ML17292A291
| ML17292A291 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/31/1996 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17292A292 | List: |
| References | |
| NUDOCS 9606100130 | |
| Download: ML17292A291 (6) | |
See also: IR 05000397/1996005
Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR:9606100130
DOC.DATE: 96/05/31
NOTARIZED: NO
DOCKET
CIL:50-397
WPPSS Nuclear Project, Unit 2, Washington Public
Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
GWYNNgT.P.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
SUBJECT: Forwards insp rept 50-397/96-05
on 960506-09.No violations
noted.
DISTRIBUTION CODE:
IE06D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: Environ
S Radiological
(50 DKT)-Insp Rept/Notice of Violation
NOTES:
A
Respons
T
E
INTERNAL:
RECIPIENT
ID CODE/NAME
PD4-2
S
LE CE
ER
DREAM PERB
OE DIR
RGN4
FILE
01
COPIES
LTTR ENCL
1
1
2
'
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
COLBURN,T
AEOD/TTC
NRR/DISP/PIPB
NUDOCS-ABSTRACT
OGC/HDS3
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
EXTERNAL: NOAC
1
'
NRC
D
E
N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US
TO REDUCE
WASTETH
CONTACT THE DOCUMENT CONTROL DESK,
TO ELIMINATE YOUR NAME FROM
DISTRIBUTION LISTS
FOR
DOCUMENTS YOU DON'T NEEDI
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
14
ENCL
14
~p,a @fop
>A
'Ip0
>>>>*44
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
MAY 3
) S98
Washington Public Power Supply System
ATTN:
J.
V. Parrish,
Chief Executive
Officer
3000 George Washington
Way
P.O.
Box 968.
MD 1023
Richland,
99352
SUBJECT:
NRC INSPECTION REPORT 50-397/96-05
This refers to the inspection
conducted
by Mr. L. T. Ricketson of this office
on May 6-9,
1996, at the Washington Nuclear Project-2 facility.
The purpose
of the inspection
was to determine whether activities authorized
by the
license were conducted safely and in accordance
with NRC requirements.
At the
conclusion of the inspection,
the findings were discussed
with those
members
of your staff identified in the enclosed
report.
Areas
examined during the inspection are identified in the report.
Within
these areas'he
inspection consisted of selective
examinations of procedures
and representative
records.
interviews with personnel.
and observation of
activities in progress.
The results of this inspection are documented
in the
enclosed
report.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice."
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspections
we will be pleased
to discuss
them with you.
Sincerely,
Docket:
50-397
License:
Enclosure:
NRC Inspection Report
50-397/96-05
w/attachment
homas
.
Cw
, Director
Divi ion of Reactor Safety
9606i00130 96053i
ADOCK 050003'P7
6
Washington Public Power Supply
System
-2-
cc w/enclosure:
Washington Public
Power
Supply System
ATTN:
J.
H.
Swai les,
WNP-2 Plant Manager
P.O.
Box 968,
MD 927M
Richland.
99352-0968
Washington Public Power Supply System
ATTN:
Chief Counsel
3000 George Washington
Way
P.O.
Box 968,
MD 396
Richland,
99352-0968
Energy Faci lity Site Evaluation Council
ATTN:
Frederick
S. Adair, Chairman
P.O.
Box 43172
Olympia, Washington
98504-3172
Washington Public Power Supply System
ATTN:
D. A. Swank.
WNP-2 Licensing Manager
P.O.
Box 968 (Mail Drop PE20)
Richland'ashington
99352-0968
Washington Public
Power
Supply System
ATTN:
P.
R.
Bemis, Director
Regulatory
and Industry Affairs
P.O.
Box 968 (Mail Drop PE20)
Richland,
99352-0968
Benton County Board of Commissioners
,ATTN:
Chairman
P.O.
Box 190
Prosser,
99350-0190
Winston
8 Strawn
ATTN:
M. H.
Phi lips.
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
Washington Public
Power Supply
System
E-Hail report to D. Nelson
(DJN)
E-Hail report to NRR Event Tracking System
(IPAS)
E-Mail report to Michael J.
Davis
(HJD1)
bcc to
DMB (IE06)
bcc distrib. by RIV:
L. J. Callan
DRP Director
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB, HS:
TWFN 9E10)
Resident
Inspector
DRS-PSB
HIS System
RIV File
H.
Hammond
(PAO,
WCFO)
R. Wise,
RAO
DOCUMENT NAME:
R:KWNP605RP.LTR
- Previously concurred
To receive copy of document, indicate In box: "C" = Copy w'hout enciosures
"E" = Copy with enciosures "N" ~ No copy
SRS:PSB
C:PSB
D:DR
N
PBE:DRP
E
D:DRS
N
LTRicketson.
05/4
/96
05/
96
05/
/96
BMurray
TPGwynn
HWon
05/34 /96
TPGwyn
05
/
Washington Public Power Supply
,
System
-3-
E-Hail report to D. Nelson
(DJN)
E-Hail report to NRR Event Tracking System
(IPAS)
E-Mail report to Michael J.
Davis
(HJD1)
bcc'"to'HB '( IE06)
bcc distrib. by RIV:
L. J. Callan
DRP Director
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB,
MS:
WCFO)
9E10)
Resident
Inspector
DRS-PSB
MIS System
RIV File
M.
Hammond
(PAO,
WCFO)
R. Wise,
RAO
DOCOHENT NAME:
R:~WNP605RP.LTR
- Previously concurred
To recehre copy of document, indicate In box: "C" = Copy wi hout encjosures
"E" ~ Copy with enclosures "N" ~ No copy
SRS:PSB
C: PSB
D:DR
N
PBE:DRP
E
D:DRS
N
LTRicketson-.
05/"~/96
BHurray
05/
/96
TPGwynn
05/
96
05/>> /96
05
/
HWong
y
TPGwyn