|
---|
Category:DRAWINGS
MONTHYEARML20262G8021994-11-22022 November 1994 WNP-2 Inservice Ispection Boundary Diagram Main Steam (Ms) & Reactor Feedwater (RFW) ML20262G7151994-11-22022 November 1994 WNP-2 Inservice Inspection Boundary Diagram Standby Service Water (SW) ML20262G7101994-11-22022 November 1994 WNP-2 Inservice Inspection Boundary Diagram Standby Service Water (SW) ML20262G7351994-11-22022 November 1994 WNP-2 Inservice Inspection Boundary Diagram Standby Service Water (SW) ML20262G7051994-11-22022 November 1994 WNP-2 Inservice Inspection Boundary Diagram Reactor Water Clean Up (RWCU) ML20262G7381994-11-22022 November 1994 WNP-2 Inservice Inspection Boundary Diagram Standby Service Water (SW) ML20262G7411994-11-22022 November 1994 WNP-2 Inservice Inspection Boundary Diagram Standby Service Water (SW) ML20262G7471994-11-22022 November 1994 WNP-2 Inservice Inspection Boundary Diagram Standby Service Water (SW) ML20262G7441994-11-22022 November 1994 WNP-2 Inservice Inspection Boundary Diagram Standby Service Water (SW) ML20262G7011994-11-22022 November 1994 WNP-2 Inservice Inspection Boundary Diagram Reactor Water Clean Up (RWCU) ML20262G7241994-11-22022 November 1994 WNP-2 Inservice Inspection Boundary Diagram Standby Service Water (SW) ML20262G7311994-11-22022 November 1994 WNP-2 Inservice Inspection Boundary Diagram Standby Service Water (SW) ML20262G6571994-11-22022 November 1994 WNP-2 Inservice Inspection Boundary Diagram Miscellaneous Containment Penetrations ML20262G7271994-11-22022 November 1994 WNP-2 Inservice Inspection Boundary Diagram Standby Service Water (SW) ML20262G7201994-11-22022 November 1994 WNP-2 Inservice Inspection Boundary Diagram Standby Service Water (SW) ML20262G7511994-11-22022 November 1994 WNP-2 Inservice Inspection Boundary Diagram Standby Service Water (SW) ML17291B2851994-06-10010 June 1994 Main One Line Diagram.Sheet 1 of 4 ML20262G6971994-06-0808 June 1994 Inservice Inspection Boundary Diagram Standby Liquid Control (SLC) ML20262G7901994-06-0808 June 1994 WNP-2 Inservice Inspection Boundary Diagram Main Steam (Ms) & Reactor Feedwater (RFW) ML20262G7831994-06-0808 June 1994 WNP-2 Inservice Inspection Boundary Diagram Main Steam (Ms) & Reactor Feedwater (RFW) ML20262G6851994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Residual Heat Removal (RHR) ML20262G8161994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Reactor Recirculation (RRC) ML20262G7711994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Fuel Pool Cooling (FPC) ML20262G6721994-06-0707 June 1994 Inservice Inspection Boundary Diagram High Pressure Core Spray (HPC5) LOW Pressure Core Spray (LPC5) ML20262G7681994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Fuel Pool Cooling (FPC) ML20262G8121994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Reactor Recirculation (RRC) ML20262G6781994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Residual Heat