PM NAME TColburn:ye DATE 5 N/97 PDIV-2 LA OGC
~/VoL,c~
EPegto b<P7 5~/97 OFFICIAL RECORD COPY.
PDIV-2 WBatema
/
97
Hr. J.
V. Parrish dune 5, 1997 cc w/encl:
Nr. Greg 0. Smith (Hail Drop 927M)
WNP-2 Plant General Manager Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352-0968 Hr. Albert E. Houncer (Hail Drop 1396)
Chief Counsel Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352-0968 Hr. Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P. 0.
Box 43172 Olympia, Washington 98504-3172 Nr. David A. Swank (Nail Drop PE20)
- Manager, Regulatory Affairs Washington Public Power Supply System
, P.O.
Box 968
- Richland, Washington 99352-0968 Hr. Paul Inserra (Nail Drop PE20)
- Hanager, Licensing Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O.
Box 69
- Prosser, Washington 99350-0190 Hr. Rodney L. Webring (Hail Drop PE08)
Vice President, Operations Support/PIO
'ashington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352 Hr. Scott Boynton, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O.
Box 69
- Richland, Washington, 99352-0968 Hr. Perry D. Robinson, Esq.
Winston 8 Strawn 1400 L Street, N.W.
Washington, DC 20005-3502