ML17291A803

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/95-17 on 950411-14.No Violations Noted.Addl Mgt Attention Needed to Ensure That All Personnel Aware of Program & to Reinforce Commitment to discrimination-free Work Environ
ML17291A803
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/12/1995
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A804 List:
References
NUDOCS 9505190081
Download: ML17291A803 (4)


See also: IR 05000397/1995017

Text

gP,R RECT

~G

'Ip0)0

4

0

0

+**p4

UNITED STATES

NUCLEAR R EG ULATORY COMMISSI ON

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

AR LINGTON, TEXAS 76011.8064

MAY

I 2 )995

Washington Public Power Supply System

ATTN:

J.

V. Parrish,

Vice President

Nuclear Operations

3000 George

Washington

Way

P.O.

Box 968,

MD 1023

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION

REPORT 50-397/95-17

This refers to the inspection

conducted

by Hr,

F.

R.

Huey of this office on

April ll 14,

1995.

The inspection

included

a review of activities

authorized for your Washington

Nuclear Project-2 facility.

At the conclusion

of the inspection,

the findings were discussed

with those

members of your

staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The results of this inspection

are documented

in the

enclosed report.

This inspection specifically reviewed the Supply System's

employee

concern

program (i.e., the Nuclear Safety

Issue Policy/Direct Line Program) to

determine the effectiveness

of previous

management

actions to address

the

weaknesses "identified in

NRC Inspection

Report,

dated January

12,

1994.

Although the weaknesses

were found to have

been appropriately

addressed,

additional

management

attention is needed

to ensure that all personnel

are

aware of the program

and to reinforce your commitment to a discrimination-free

work environments

In accordance

with 10 CFR 2.790 of the

NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

A. Bill Beach,

Director

Division of Reactor Projects

Docket:

50-397

License:

NPF-21

9505i9008f 9505f2

PDR

ADOCK 05000397

6

PDR

Washington Public Power Supply

System

Enclosure:

Appendix

NRC Inspection

Report

50-397/95-17

cc w/enclosure:

Washington Public Power Supply System

ATTN:

J.

H. Swailes,

WNP-2 Plant Manager

P.O.

Box 968,

MD 927M

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

G.

E.

C.

Doupe,

Esq.

3000 George

Washington

Way

P.O.

Box 968,

HD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington Public Power Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Manager

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

P.

R. Bemis, Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Winston

& Strawn

ATTN:

M. H. Philips,

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

Washington Public Power Supply

System

-3-

E-Mail report to D. Sullivan

(DJS)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IE01)

MAY l 2 l995

bcc distrib.

by RIY:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

Resident

Inspector

MIS System

RIV Fil e

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAME:

G:iEAiEA95-075.dft

RIV:EO/W

FRHuey

05/i /95

C:DRP/

DDCham

e

ain

05/ g /95

D:WCFO

KEPer

s

05/

/9

A

C

R

0

~

p

05/IZ /95

05/

/95

Washington

Public Power Supply

System

I

MAY 12 1995

E-Mail report to D. Sullivan

(DJS)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IEOI)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9EIO)

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAME:

G:iEAiEA95-075. dft

RIV:EO/W

FRHuey

05/<

/95

C:DRP/

D:WCFO

05/0 /95

05/

/9

C A

C

C

DDCham

e

ain

KEPer

s

P

05'>/95

05/

/95