Text

~R RK01 (4

+0

~o Cy 0

0 $

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASH1NGTON, D.C. 2055&0001 March 9, 1995 LICENSEE:

Washington Public Power Supply System FACILITY:

WPPSS Nuclear Project No.

2

SUBJECT:

HEETING SUHMARY - TECHNICAL SPECIFICATION IHPROVEHENT PROGRAH On February 1,

1995, personnel from the Washington Public Power Supply System (the licensee) met with members of the NRC staff in Rockville, Haryland, to discuss the licensee's ongoing program for conversion to the new standard technical specifications (TS).

A list of attendees is provided in

Attachment:

1.

No handouts were used at the meeting.

The licensee requested the meeting to provide a status of their program to rewrite the WNP-2 TS to conform to the improved TS.

The licensee stated that the actual writing is underway, and that they expect to submit the new TS in September 1995.

They hope to implement the new TS about one year after submittal, subject to NRC approval.

The licensee expects to conform primarily to the BWR-6 standard, with some minor references to BWR-4.

The licensee stated that the only deviations they had currently identified were related to the station batteries.

In addition, the fuel mix used in the WNP-2 core may result in further differences with the BWR-6 standard TS.

The licensee described their use of an interdisciplinary team, including operations, engineering, technical

support, other support services, maintenance, and quality assurance personnel.

The team meets periodically with the Plant Hanager and his staff to ensure operations management's needs and expectations are identified and incorporated into the TS as they are developed.

The licensee stated that they felt this team was important to ensure interdepartmental communications on a highly significant change to the TS.

The licensee further stated that they expect to use a 24-month surveillance interval throughout the new TS.

The NRC staff suggested that the licensee clearly identify and justify any differences between the BWR-6 standard and the plant-specific TS, including any use of the BWR-4 standard.

The NRC also recommended that the licensee maintain the conversion package free from other TS changes related to changes in design, administration, or operation.

The latter changes should be submitted as separate TS.

3.50089 9503i700i7i 950309 PDR ADQCK 05000397 P

PDRI March 9, 1995 No regulatory positions were requested or taken.

Docket No. 50-397

Attachment:

Attendance List cc w/att:

See next page James W. Clifford, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation ISTRI.BUI ON:

Docket File PDIV-2 Reading W. Russell/F. Miraglia R.

Zimmerman E. Adensam T.

Quay J. Clifford E.

Peyton OGC E. Jordan ACRS (4)

J. Mitchell DOCUMENT NAME:

2-1-95.HTS OFC PDIV-2 LA PDI 2

M NAHE EPeytCn JClifford:ye DATE 3 8/95 3

7 95 OFFICIAL RECORD COPY

March 9, 1995 No regulatory positions were requested or taken.

Docket No. 50-397

Attachment:

Attendance List cc w/att:

See next page James W. Clifford, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation DISTRIBUTION:

Docket File PUBLIC PDIV-2 Reading W. Russell/F. Hiraglia R.

Zimmerman E. Adensam T. Quay J. Clifford E. Peyton OGC E. Jordan ACRS (4)

J. Mitchell DOCUMENT NAHE:

2-1-95.HTS OFC NAME DATE PDIV-2 LA EPeytPn 3 8/95 PDI 2

H JClifford:ye 3

95 OFFICIAL RECORD COPY

Washington Public Power Supply System MPPSS Nuclear Project No.

2 (WNP-2)

CC:

Hr. J.

H. Swailes WNP-2 Plant Hanager Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352-0968 G. E.

C. Doupe, Esq.

(Hail Drop 396)

Washington Public Power Supply System 3000 George Washington Way

Richland, Washington 99352-0968 Hr. Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P.O.

Box 43172 Olympia, Washington 98504-3172 Hr. D. A. Swank (Hail Drop PE20)

WNP-2 Licensing Manager Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352-0968 Hr. Paul R. Bemis (Hail Drop PE20)

Regulatory Programs Hanager Washington Public Power Supply System P.O.

Box 96&

Richland, Washington 99352-0968 Regional Administrator, Region IV U. S. Nuclear Regulatory Commission Harris Tower 5, Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of, Commissioners P.O.

Box 69

Prosser, Washington 99350-0190 Hr.

R.

C. Barr U. S. Nuclear Regulatory Commission P.O.

Box 69

Richland, Washington 99352-0968 H.

H. Philips, Jr.,

Esq.

Winston E Strawn 1400 L Street, NW.

Washington, DC 20005-3502 Hr. J.

V. Par rish (Hail Drop 1023)

Vice President Nuclear Operations Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352-0968

Attachment 1

MEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEM TECHNICAL SPECIFICATION IMPROVEMENT PROGRAM ATTENDANCE LIST FEBRUARY 1, 1995 Name Jim Clifford Chris Grimes Nanette Gilles Mark Reinhart Donald Hoffman Marsha Eades Affiliation NRC/NRR/DRPW/PD42 NRC/NRR/OTSB NRC/NRR/OTSB NRC/NRR/OTSB WPPSS/EXCEL Corporation WPPSS/Licensing

4 I

April 28, '1995 DISTRIBUTION'DIV-2 Reading EPeyton MEMORANDUMTO:

Rules Review and Directives Branch Division of Freedom of Information and Publications Services Office of Administration FROM:

SUBJECT:

Office of Nuclear Reactor Regulation llASHINGTON PUBLIC,'POWER SUPPLY SYSTE(I (uNP-2)

One signed original of the Federal Register Notice identified below is attached for your transmittal to the Office of the Federal Register for publication. Additional conformed copies

(

5

) of the Notice are enclosed for your use.

Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s):

Time for submission of Views on Antitrust matters.

Notice of Consideration of Issuance of Amendment to Facility Operating License.

(Call with 30-day insert date).

Notice of Receipt of Application for Facility License(s); Notice of Availabilityof Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

Notice of Availabilityof NRC Draft/Final Environmental Statement.

Notice of Limited Work Authorization.

Notice of Availabilityof Safety Evaluation Report.

Notice of Issuance of Construction Permit(s).

Notice of Issuance of Facility Operating License(s) or Amendment(s).

Order.

Il Exemption.

Notice of Granting Exemption.

Kj Environmental Assessment.

Notice of Preparation of Environmental Assessment, Receipt of Petition for Director's Decision Under 10 CFR 2.206.

Issuance of Final Director's Decision Under 10 CFR 2.206.

Other:

i DOCKET NO.

Attachment(s):

As stated Contact Ei leen Peyton Telephone:

415-1 306 DOCUMENT NAME:

To racalvo a copy of thla documant, Indicata in the box:

C

~ Copy with ut attachmant/ancioau OFFICE NAME DATE OFFICIALRECORD COPY E'

Copy with ttachmant/ancloaura

'N' No copy

jr

~ 4