Removal (RHR) ML20262G8091994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Reactor Recirculation (RRC) ML20262G7981994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Main Steam (Ms) & Reactor Feedwater (RFW) ML20262G6881994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Residual Heat Removal (RHR) ML20262G7561994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Reactor Closed Cooling (RCC) ML20262G7601994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Reactor Closed Cooling (RCC) ML20262G8051994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Main Steam (Ms) & Reactor Feedwater (RFW) ML20262G7941994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Main Steam (Ms) & Reactor Feedwater (RFW) ML20262G6811994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Residual Heat Removal (RHR) ML20262G7641994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Reactor Closed Cooling (RCC) ML20262G6921994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Residual Heat Removal (RHR) ML20262G7751994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Fuel Pool Cooling (FPC) ML20262G7791994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Control Rod Drive (CRD) ML20262G7541994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Reactor Closed Cooling (RCC) ML20262G8191994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Emergency Chilled Water (Cch) ML20262G6751994-06-0707 June 1994 WNP-2 Inservice Inspection Boundary Diagram Residual Heat Removal (RHR) ML20262G6691994-06-0707 June 1994 Inservice Inspection Boundary Diagram High Pressure Core Spray (HPC5) LOW Pressure Core Spray (LPC5) ML20262G6611993-10-17017 October 1993 WNP-2 Inservice Inspection Boundary Diagram Reactor Core Isolation Cooling (RCIC) ML20262G6651993-10-13013 October 1993 WNP-2 Inservice Inspection Boundary Diagram Reactor Core Isolation Cooling (RCIC) ML17291B2861991-04-26026 April 1991 Main One Line Supply System.Sheet 4 of 4 ML17285A3041988-08-25025 August 1988 Flow Diagram:Containment Instrument Air Sys. Sheet 1 of 2 ML17285A3051988-08-25025 August 1988 Flow Diagram:Containment Instrument Air Sys. Sheet 2 of 2 ML17279A8121988-02-0808 February 1988 Embedded Piping Floor Equipment & Misc Drains Reactor Bldg Plan El 572 Ft. Rev Date Illegible ML17279A8281987-10-0202 October 1987 Electrical Wiring Diagram Residual Heat Removal System MOV RHR-V-8 (E12-F008) 1994-06-08
[Table view] |
Text
'4
'12 10 8
6 3
2-NOTES FOR GENERAL NOTES SEE DWG E502, SH.1.
TO 6.9 KV SWGR SH-5 BRKR RRA SEE DWG E502, SH.1 TO 6.9 KV SWGR SH6 BRKR RRB SEE DWG E502, SH.1 2.
THE QUALITY CLASS OF THE ELECTRICAL INSTALLATION WORK WITHIN THE THE ENCLOSURE OR EQUIPMENT SHALL BE THE SAME AS THE MASTER EQUIPMENT LIST (MEL) QUALITY CLASS OF THE ENCLOSURE OR EQUIPMENT FOR ALL SUCH INSTALLATIONS AFTER JANUARY 1, 1989.
3.
FOR OTHER ELECTRICAL SYMBOLS, SEE DRAWING E501, SH1.
063 REACTOR RECIRC ADJUSTABLE SPEED DRIVE INPUT TRANSFORMER TR-ASD 1
