Forwards Insp Rept 50-397/96-03 on 960218-0330 & Notice of Violation
ML17292A211
Person / Time
Site: Columbia 
Issue date: 05/09/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17292A212 List:
References
NUDOCS 9605150131
Download: ML17292A211 (6)


See also: IR 05000397/1996003

Text

"5

1

~qq qEcy~

QC

~o

n

+**4+

UNITEO STATES

NUCLEAR REGULATORY COMMISSION

H

REGION IV

611 RYAN PLAZA ORIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

MAY

9

l996

Washington Public

Power Supply System

ATTN:

J.

V. Parrish,

Chief Executive

Officer

3000 George

Washington

Way

P.O.

Box 968,

HD 1023

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION

REPORT 50-397/96-03

AND NOTICE OF VIOLATION

Dear Hr. Parrish:

On Harch 30,

1996,

the

NRC completed

an inspection at your Washington Nuclear

Project-2 facility.

The enclosed

report presents

the results of that

inspection.

During the 6-week period covered

by this inspection period, your conduct of

activities at the Washington Nuclear Project-2 facility was generally

characterized

by improved coordination during plant shut

down, appropriate

performance of maintenance

and surveillance activities,

some

weaknesses

in

updating the safety analysis report for long standing facility changes,

and

evidence of efforts to reduce

personnel

dose

by system flushes

and temporary

shielding.

Compared to previous reactor

shutdowns,

the conduct of the reactor

shutdown

this inspection

period

was generally better coordinated;

however,

some

weaknesses

were identified with procedural

adherence

and usage.

Additionally,

the inspectors

identified instances

during the shutdown

where operators

did

not question

the cause of alarms

and appeared

to have

an inadequate

understanding

of the alarms

and

some plant equipment

operations

We are concerned

about

two violations of NRC requirements

that were

identified.

In the first instance,

NRC inspectors

identified that operators

Failed to assure

that

a Technical Specification required chemistry

sample of

the reactor coolant

system

was taken during the shutdown process.

In the

second

instance,

NRC inspectors

identified two examples of a failure to

promptly document potentially safety-significant

problems.

These violations

are cited in the enclosed

Notice of Violation, and the circumstances

surrounding

them are described

in detail

in the enclosed

report.

Please

note

that you are required to respond to Violation A of this letter,

should follow

the instructions specified

in .the enclosed

Notice when preparing your

response,

and are not required to respond

to Violation B.

The

NRC will use

your response,

in part, to determine

whether further enforcement

action is

necessary

to ensure

compliance with regulatory requirements.

9605150131

960509

PDR

ADOCK 05000397

8

PDR

Washington Public

Power

Supply System

In accordance

with 10

CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

Sincerely,

Docket;

50-397

License:

NPF-21

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

50-397/96-03

J.

E. Dyer, Director

Division of Reactor Projects

cc w/enclosures:

Washington Public Power Supply System

ATTN:

G. 0. Smith,

WNP-2 Plant Manager

P.O.

Box 968,

MD 927H

Richland,

Washington

99352-0968

Washington Public

Power Supply System

ATTN:

Chief Counsel

3000 George

Washington

Way

P.O.

Box 968,

MD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington Public Power Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Manager

P.O.

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

P.

R. Bemis, Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Washington Public

Power

Supply System

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Winston

& Strawn

ATTN:

M. H. Philips,

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

Washington Public Power

Supply System

MAY

9

I996

E-Hail report to D. Nelson

(OJN)

E-Hail report to

NRR Event Tracking System

(IPAS)

E-Hail report to H. Davis

(MJD1)

bcc to

OHB ( IEOI) >

bcc distrib.

by RIV:

L. J. Callan

ORP Director

Branch Chief (ORP/E,

WCFO)

Senior Project Inspector

(ORP/E,

WCFC)

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

Resident

Inspector

DRS-PSB

HIS System

RIV File

H.

Hammond

(PAO,

WCFO)

140009

DOCUMENT NAME:

R:i WN2iWN603RP. RCB

To rccciva copy cf document, indicate in

cro "C" ~ Copy without enclosures

"E" ~ Copy with enclosures

ff" ~ No copy

C:DRP/E

KJWon

/96

D 4" FO

KEP

kins

4/

/

D:DRP

JEDyer

/

/96

Washington Public

Power

Supply System

MAY

9 l996

E-Hail report to D. Nelson

(DJN)

E-Mail report to

NRR Event Tracking System

(IPAS)

E-Hail report to H. Davis

(HJD1)

bcc to

DHB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRP Director

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

Resident

Inspector

DRS-PSB

HIS System

RIV File

H.

Hammond

(PAO,

WCFO)

DOCUMENT NAME:

R:i WN2ttWN603RP.RCB

To receive copy cf document, indicate in oe

C

~ Copy without enclosures

E" ~ Copy with enclosures

tt" ~ No copy

C:DRP/E

HJWon

/96

D:

FO

KEP

kins

4/ /

D:DRP

JEDyer

/

/96

n.

~

~

~

o'4