ML17291A439

From kanterella
Jump to navigation Jump to search
Notification of 941021 Significant Meeting W/Util in Arlington,Tx to Discuss Supply Sys Actions in Response to Pranks & Insp Program Perspectives
ML17291A439
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/11/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9410140031
Download: ML17291A439 (5)


Text

c,>~p,8 AEGISCg 0

~~a n

Vl Yr+

~

0

~**<<+

UNITED STATES CLEAR REGULATORY COMMISSION,

- REGION IV 611 RYAN PLA2A DRIVE, SUITE 400 ARLINGTON,TEXAS 76011.8064 OCT l

I 1994 NOTICE OF SIGNIFICANT MEETING Name of Licensee:

Washington Public Power Supply System Name of Facility:

Washington Nuclear Project No.

2 (WNP-2)

Docket Number:

50-397 Date and Time of Meeting:

'ocation of Meeting:

Purpose of Meeting:

NRC Attendees:

Licensee Attendees:

NOTE:

(1)

This meeting October 21, 1994 10:30 a.m.

12:30 p.m.

Region IV, Training Conference Room Arlington, Texas Management Meeting to Discuss:

Supply System Actions in Response to Pranks and Inspection Program Perspectives L. J. Callan, Regional Administrator J.

M. Montgomery, Deputy Regional Administrator J.

W. Roe, Director, Division of Reactor Projects III/IV, NRR A.

BE Beach, Director, Division of Reactor Projects T.

P.

Gwynn, Director, Division of Reactor Safety S. J. Collins, Director, Division of Radiation Safety and Safeguards K.

E. Perkins,

Director, Region IV Field Office DE F. Kirsch, Chief, Reactor Projects Branch E

J.

W. Clifford, Senior Project Manager, NRR J.

D. Wilcox, Senior Operations

Engineer, NRR G, West, Human Factors
Engineer, NRR W.

G. Counsil, Managing Director J.

V. Parrish, Assistant Managing Director for Operations P.

R. Bemis,

Manager, Regulatory Programs J.

A. Benjamin,

Manager, equality Assessments J.

C. Bell, Manager, Maintenance Services W.

G. Ehlers, Laborer T.

W. Slape, Painter III is open to attendance by members of the general public.

9410140031 941011 PDR ADOCK 05000397 P

PDR 0

Washington Public Power Supply System (2)

NRC personnel, not listed above, that desire to attend this meeting should notify D. Kirsch at (510) 975-0290 by COB on October 14, 1994.

Approved:

w A. ill Beach, Director Division of Reactor Projects CC:

Washington Public Power Supply System ATTN:

W.

G. Counsil, Managing Director 3000 George Washington Way P.O.

Box 968, MD 387

Richland, Washington 99352 Washington Public Power Supply System ATTN:

J.

V. Parrish, Assistant Managing Director for Operations 3000 George Washington Way P.O.

Box 968, HD 1023

Richland, Washington 99352 Washington Public Power Supply System ATTN:

J.

H. Swailes, WNP-2 Plant Manager P.O.

Box 968, HD 927M

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

G.

E.

C.

Doupe, Esq.

3000 George Washington Way P.O.

Box 968, HD 396

Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.

Box 43172 Olympia, Washington 98504-3172 Washington Public Power Supply System ATTN:

H. K. Kook, WNP-2 Licensing Manager P.O.

Box 968, HD PE20

Richland, Washington 99352-0968

Washington Public Power Supply System Washington Public Power Supply System ATTN:

P.

R. Bemis, Regulatory Programs Manager P.O.

Box 968, (Mail Drop PE20)

Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190

Prosser, Washington 99350-0190 Winston 8 Strawn ATTN:

M. H. Philips, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502

Washington Public Power Supply System OCT I

I l994 Distribution:

E-Hail copy to CJG (Carol Gordon)

DHK1 (D.

M. Kunihiro)

BWH (Breck Henderson)

DJS (D. J. Sullivan/ILPB)

DMB (IE 45)

J.

L. Hilhoan, DEDR (HS 17G21)

H. L. Thompson, DEDS (HS 17G21)

W. T. Russell, D/NRR (HS 12D1)

A. C. Thadani, ADT/NRR (HS 12G18)

L. A. Reyes, ADP/NRR (MS 12D9)

J.

Lieberman, D/OE (HS 7H5)

L. J. Chandler, OGC (HS 15B18)

J.

W. Clifford, Project Manager, NRR (HS 13E5)

OEDO RIV Coordinator (HS 17G21)

L. J. Callan, RA J.

H. Montgomery, DRA G.

F. Sanborn, EO C. A. Hackney,

RSLO, RIV J.

T. Gilliland, PAO, RIV NRC Attendees RA Secretary DRA Secretary Carol Gordon Division Secretary, DRP/DRS/DRSS L. S. Ousley RIV File R. Barr,,

SRI/WNP-2 RIV:C:DRP/E*

DFKirsch:lt PAO ~

RSLO ~

JTGilliland CAHackney D:

RP B each 10/

/94 10/) f/94 10/1I/94 10/Il /94

  • Previously concurred File Location:

U:)DRSP)PSI)W2)HEETNOTE.DFK

Washington Public Power Supply System OCT I

1 1994 Distribution:

E-Mail copy to CJG (Carol Gordon)

DMKl (D.

M. Kunihiro)

BWH (Breck Henderson)

DJS (D. J. Sullivan/ILPB)

"'DMB (IE 45)

J.'.

Milhoan, DEDR (MS 17G21)

H. L. Thompson, DEDS (MS 17G21)

W. T. Russell, D/NRR (MS 12Dl)

A.

CD Thadani, ADT/NRR (MS 12G18)

L. A. Reyes, ADP/NRR (MS 12D9)

J.

Lieberman, D/OE (MS 7H5)

L. J. Chandler, OGC (MS 15B18)

J.

W. Clifford, Project Manager, NRR (MS 13E5)

OEDO RIV Coordinator (MS 17G21)

L. J. Callan, RA J.

M. Montgomery, DRA G.

F. Sanborn, EO C. A. Hackney,

RSLO, RIV J.

T. Gilliland,

PAO, RIV NRC Attendees RA Secretary DRA Secretary Carol Gordon Division Secretary, DRP/DRS/DRSS L. S. Ousley RIV File R. Barr, SRI/WNP-2 RIV:C:DRP/E
  • DFKirsch:lt 10/

/94 PAO C

JTGilliland 10/.

/94 RSLO CAHackney 10/

/94 D:

RP B each 10/Ji /94

  • Previously concurred File Location:

U:(DRSP)PSI)W2)MEETNOTE.DFK