Advises of Planned Insp Effort Resulting from Util PPR Review.Provides Minimized Resource Impact on Staff & Allows for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector Arrival Onsite
ML17291B289
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/03/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9604080143
Download: ML17291B289 (5)


Text

~a RECT

+

/p %p*g4 i

UNITEDSTATES NUCLEAR REGULATORY COMIVIISSION R EG ID N IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTDN,TEXAS 76011 6064 APR -3 l996 Washington Public Power Supply System ATTN:

J.

V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.

Box 968, MD 1023

Richland, Washington 99352

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - WASHINGTON NUCLEAR POWER STATION On March 11,

1996, the NRC staff completed the semiannual PPR of Washington Nuclear Power Station.

The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.

The results are used by NRC management to facilitate planning and allocation of inspection resources.

The PPR for Washington Nuclear Power Station involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period September 15, 1995, to March 15, 1996.

PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Washington Public Power Station PPR review.

It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite.

The enclosure details our inspection plan fo} the next 8 months.

The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.

Resident inspections are not listed due to their ongoing 'and continuous nature.

We will inform you of any changes to the inspection plan.

If you have any questions, please contact Howard Wong at 510/975-0296.

Sincerely, Docket:

50-397 License:

NPF-21 J.

E. Dyer, Director Division of Reactor Projects

Enclosure:

Inspection Plan 9b04080i43 9b0403 PDR ADQCK 05000397 6

PDR

Washington Public Power Supply System CC:

Washington Public Power Supply System ATTN:

J.

H. Swailes, WNP-2 Plant Manager P.O.

Box 968, MD 927M

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

Chief Counsel 3000 George Washington Way P.O.

Box 968, MD 396

Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.

Box 43172 Olympia, Washington 98504-3172 Washington Public Power Supply System ATTN:

D. A. Swank, WNP-2 Licensing Manager P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

P.

R. Bemis, Director Regulatory and Industry Affairs P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190

Prosser, Washington 99350-0190 Winston

& Strawn ATTN:

H.

H. Philips, Esq.

l400 L Street, N.W.

Washington, D.C.

20005-3502

Washington Public Power Supply System apR -3 896 bcc to DMB ( IE01) bcc distrib.

by RIV:

L. J. Callan DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

Resident Inspector DRS-PSB MIS System RIV File M.

Hammond (PAO, WCFO)

DOCUMENT NAME:

G: iDRPDIRiSPPR~tLTR96. WNP To receive copy ot docgncnt, indicate in bcr. "C" ~ Copy without enclosures "E" ~ Copy with enclosures ff

~ No copy RIV:C:DRP HJWon ;df 3/

/96 D:DRP JEDyer

/

/96 080038

Washington Public Power Supply System APR -3 l996 bcc to DHB

( IE01) bcc distrib.

by RIV:

L. J. Callan DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (ORP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFOCB, NS:

TWFN 9E10)

Resident Inspector ORS-PSB HIS System RIV File M.

Hammond (PAO, WCFO)

DOCUMENT NAME:

G: iORPDIRiSPPRiLTR96. WNP To receive copy of docunent, I

icete inborn C" ~ Copy without enclosures "E" ~ Copywith enclosures "it

~ No copy RIV:C:DRP D:DRP HJWon ;df 3/

/96 JEDyer

/

/96

WASHINGTON NUCLEAR POWER STATION INSPECTION PLAN IP Inspection Procedure TI - Temporary Instruction Core Inspection Minimum NRC Inspection Program (mandatory all plants)

INSPECTION IP83750 IP84750 IP37550 IP81700 IP82701 If'82301 IP71001 TITLE/

PROGRAM AREA Occupational Radiation Exposure Radioactive Waste Treatment and Effluent and Environmental Honitoring Engineering and Technical Support Physical Security Program for Power Reactors Operational Status of Emergency Preparedness Program Evaluation of Exercises for Power Reactors Licensed Operator Requalification Program Evaluation NUMBER OF INSPECTORS PLANNED INSPECTION DATES 6/24-28/96 6/24-28/96 7/8-12/96 7/22-26/96 7/8-12/96 7/29-8/2/96 9/23-27/96 11/13-15/96 Core Core Core Core Core Core Core TYPE OF INSPECTION CONTENTS