)4 +6~4r~Jt u~VITco STATis UC LEAR R EGULATORY COriilhllSSION I
RecroA rv Ai4 r" Mgp parve sulr
<<Qo
~a<r~crovrex~s zeor: eo-~
MAY -5 be Mr. J. V. Parrish (Mail Drop 1023)
Chief Executive Officer Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968
SUBJECT:
SEMIANNUALPLANT PERFORMANCE REVIEW (SPPR)
- WASHINGTON NUCLEAR PLANT 2 (WNP-2)
Dear Mr. Parrish:
On March 25, 1997, the NRC staff completed the SPPR of WNP-2.
The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.
The results are used by NRC management to facilitate planning and allocation of inspection resources.
The SPPR for WNP.2 involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period from October 1, 1996, through March 1997.
SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance and Senior Management Meeting reviews.
This letter advises you of our planned inspection effort resulting from the WNP-2 SPPR review.
It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel, availability to be resolved in advance of inspector arrival onsite.
The enclosure details our inspection plan for the next 8 months.
The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.
Resident inspections are not listed due to their ongoing and continuous nature.
We will inform you of any changes to the inspection plan.
If you have any questions, please contact, Mr. Howard Wong at (510) 975-0296.
- Sincerel, omas P. Gwynn, Dir ctor Division of Reacto Pr lects Docket No.: 50-397 License No.:
Enclosure:
Inspection Plan 9705130055 970505 POR ADOCK 05000397 8
PDR LIILLLIlLIIIIILLLILIIIIIIIL LLXIILLLIL'11
Washington Public Power Supply System cc: w/enclosure Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-3172 Mr. Paul R. semis (Mail Drop PE20)
Vice President, Nuclear Operations Washington Public Power Supp'ly System P.O. Box 968 Richland, Washington 99352-0968 Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. David A. Swank (Mail Drop PE20)
Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Al E. Mouncer (Mail Drop 396)
Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Ms. Lourdes C. Fernandez (Mail Drop PE20)
Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968
Washington Public Power Supply System Mr. Malcolm H. Phillips, Jr., Esq.
Winston & Strawn 1400 L Street, N.W.
Washington, D.C, 20005-3502
Washington Public Power Supply System MAY -5 l997 bcc to DCD (IE01) bcc distrib. by RIV:
Regional Administrator DRP Director Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File T. Colburn, NRR Resident 'nspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)
DOCUMENT NAME: G:iDRPDIRiSPPRtWNP. LTR To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy C: DRPttE HJWong;cm 04/24/97 (8JO)
D:DRS ATHo e
0
/97 D:DRP TPGwyn 0
/y /97 OFFICIAL RECORD COPY
Washington Public Power Supply System
.4.
>VY -5:997 bcc to DCD (IE01) bcc distrib. by RIV:
Regional Administrator DRP D:,ector Branch Chief (DRP/E, WCFO)
Senior Proje c t In spec tor (DR P/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File T. Colburn, NRR Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)
DOCUMENT NAME: G:tDRPDIRtSPPR>WNP.LTR To receive copy of docurnen, indicate in box: "C" = Copy without enciosures "E" = Copy with enclosures "N" = No copy C:DRPiE HJWong;cm 04/24/97 (BJO)
D:DRS ATHo e
0,/97 D:DRP TPGwyn 0 Q/97 OFFICIAL RECORD COPY
WNP-2 INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)
INSPECTION TITLE/
PROGRAM AREA NUMBER OF INSPECTORS DATES TYPE OF INSPECTION/COMMENTS IP 73763 Inservice Inspection 04/21-25/97 Core Inspection Tl 132 Malevolent Use of Vehicles at Nuclear Power Plants 04/21-25/97 Temporary Instruction IP 81700 Physical Security Program IP 83750 Occupational Radiation Exposure 08/25-29/97 Core Inspection 10/20-24/97 Core Inspection