11,700 KVA, OA, 55'C Z=BP',
3(S, 60Hz 7,200 4,400
- VOLTS, TAP k(2)2.5P'3 REACTOR RECIRC ADJUSTABLE GDEED DRIVE INPUT TRANSFORMER TRASD =/1 11,700 KVA, OA, 55 C Z=BF.,
3(s, 60Hz 7,200 4,400
- VOLTS, TAP + (2) 2.570 ASD/1A/1 4.16 KV SWGR SMASD1A 9
)
- 311, 3w, 1200A J
(ASD
- BLDG, EL 441'-Ct")
ASD/2A/1 T
4.16 KV SWGR SM-ASD1A 9
)
31, 3w, 1200A (ASD
- BLDG, EL 441' 0")
ASD/1B/1 4.16 KV SWGR SMASD18 3W, 1200A (ASD
- BLDG, EL 441'-0 )
ASD/2B/1 4.16 KU SWGR SMASD1B l
3((),
3W, 1 200A (ASD
- BLDG, EL 441'-0")
1000-1 1000-1 2
'I 000-1 2
1000-1 SOURCE BRIDGE 838A DC DC INK REACTOR 9
X 2 MHY 26 1400A DC OOP A
CHANNEL 1
SIGNAL ISTRIBUTION BOARD SOU~ROE BRIDG 838A DC DC INK REACTOR 9
X 2 MHY 26 1400A DC LOOP A
CHANNE 2
S GNAL DISTRIBUTION BOARD SOURCE BR DG 838A DC DC LINK REACTOR 9
X 2
MHY (26 1400A DC LOOP 8
CHANNEL 1
SIGNAL DISTRIBUTION BOARD SOURCE BRIDG 838A DC DC LINK REACTOR 9
X 2 MHY 26 1400A DC SI NA DISTRIBUTION LOOP B
CHANNEL BOARD
~OAD BRIDGE 654A AC 1 000 1 LOAD BRIDGE 654A AC 1000 1 LOAD BRIDGE 654A AC 1 000 1 LOAD BRIDGE 654A AC 1000-1 2
RES 2Q X 2490 5
MO 778MFD ASD/1A/2 RES 4.16 KV SWGR SM-ASD IA T
3(B, 3W, 1200A (ASD
- BLDG, EL 441'-D )
0 50 G
RES 20 X 249Q 5
MD 776MTD ASD/2A/2 f<ES 8
à 3QQQ. Q 4.16 KV SWGR SMASD1A T
3(s, 3W, 1 200A (ASD
- BLDG, EL 441'-0")
REACTOR IA'ECIRC ADJUSTABLE SPEED DRIVE OUTPUT TRANSFORMER TR-ASD 2
9,600 KVA, OA, 55'C 2=127,,
3(S, 66Hz 3,800-7,200
- VOLTS, RES 2Q X 249Q 5
MO 778MFD ASD/1 B/2 RES 4.16 KV SWGR SMASD18 3((),
3W, 1200A (ASD
- BLDG, EL 441' 0 )
063 50 G
778MFQ ASD/2B/2 RES 8
X 3QQQ 4.16 KV SWGR SM-ASD18 T
3((),
3W, 1200A (ASD
- BLDG, EL 441'-0
)
RES 20 X 249Q 5
MO REACTOR RECIRC ADJUSTAB SPEED DRIV OUTPUT TRANSFORMER TR-ASDFB 2 9,600 KVA, OA, 55 C 2=127.,
3E),
66Hz 3,800-7,200
- VOLTS, LEGEND:
SURGE SUPPRESSOR MOTOR FILTER METAL OXIDE VARISTOR (MOV)
SOURCE OR LOAD ANALOG ATTENUATOR CONVERTER THYRISTOR INVERTER THYRISTOR F
RES 210 Q
21A 1000-5 1000-5 87 RRA A
SH-5 AUX PNL 3
50 AS 51 TRD W
RES 210 Q
21A 1000-5 1 000-5 87 RRB 3
50 51
.6 SH-6 AUX PNL TRD W
RPT3A (DUAL TRIP)
DIV.1 6.9KV SWGR SH 9 3(B 3W 1 200A C3 P602 RPT4A (DUAL TRIP)
DIV.2 6.9KV SWGR SH-11 3(()
3W 1 200A (REACTOR
- BLDG, J.)
EL 471'-0 )
(REACTOR
- BLDG, EL 471' 0 )
SH-5 SH-5 AUX PNL AUX PNL CI P602 V
CI P602 CI P602 TRD F
CI P602 C3 P602 RPT3B (DUAL TRIP)
DIV.1 6.9KV SWGR SH-10 3(B 3W 1 200A CI P602 RPT4B (DUAL TRIP)
DIV.2 6.9KV SWGR SH-12 3(S 3W 1 2 00A (REACTOR
- BLDG, T
EL 471'-0")
(REACTOR
- BLDG, T
EL 471 '- 0" )
SH 6 AUX PNL SH-6 Ci P602 AUX PNL V
Q3 P602 I3 P602 TRD F
I3 P602 0 P602 CI P602 3PT'S D.SA 4200-120V 6A 2PT'S 208-120V 47 6 B35-P001A 0 P602 3PT'S D.SA 4200-120V 6A 2PT'S 208-120V 47 B35-P001B 59V SH-5, AUX PNL 59V
/H SH-6, AUX PNL EPAX1 03A EPA-X-105A 81 SH-5, AUX PNL EPA-X-1 03C EPA-X-105B 81 SH-6, AUX PNL O'EC 6
62W 4, CQQQ MAIN THREE LINE DIAGRAM REF DWG DESCRIPTION ELECTRICAL SYMBOL LIST PHASING DIAGRAM RELAY SETI'INGS G.E.
