Notice of Consideration of Issuance of Amend to License NPF-21 & Proposed NSHC Determination & Opportunity for Hearing.Amend Modifies WNP-2 TSs to Reflect Replacement of Existing RRC Flow Control Sys W/Adjustable Speed Drive Sys
ML17291B239
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/27/1996
From: Clifford J
NRC (Affiliation Not Assigned)
To:
Shared Package
ML17291B240 List:
References
NUDOCS 9602290267
Download: ML17291B239 (7)


Text

7590-01 UN TED S AT S NUC S

NGTO C

P S

GU TO OMM S 0

0 C

0 CO S

D T ON S

ANC CI OP G

C NS D

0 TUN The V.S. Nuclear Regulatory Commission (the Commission) is considering issuance of an amendment to Facility Operating License No. NPF-21, issued to the Washington Public Power Supply System (the Supply System, or the licensee),

for operation of the MPPSS Nuclear Project No. 2, located in Benton County, Mashington.

The proposed amendment would modify the technical specifications (TS) to reflect replacement of the existing reactor recirculation (RRC) flow control system with an adjustable speed drive (ASD) system.

The current system relies on operation of the RRC pumps at two discrete

speeds, using flow control valves to vary the flow in the RRC system.

Following the design

change, the flow control valves and the existing pump controllers would be deactivated in place.

The existing analog-hydraulic flow control system will be replaced with dual channel, variable frequency ASDs and a digital recirculation flow control system that would vary RRC flow by varying RRC pump speed.

The proposed TS changes would reflect the new RRC flow control system.

Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations.

9602290267 960227 PDR ADQCK 05000397 P

PDR I

I

By March 29, 1996

, the licensee may file a request for a hearing with respect to issuance of the amendment to the subject facility operating license and any per son whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request for a hearing and a petition for leave to intervene.

Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's "Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part 2.

Interested persons should consult a current copy of 10 CFR 2.714 which is available at the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, and at the local public document room located at the Richland Public Library, 955 Northgate Street,

Richland, Washington 99352.

If a request for a hearing or petition for leave to intervene is filed by the above date, the Commission or an Atomic Safety and Licensing Board, designated.

by the Commission or by the Chairman of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the designated Atomic Safety and Licensing Board will issue a notice of hearing or an appropriate order.

As required by 10 CFR 2.714, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding.

The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following factors:

(I) the nature of the petitioner's right under the Act to be made a party to the proceeding; (2) the nature and extent of the petitioner's property, financial, or other interest in the proceeding; and (3) the possible effect of any order which may

l "1

be entered in the proceeding on the petitioner's interest.

The petition should also identify the specific aspect(s) of the subject matter of the proceeding as to which petitioner wishes to intervene.

Any person who has filed a petition for leave to intervene or who has been admitted as a party may amend the petition without requesting leave of the Board up to 15 days prior to the first prehearing conference scheduled in the proceeding, but such an amended petition must satisfy the specificity requirements described above.

Not later than 15 days prior to the first prehearing conference scheduled in the proceeding, a petitioner shall file a supplement to the petition to intervene which must include a list of the contentions which are sought to be litigated in the matter.

Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted.

In addition, the petitioner shall provide a brief explanation of the bases of the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner intends to rely in proving the contention at the hearing.

The petitioner must also provide references to those specific sources and documents of which the petitioner is aware and on which the petitioner intends to rely to establish those facts or expert opinion.

Petitioner must provide sufficient information to show that a

genuine dispute exists with the applicant on a material issue of law or fact.

Contentions shall be limited to matters within the scope of the amendment under consideration.

The contention must be one which, if proven, would entitle the petitioner to relief.

A petitioner who fails to file such a

supplement which satisfies these requirements with respect to at least one contention will not be permitted to participate as a party.

Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing, including the opportunity to present evidence and c} oss-examine witnesses.

A request for a hearing or a petition for leave to intervene must be filed with the Secretary of the Coamission, U.S. Nuclear Regulatory Commission, Washington, DC 20555, Attention:

Docketing and Services

Branch, or may be delivered to the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, by the above date.

Where petitions are filed during the last 10 days of the notice period, it is requested that the petitioner promptly so inform the Commission by a toll-free telephone call to Western Union at 1-(800) 248-5100 (in Missouri 1-(800) 342-6700).

The Western Union operator should be given Datagram Identification Number N1023 and the following message addressed, to William H. Bateman, Director, Project Directorate IV-2, MS 0-13-E-18, Washington, D.C. 20555:

petitioner's name and telephone number; date petition was mailed; plant name; and publication date and page number of this FEDERAL REGISTER notice.

A copy of the petition should also be sent to the Office of the General

Counsel, U.S.

Nuclear Regulatory Commission, Washington, DC 20555, and to H. H. Philips, Jr., Esq., Winston 8 Strawn, 1400 L Street, N.W., Washington, D.C., 20005-3502, attorney for the licensee.

Nontimely filings of petitions for leave to intervene, amended petitions, supplemental petitions and/or requests for hearing will not be entertained absent a determination by the Commission, the presiding officer or the presiding Atomic Safety and Licensing Board that the petition and/or request

should be granted based upon a balancing of the factors specified in 10 CFR 2.714(a)(l) {i)-(v) and 2.714(d).

If a request for a hearing is received, the Commission's staff may issue the amendment after it completes its technical review and prior to the completion of any required hearing if it publishes a further notice for public comment of its proposed finding of no significant hazards consideration in accordance with 10 CFR 50.91 and 50.92.

For further details with respect to this action, see the application for amendment dated October 26, 1995, which is available for public inspection at the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, and at the local public document room located at the Richland Public Library, 955 Northgate Street,

Richland, Washington 99352.

Dated at Rockville, Maryland, this 27th day of February 1996.

FOR THE NUCLEAR REGULATORY COMMISSION J

mes W. Cliffo d, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation