ML17291A188
| ML17291A188 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/05/1994 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17291A189 | List: |
| References | |
| NUDOCS 9407080057 | |
| Download: ML17291A188 (5) | |
See also: IR 05000397/1994020
Text
PRIORITY Z
(NUDOCS OFFSITE FACILITY)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9407080057
DOC.DATE: 94/07/05
NOTARIZED: NO
DOCKET
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
GWYNN,T.P.
"
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
SUBJECT:
Forwards insp rept 50-397/94-20
on 940613-17.No violations
noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PDIV-3 PD
INTERNAL: ACRS
AEOD/DSP/ROAB
AEOD/TTC
NRR/DORS/OEAB
NRR/PMAS/ILPB1
NUDOCS-ABSTRACT
OGC/HDS3
RES/HFB
EXTERNAL: EG&G/BRYCEgJ.H.
COPIES
RECIPIENT
LTTR ENCL
ID CODE/NAME
1
1
CLIFFORDiJ
2
2
AEOD/DEIB
1
1
AEOD/DSP/TPAB
1
1
DEDRO
1
1
NRR/DRCH/HHFB
1
1
NRR/PMAS/IRCB-E
1
1
DER
1
1
~REG~F
02
1
1'
RGN4
FILE
Ol
1
1
NRC PDR
1
1
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1'
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE O'ASTE! CONTACTTHE DOCUMENTCONTROL
DESK, ROOM PI -37 (EXT. S04-2083 ) TO ELIMINATEYOUR NAME FROM
DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
22
ENCL
22
I
R<0OCCg
0
~~c
<<+*++
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTONTEXAS76011;8064
JUL
5 (994
Docket:
50-397
License:
Washington Public Power Supply System
ATTN:
J.
V. Parrisli, Assistant
Hanaging
Director for Operations
3000 George
Way
P.O.
Box 968,
HD 1023
Ri.chland,
99352
SUBJECT:
NRC
INSPECTION
REPORT 50-397/94-20
This refers to the inspection
conducted
by Hr. C. J. -Paulk of this office, and
Hr. K. R. Naidu of the Office of Nuclear Reactor Regulation,
on June
13-17,
1994.
The inspection
included
a review of activities authorized for your
Washington Nuclear Project-2 facility.
At the conclusion of the inspection,
the findings were discussed. with you and those
members of your staff
identified -in the enclosed report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selecti've
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The results of this 'inspection
are documented
on
page
1, in the enclosed
report.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to'discuss
them with you.
Sincerely,
Thomas.
P.
Gwynn, Director
Division of Reactor Safety
Enclosure:
Appendix
NRC Inspection
Report
50-397/94-20
w/Attachment
cc w/enclosure:
(see
next page)
9407080057
940705
ADOCK 05000397
Q
Washington Public Power Supply
System
cc w/enclosure:
Washington Public
Power Supply System
ATTN:
J.
H. Swailes,
WNP-2 Plant Manager
P.O.
Box 968,
HD 927M
Richland,
99352-0968
Washington Public
Power Supply System
ATTN:
G.
E.
C.
Doupe,
Esq.
3000 George
Way
P.O.
Box 968,
HD 396
Richland,
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Warren Bishop,
Chairman
P.O.
Box 43172
Olympia, Washington
98504-3172
Washington Public
Power Supply System
ATTN:
H. K. Kook,
WNP-2 Licensing Manager
P.O.
Box 968,
HD PE20
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
P.
R. Bemis,
Regulatory
Programs
Manager
P.O.
Box 968,
(Hail Drop PE20)
Richland,
99352-0968
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser,
99350-0190
Winston
8 Strawn
ATTN:
H.
H. Philips,
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
Washington Public Power Supply
'System
-3-
E-Nail report to D. Sullivan
(DJS)
bcc to
DNB ( I EOl)
'cc
distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
RIV File
Leah Tremper,
OC/LFDCB, NS:
C. J.
Paulk,
T.
F. Westerman,
DRs
Resident
Inspector
NIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
MNBB 4503
RIV:RI
NRR:SRE
RIV:EB:C
AD D:DRS
D:DRP
D:DRS
CJPaul
KRNaidu
TFWesterman
JLPellet
BBeach~
TPGwynn
C
ZA 94
$ 94
/
94
/94
/'2l 94
Washington Public
Power Supply
System
E-Hail report to D. Sullivan
(DJS)
bcc to
DHB (IEOI)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
MCFO)
RIV File
Leah Tremper,
OC/LFDCB, HS:
C.. J.
Paulk,
T. F. Westerman,
DRs
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
HNBB 4503
RIV:RI
CJPaul
NRR:SRE
RIV:EB:C
KRNaidu
TFWesterman
AD D:DRS
JLPellet
D:DRP
BBeach~
D:DRS
TPGwynn
C~ /i-"I/94
/'4
/
/94
/94
W 94
'7 <94