Forwards Insp Rept 50-397/95-09 on 950305-0422 & Notice of Violation.Violation of NRC Concern Because Violation Resulted in Operation of Containment Atmosphere Monitors in Excess of Qualified Life
ML17291A811
Person / Time
Site: Columbia 
Issue date: 05/22/1995
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A812 List:
References
EA-95-069, EA-95-69, NUDOCS 9505260045
Download: ML17291A811 (6)


See also: IR 05000305/2004022

Text

PRIC)RlT'Y Z

REGULATORY(.4$8CC5lkP(tSH'RHKI'RKIBUTION SYSTEM (RIDS )

,DEACCESSION NBR:9505260045

DOC.DATE: 95/05/22

NOTARIZED: NO

DOCKET

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public

Powe

05000397

~

~

~

UTH. NAME

AUTHOR AFFILIATION

ACH,A.B.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V,

Washington Public Power Supply System

SUBJECT:

Forwards insp rept 50-397/95-09

on 950305-0422

6 notice of

violation. Violation of NRC concern

because

violation

rt;suited in operation of containment

atmosphere

monitors in

excess

of qualified life.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio ation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRCH/HHFB

OE DIR

RGN4

FILE

01

RNAL: LITCO BRYCEiJ H

NRC

PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

CLIFFORD,J

AEOD/DEIB

AEOD T

C

E CENTER

B

NUDOCS-ABSTRACT

OGC/HDS3

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL"RIDS" RECIPIENTS:.

PLEASE HELP US TO REDUCE i'PASTE! CONTACTTHE DOCUMENTCONTROL

DESh, ROONI Pl-37 (EXT. 504-20S3

) TO ELIMINATE)'OUR NAWIE FROif

DISI'RI8L'TIOY.LISTS FOR

DOCL:CLIENTS

YOL'ON"I'EEDI

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

grS ~KC( Ig

C

lt it*44

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON, TEXAS 76011 8064

HAY 22 l995

EA 95-069

Washington Public Power Supply System

ATTN:

J.

V. Parrish,

Vice President

Nuclear Operations

3000 George

Washington

Way

P.O.

Box 968,

MD 1023

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION

REPORT 50-397/95-09

AND NOTICE OF VIOLATION

This refers to the inspection

conducted

by Nr.

R.

C. Barr,

and the inspectors

identified in this report, of this office on March

5 through April 22,

1995.

The inspection

included

a review of activities authorized for your Washington

Nuclear Project

2 facility.

At the conclusion of the inspection,

the findings

were discussed

with those

members of your staff identified in the enclosed

report.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection

consisted of selective

examina-

tions of procedures

and representative

records,

interviews with personnel,

and

, observations

by the inspectors.

Based

on the results of this inspection,

certain of your activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

The violation is of concern

because it resulted

in

operation of selected

containment

atmosphere

monitors in excess

of their

qualified life and indicates

a potential for other components

having

been

assigned

an inappropriate qualified life.

Our inspectors

observed

inconsistencies

in the control

room

operators'mplementation

of your management

expectations

for formality, command

and

control, communications,

and log keeping.

Control

room operators effectively

implemented expectations

in responding

to the reactor trip of April 5,

1995,

but control

room operators

did not consistently

implement your expectations

during the reactor

shutdown of April 21

and

22,

1995.

Your continued

attention to improving consistent

operator

implementation of your expectations

is encouraged.

Section

2.1 of the enclosed

inspection report discusses

the identification by

your staff of a failed strut in the nonsafety outlet piping from Feedwater

Heater

6B.

While initial corrective actions

were viewed

as prompt

and

appropriate, it was noted that engineering

had communicated

to operations

the

importance of minimizing time in hot standby to mitigate the potential for

thermal stratification conditions.

We suggest

that you review this matter

95052b0045

950522

PDR

ADOCK 050003III7

8

PDR

Washington Public

Power Supply

System

related to your operations

to assess

the potential

challenge this presents

to

operators

during plant startup or shutdown, particularly with regard to

feedwater control.

In addition,

you identified that measuring

and test equipment deficiency

reports

were not properly dispositioned.

Your investigation of this matter

identified that

a low level individual willfullyviolated approved

procedures.

This violation appeared

to be

an isolated action

and your actions to correct

this problem were timely and appropriate.

In accordance

with

Section VII.B.(2) of 10 CFR Part 2, Appendix C,

"General

Statement of Policy

and Procedure for NRC Enforcement Actions," this violation was not cited.

You are required to respond

to this letter- and should follow the instructions

specified

in the enclosed

Notice when preparing your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

Your response

may reference

or

include previous docketed

correspondence, if the correspondence

adequately

addresses

the required

response.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10

CFR 2.790(a) of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed

in the

NRC Public Document

Room

(PDR).

To the extent possible,

your response

should not include any

personal

privacy, proprietary,

or safeguards

information so that it can

be

placed in the

PDR without redaction.

However, if you find it necessary

to

include such information, you should clearly indicate the specific information

that you desire not to be placed

in the

PDR and provide the legal

basis to

support your request for withholding the information from the public.

The responses

directed

by this letter

and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Docket:

50-397

License:

NPF-21

A. Bill Beach,

Director

Division of Reactor Projects

Washington Public

Power Supply

System

-3-

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

50-397/95-09

cc w/enclosures:

Washington Public Power Supply System

ATTN:

J.

H. Swailes,

WNP-2 Plant Manager

P.O.

Box 968,

MD 927M

Richland,

Washington

99352-0968

Washington Public

Power Supply System

ATTN:

G.

E.

C.

Doupe,

Esq.

3000 George

Washington

Way

P.O.

Box 968,

MD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington Public Power Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Manager

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

P.

R. Bemis, Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Winston

& Strawn

ATTN:

M. H. Philips,

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

'

Washington Public

Power Supply

System

-4-

MAY 22 1995

E-Nail report to D. Sullivan

(DJS)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DNB (IEOI)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

NS:

TWFN 9EIO)

Resident

Inspector

MIS System

RIY File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAME:

R:ti wn2tiwn509rp.rcb

To receive copy of document, indicate in box: "C" ~ Copy without enclosutes

" " ~ Copy with enclosures "N" ~ No copy

RIV:SRI

AC:DRP/

D:WC 0

D

RP

E

RCBarr

DDCham

in

KE

ins

A

B

5/(

/95

5/L /95

5/

/95

0

C

L

5/Fh/95

25003G

Washington Public

Power Supply

System

MAY 22 l995

E-Mail report to D. Sullivan

(DJS)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAME:

R:g wn2)wn509rp.rcb

To receive copy of document, indicate in box: "C" ~ Copy without enclosures

" " ~ Copy with enclosures "N" ~ No copy

RIV:SRI

RCBarr

5/(

/95

AC:DRP/

DDCham

in

5/L /95

0:WC 0

KE

ins

5/

/95

D

RP

E

A

B

5rRh/95