ML17291A695

From kanterella
Jump to navigation Jump to search
Announces Integrated Assessment Team Insp During Period 950605-09 & 19-23
ML17291A695
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/13/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9503200085
Download: ML17291A695 (4)


Text

~C

~gg Rj0(

"Ip0 alt*Or

UN IT E D STATE 8 LEAR REGULATORY COMMISSIO REGION IV 611 RYAN PLAZA ORIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 NR t 3895 Mashington Public Power Supply System ATTN:

J: V. Parrish, Assistant Hanaging Director for Operations 3000 George Washington Way P.O.

Box 968, HD 1023

Richland, Washington 99352

SUBJECT:

INTEGRATED ASSESSHENT TEAH INSPECTION - NRC INSPECTION REPORT 50-397/95-08 The purpose of this letter is to announce an integrated assessment team inspection'at your Mashington Nuclear Project 2.

We have scheduled this inspection for the periods June 5-9 and 19-23, 1995.

The inspection objective will be to perform an integrated assessment of your performance with a focus of evaluating the effectiveness of your identification and resolution of performance issues.

The inspection will be conducted using Inspection Procedure

40500, "Effectiveness of Licensee Controls in Identifying, Resolving, and Preventing Problems."

To assist the team in its evaluation of your ability to identify and resolve

problems, we request that you provide to the Region IV office by Hay 15,

)995, either a summary or copies of the self-assessments that you have performed during the current SALP period and the results.

Should you have any questions concerning this inspection or the requested

material, please contact Hr.

'W. Ang at (510)975-0310.

Sine

ely, Docket:

50-397 License:

NPF-21 Thomas P.

Gw nn, Director Division of ctor Safety CC:

Washington Public Power Supply System ATTN:

J.

H. Swailes, WNP-2 Plant Hanager P.O.

Box 968, HD 927H

Richland, Washington 99352-0968 95032000S5 950313 PDR ADCICK 05000397 9

PDR

Washington Public Power Supply System p>b'cc'o DAB"'(IE01) bcc distrib.

by RIV:

L. J. Callan DRSS-F IPB Branch Chief (DRP/E, MCFO)

Senior Project Inspector (DRP/E, MCFO)

Leah Tremper (OC/LFDCB, HS:

TMFN 9E10)

Resident Inspector HIS System RIV File Branch Chief DRP/TSS)

B. Henderson

PAO, MCFO)

DOCUMENT NAME:

R:$ MNtIMN508LT.EEC To recelw copy of document. Erlcete in boxt C

~ Copy without enctosuree py with endoeuree N

~ No copy RIV:TL:DRS C:PSB E

D:DR

~

p D:DRS EECollins*

MPAn

  • TPGw n

03 08 95 03 08 95 95

  • Previously concurred OFFICIAL RECORD COPY I 95 TPGw

Washington Public Power Supply System Washington Public Power Supply System ATTN:

G.

E.

C. Doupe, Esq.

3000 George Mashington May P.O.

Box 968, HD 396

Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.

Box 43172 Olympia, Mashington 98504-3172 Washington Public Power Supply System ATTN:

D. A. Swank,

-MNP-2 Licensing Hanager P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

P.

R. Bemis, Regulatory Programs Hanager P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190

Prosser, Washington 99350-0190 Winston

& Strawn ATTN:

H.

H. Philips, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502

Washington Public Power Supply System bcc to DHB (IEOI) bcc distrib.

by RIV:

L. J. Callan DRSS-F IPB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Leah Tremper (OC/LFDCB, HS:

TWFN 9EIO)

Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

DOCUHENT NAHE:

R:i WNiIWN508LT.EEC To receive copy of document. Sdlcete in box:

C

~ Copy without endosures

~

py with enciosures "N" ~ No copy RIV:TL:DRS C:PSB E

EECollins*

WPAn

  • D:DR TPGw nn

~

p D:DRS TPGw 03 08 95 03 08 95 I 95 tO 95

  • Previously concurred OFFICIAL RECORD COPY