ML17292A445
| ML17292A445 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/12/1996 |
| From: | Brockman K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17292A446 | List: |
| References | |
| NUDOCS 9609170390 | |
| Download: ML17292A445 (7) | |
See also: IR 05000397/1996020
Text
C~J Z eve.l
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9609170390
DOC.DATE: 96/09/12
NOTARIZED: NO
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe
UTH.NAME
AUTHOR AFFILIATION
OCKMAN,K.E.
Region
4 (Post
820201)
ECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
DOCKET ¹
05000397
SUBJECT:
Forwards insp rept 50-397/96-20
on 960903-06.No violations
noted.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTR
l
ENCL
l
SIZE: 5
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
AEOD/~C~
FILE CENTER+
NRR/DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
RNAL: LITCO BRYCE,J
H
NRC
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
COLBURNIT
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL >>RIDSN RECIPIENTS
PLEASE HELP US
TO REDUCE WASTEI
CONTACT THE DOCUMENT CONTROL DESK,
ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM
DISTRIBUTION LISTS
FOR
DOCUMENTS YOU DON'T NEEDI
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
I 2 r996
J. V. Parrish, Chief Executive Officer
Washington Public Power Supply System
3000 George Washington Way
P.O. Box 968, MD 1023
Richland, Washington
99352
SUBJECT:
NRC INSPECTION REPORT 50-397/96-20
Dear Mr. Parrish:
An NRC inspection was conducted September 3-6, 1996, at your Washington Nuclear
Project-2 reactor facility. The enclosed report presents the scope and results of that
inspection.
This inspection consisted of documentation reviews and discussions with plant personnel
associated with the Inservice Inspection Program.
Our results indicate that your Inservice
Inspection Program continued to be a well implemented program.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of this letter
and its enclosure will be placed in the NRC Public Document Room tPDR).
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
-c'<
ennetN
rockman, Acting Director
Division of Reactor Safety
Docket No.: 50-397
License No.:
Enclosure:
NRC Inspection Report
50-397/96-20
Pb0'71703'PO
9b0912
ADQCK 05000397
6
Washington Public Power Supply System
-2-
cc w/enclosure:
Frederick S. Adair, Chairman
Energy Facility Site Evaluation Council
P.O. Box 43172
Olympia, Washington
98504-3172
Chairman
Benton County Board of Commissioners
P.O. Box 69
Prosser, Washington
99350-0190
Mr. Paul R. Bemis (Mail Drop PE20)
Vice President,
Nuclear Operations
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. David A. Swank (Mail Drop PE20)
Manager, Regulatory Affairs
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Al E. Mouncer (Mail Drop 396)
Chief Counsel
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Washington Public Power Supply System
-3-
Ms. Lourdes C. Fernandez
(Mail Drop PE20)
Manager, Licensing
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Malcolm H. Phillips, Jr., Esq.
Winston 5 Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
Washington Public Power Supply System
-4-
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
bcc to DMB (IE01)
bcc distrib. by RIV;
Resident Inspector
L. J. Callan
DRP Director
Branch Chief (DRP/E, WCFO)
MIS System
Senior Project Inspector (DRP/E, WCFO)
RIV File
Branch Chief (DRP/TSS)
M. Hammond (PAO, WCFO)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
DOCUMENT NAME: R:t WN2tWN620RP.CJP
To receive copy of document,
indicate in box: "C""-Copy without enclosures
"E" = Copy with enciosures "N" = No copy
RIV:RI'MB
CJPaulk/Imb
09//g/96
C:PBE
C:MB
E
DAPowers
09//2C96
FRHu
09@/
6
OFFICIAL RECORD COPY
AD:DRS
KEBrockman
{
09/~6
Washington Public Power Supply System
-4-
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
bcc to DMB (IE01)
bcc distrib. by RIV:
Resident Inspector
L. J. Callan
DRP Director
Branch Chief (DRP/E, WCFO)
MIS System
Senior Project Inspector (DRP/E, WCFO)
RIV File
Branch Chief (DRP/TSS)
M. Hammond (PAO, WCFO)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
DOCUMENT NAME: R:i WN2iWN620RP.CJP
To receive copy of document,
indicate In box: "C" = Copy without enclosures
"E" = Copy with enclosures
"N" = No copy
RIV:RI:MB
CJPaulk/Imb
C:MB
E
C:PBE
DAPowers
/ '(-
FRHu
AD:DRS
KEBrockman ]
09//gl96
09@/
6
09//?/96
OFFICIAL RECORD COPY
09/
6