INDUCTION MOTOR DRIVE E514 6501 Cvi 767-00,62 CVI 767-00,118 E506 6507 G.E.
INSTRUMENT 8c ELEC DIAG IED LOOP A
REACTOR RECIRC PUMP DRIVE MOTOR RRC-M-P 1A B35-C001A 8900 HP LOOP B
REACTOR RECIRC PUMP DRIVE MOTOR RRC MP 1B B35-C001B 8900 HP 1000-5 1000 5 PER SPC 87-c zan -o6
- FSA.F FjC MO.
8 I'-'9D 6
e DESIGN RELEASED BY 87 0244-06 253 BURNS AND; ROE, INC.
ENGINEERS AND CONSTRUCTORS ORADELL, N. J.
HEMPSTEAD, N. Y.
LOS ANGELES, CALIF.
DATE:
7 8
PAGE C)SUPERCEDES (REPLACES)
O REVISES N/A PREPARED BY:
Fb. IAS/AII CHECKED BY:
/f3 1 boo'o3e t s 0 MAIN ONE LINE DIAGRAM SH. /4 OF 4
WASHINGTON PUBLIC POWER SUPPLY SYSTEM HANFORD No. 2 DA'TE DESCRIPT)ON
/g/
REV. PER 55-138 3- (7A-3D 3 (CD/7)
DWIAI CHK 3
F'LEY I Sl C) N JK 3040E PED.2.IB.E.3I53 (K 4, K. I I )
- S.U.
SY TRANSFERRED TO SUPPLY SYSTEM PERt IW 0
- 4300, NEMO 971265 APVD RE(F.)v DA1 E DRW CHKP 9.IO 81 I3M 8-19.
Ilp TEM PER )I/I S.U.
SYSTEM: S TRANSFERRED I4.0. 4300, MEND EN -
2,
AIAPPFLOA/EO EDICA'R PP.
J i7ATE REV. NO.
REVISION RACF ZI6:
DRAWIIJ GVED POP C( kl5TRUCTIGhL COIAiTRACl '2I9'.
ADDED. B8R EQUIPT' IGMS ZOMBIES J-IO,J-4 4 C.
IC3(D ZO I-I~ I Fr
. H Fk DI
'oa V NC3 B. Y-SW
( SH=I2 (PCM 474-C))
DATE DRWN.
CHKD.
9-IO )IT KES HB II-IO.
APPR OVED EDD;TE lo-IB-TT ENG'R N \\I RELEASED FOR STATUS PRELIMINARY INFO.
BIDDING ONLY ADDENDUM NO, AMENDMENT NO.
C 0 N 5 T R U C T I0 N APPLY TO SPEC.
NO.
DATE ENGINEERING REVIEW I.
ELECT SVIINBT. NE)C, DIVISION ENG'R DATE 7%// 27 o-la.n AP OV FOR CO TRUCTIQIL/
C' I
WLL ZTFJCFML ENGINEER
. /I/T,f.
OIV/r
(/ c.
- k. r CLIENT APPROVAL SCALE: gONE DRWN.RECRUEE ILDE CI,CAI4 CHER.
DATE 9-I(ED 77 k)C /Err~ /FAPI/7/
REVIEWEd SY C/IEF DRAFTSMAN W. 0. 2808 owG.
E502 e
14 10
~ NRl-DPI t iElE