ML17291A687

From kanterella
Jump to navigation Jump to search
Notification of Licensee Meeting W/Util in Arlington,Tx on 950314 to Discuss Results of Licensee Midcycle self-assessment & Communication Issues
ML17291A687
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/07/1995
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9503150056
Download: ML17291A687 (5)


Text

1 P,R RE0(

P0 pa 4if*J 4 UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PI.AZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 NR -7 I995 NOTICE OF LICENSEE MEETING Name of Licensee:

Washington Public Power Supply System Name of Facility:

Washington Nuclear Project 2

(WNP-2)

Docket Number:

50-397 Date and Time of Meeting:

Location of Meeting:

Purpose of Meeting:

March 14, 1995 8:30 - 10:30 a.m.

Region IV office, Arlington, Texas Training Conference Room Management meeting to discuss the results of the licensee's midcycle self-assessment and communication issues NRC Attendees:

Licensee Attendees:

L. J. Callan, Regional Administrator J.

H. Montgomery, Deputy Regional Administrator A. B. Beach, Director, Division of Reactor Projects (DRP)

J.

E. Oyer, Deputy Director, DRP K.

E. Perkins, Director, Walnut Creek Field Office T.

P.

Gwynn, Director, Division of Reactor Safety S. J. Collins, Director, Division of Radiation Safety and Safeguards O.

D. Chamberlain, Acting Chief, Project Branch E,

DRP T.

R. quay, Director, Project Directorate IV-2, Division of Reactor Projects, Office of Nuclear Reactor Regulation (NRR)

J.

W. Clifford, Senior Project Manager, NRR J.

V. Parrish, Vice President, Nuclear Operations P.

R. Bemis,

Manager, Regulatory and Industry Affairs G. 0. Smith, Director, guality Assurance J.

P.

Burn, Director, Engineering J.

H, Swailes, Plant Manager NOTE:

(1)

This meeting is open to attendance by members of the general public.

9503i50056 950307 PDR ADQCK 05000397 P

PDR L40v'2v

Washington Public Power Supply System (2)

NRC personnel, not listed above, that desire to attend this meeting should notify Dennis Kirsch by 4 p.m.

on March 10 at (510) 975-0290.

Approv d:

A. Bill Be ch, Director Division of Reactor Projects CC:

Washington Public Power Supply System ATTN:

J.

V. Parrish, Vice'President Nuclear Operations 3000 George Washington Way P.O.

Box 968, MD 1023

Richland, Washington 99352 Washington Public Power Supply System ATTN:

J.

H. Swailes, WNP-2 Plant Manager P.O.

Box 968, HD 927M

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

G.

E.

C.

Doupe, Esq.

3000 George Washington Way P.O.

Box 968, HD 396

Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.

Box 43172 Olympia, Washington 98504-3172 Washington Public Power Supply System ATTN:

D. A. Swank, WNP-2 Licensing Manager P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

P.

R.

Bemis, Regulatory Programs Manager P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190

Prosser, Washington 99350-0190

Washington Public Power Supply System Winston

& Strawn ATTN:

H.

H. Philips, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502

Washington Public Power Supply System ea -7 1995 Distribution:

E-Hail to:

CJG (Carol Gordon)

DMKl (D. H. Kunihiro)

BWH (Breck Henderson)

PHNS (Htg. Announcement NRC Attendees DHB (IE 45)

J.

L. Hilhoan, DEDR (HS 17G21)

H. L. Thompson, DEDS (MS 17G21)

W, T. Russell, 0/NRR (HS 12Dl)

A. C. Thadani, ADT/NRR (HS 12G18)

R.

P, Zimmerman, ADP/NRR (MS 12G18)

J.

Lieberman, D/OE (MS 7H5)

L. J. Chandler, OGC (HS 15B18)

OEDO RIV Coordinator (HS 17G21)

G ~

F. Sanborn, EO C. A. Hackney,

RSLO, RIV J.

T. Gilliland, PAO, RIV RA Secretary DRA Secretary Carol Gordon Division Secretary (DRP,

DRS, DRSS)

L. S, Ousley RIV File Coordinator)

RI RP/E DDChamberlain;df 3/7 /95 D:DRP 9 ABBeach 3/7 /95

Washington Public Power Supply System MAR -7 1995 Distribution:

E-Mail to:

CJG (Carol Gordon)

DMKl (D.

M. Kunihiro)

BWH (Breck Henderson)

PMNS (Mtg. Announcement Coordinator)

NRC Attendees DMB.(IE 45)

J.

L. Mi1hoan, DEDR (MS 17G21)

H, L. Thompson, DEDS (MS 17G21)

W, T. Russell, D/NRR (MS 12D1)

A. C. Thadani, ADT/NRR (MS 12G18)

R.

P.

Zimmerman, ADP/NRR (MS 12G18)

J, Lieberman, D/OE (MS 7HS)

L. J. Chandler, OGC (MS 15B18)

OEDO RIV Coordinator (MS 17621)

G

~

F. Sanborn, EO C. A. Hackney,

RSLO, RIV J.

T. Gilliland,

PAO, RIV RA Secretary DRA Secretary Carol Gordon Division Secretary (DRP,
DRS, DRSS)

L. S. Ousley RIV File RI

'P/E DDChamberlain;df 3/7 /95 0:0RP 96 ABBeach 3/7 /95